Meeting with Duke Energy Carolinas, Oconee Flood Protection and the Jocassee Dam Hazard
ML082550290
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/28/2008
From:
Office of Nuclear Reactor Regulation
To:
Duke Energy Carolinas
References
Download: ML082550290 (7)


Text

Official *Use Only- Security Related Information Official Use Only- Security Related Information Oconee Flood Protection and the Jocassee Dam Hazard NRC Meeting with Duke Energy Carolinas August28,2008 U.S.NRC 1"'<nDn"'-~*=*oru.-....roo><""'""""

""'""""f!'.opkuMdiArfiwii'Unmrnl Official Use Only- Security Related Information

_ Official Use Only- Security Related Information Meeting Overview

  • Purpose of meeting
  • Basis for NRC concerns with external flood protection
  • Perspective of credible event protection

-* Summary

_ /~U.S.NRC 2

~ :;: :.:~ ;:; ~ :.:.~: :*,: :..:::.::::. Official Use Only- Security Related Information 1

Official .use Only- Security Related Information Official Use Only- Security Related Information Purpose of Meeting

  • Discuss the nature of NRC concerns regarding adequate flood protection at the Oconee Nuclear Station ("Oconee") site with Duke r Energy Carolinas, LLC. ("Duke")

representatives.

  • Communicate the NRC expectations on the nature of the response from Duke to the 10CFR 50.54(f) Request for Information letter.
  • ~.~~U.S.NRC

---~ ! '".,.,"""'"""""-"'"'"""-"'

l'>v<o*<lin~ l+opk ot~oll~< F.~"""""nl Official Use Only- Security Related Information 3

Official Use Only- Security Related Information Basis For NRC Concerns With External Flood Protection

Background

  • The Standby Shutdown Facility (SSF) was.

" constructed to mitigate fire, sabotage, and flood**

induced station blackout events by providing reactor coolant pump seal cooling, primary, and secondary makeup for all three Oconee units.

  • The reference of the walls for flood protection to

. 5 ft (801' above MSL) is in the FSAR.

4 Official Use Only- Security Related Information 2

Official. Use Only- Security Related Information Official Use Only- Security Related Information Basis of NRC Concerns With External Flooding Protection Adequate Protection Issue

  • The Jocassee Dam Failure Inundation Study (FERC Project No. 2503) was completed and predicts an Oconee site flood height range of 12.5 feet to 16.8 feet.
  • The only study on record.
  • Based on the FERC study, the SSF does not appear to be available after Jocassee Dam failure. J 5

Official Use Only- Security Related Information

  • Official Use Only- Security Related Information Basis of NRC Concerns With External Flooding Protection (Cont'd)
  • Adequate Protection Issue (Cont'd)
  • In the event of a catastrophic flood which would render the switch yard (offsite power) and Keowee Dam unavailable, the SSF is the only site protection to provide defense-in-depth for Oconee.
  • Floods in excess of 5 ft could lead to three-unit core damage and radiological release event.

6 Official Use Only- Security Related Information 3

Official .use Only- Security Related Information Official Use Only- Security Related Information

  • sasis of NRC Concerns With External Flooding .Protection {Cont'd)

Random Dam Failure Frequency Issue

  • NRC communicated the underestimated random failure frequency to Duke in June, November, and December 2007.

7 Official Use Only- Security Related Information 4

Official Use Only- Security Related Information Perspective of Oconee Credible Event Protection 2 X 10-4 General Loss of Steam Small Random Medium Large Transients Offsite Generator Break Failure of Break Break Power Tube LOCA Jocassee LOCA LOCA Rupture Dam Adequate Protection  ?* Adequate Protection Assured Assured 7U.S.NRC l:NJTED ~TAn_:.' :'l'l'CLF.A R Rt:Gt:UTORY t:OMMISSIO~

Protecting People and the Env ironment Official Use Only- Security Related Information 8

Officiai*Use Only- Security Related Information Official Use Only- Security Related Information 10CFR 50.54(f) Letter Issues and NRC Expectations

1. Explain the bounding external flood hazard at Oconee and the basis for excluding consideration of the external flood hazards, such as those described in the Inundation Study, as the bounding case.

NRC expectation for response:

Include details on bounding floods which can impact the ability to safely shut down the plant and maintain it in a safe condition.

9 Official Use Only- Security Related Information Official Use Only- Security Related Information Information Request *Letter Issues and Staff Expectations

2. Provide your assessment of the Inundation Study and why it does or does not represent the expected flood height following a Jocassee Dam failure.

NRC expectation for response:

Provide an assessment of the validity of the inundation study. Address assumptions and safety margins for study parameters and boundary conditions.

'10 Official Use Only- Security Related Information 1

Official-Use Only- Security Related Information Official Use Only- Security Related Information Information Request Letter Issues and Staff Expectations

3. Describe in detail the nuclear safety implications of floods that render unavailable the SSF and associated support equipment with a concurrent loss of all Alternating Current power.

NRC expectation for response:

Provide an assessment of remaining credited defense-in-depth for the Oconee units following loss of the SSF.

On complete loss of all defense-in-depth and severe flood, provide details of the consequences to the site (e.g., accident sequence analyses addressing release consequences, timeframes, dose calculations, etc.).

Include emergency planning contingencies.

!7U.S.NRC...,

,,,.,.,.,,.,"'u..o..<>-un""<""-"'

"~"~' P....,k.~J *~~c.,.;,_.,..

Official Use Only- Security Related Information 11

\

Official Use Only- Security Related _Information Summary

  • Our concern regarding external flooding at Oconee is an adequate protection issue.
  • As such, we want to emphasize the importance of taking prompt action to address this issue.
  • The NRC expects a high quality, technically defensible, and timely formal written response.
  • Duke's response to the 10CFR 50.54(f) letter will contribute to NRC's decision-making regarding future regulatory action on this issue.

12 Official Use Only- Security Related

  • Information 2