ML20247E650

From kanterella
Jump to navigation Jump to search
Amend 120 to License DPR-61,changing Tech Specs 3.17.1, Axial Offset & 3.17.2, LHGR, to Allow Coastline Operation of Plant at End of Cycle 15
ML20247E650
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 07/20/1989
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20247E648 List:
References
NUDOCS 8907260250
Download: ML20247E650 (7)


Text

.

4 47 v

.(}inosa ..'; g[og UNITED STATES j 34 =g NUCLEAR REGULATORY COMMISSION

' J 73 -E WASHINGTON, D. C. 20555

,o py *=***

CONNECTICUT YANKEE ATOMIC POWER COMPANY DOCKET NO.'50-213 HADDAM NECK PLANT

, AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.120 License No. DPR-61

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Connecticut Yankee Atomic Power (the' licensee),datedApril 14, 1989, as supplemented June 16, 1989, complies with the standards and requirements of the Atomic Energy Act of 1954. as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B ., The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; I

i C .- There is reasonable assurance (l) that the activities authorized by

this amendment can be conducted without endangering the health and

' safety of the public, and -(ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common.

defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all' applicable requirements have been satisfied. .

i 1

I G907260250 890720  ;

PDR ADOCK 05000213 P i PDC l

-_-_L-__-_- ___---_-._-w- - - - - - - - - - --

2. Accordingly, the license is amended by changes to the Technical i Specifications as indicated in the attachment to this license amendment, '

and paragraph 2.C.(2) of. Facility Operating License No. .DPR-61 is hereby 1 amended to read as-follows- J

.l (2) . Technical Specifications 1 The Technical Specifications contained in Appendix A, as revised i through Amendment No.120, are hereby incorporated in the license.

The. licensee shall operate the facility in accordance with the i Technical Specifications.

3. This license amendment is effective as of the date of issuance, to be implemented within 30 days of issuance. ,

1 FOR THE NUCLEAR REGULATORY COMMISSION d

oh 4..Stolz, Direct j Pr ect Directorate -

vision of Reactor rojects I/II Offfee of Nuclear. Reactor Regulation

Attachment:

Changes to the Technical Specifications l Date of Issuanco: July 20,1989 l

i e

i

{

l  !

ATTACHMENT TO LICENSE AMENDMENT N0. 120 FACILITY OPERATING LICENSE'NO. DPR-61 DOCKET NO. 50-213 Replace the following pages of the Appendix "A" Technical Specifications with the. enclosed pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.

Remove Insert 1-Sc 1-Se 3-30 3-30 Figure 3.17-ic 3-31a 3-31a

VENTING 1.39 VENTING is the controlled process of discharging air or gas from a confinement to maintain temperature, pressure, humidity, concentration or other operating condition, in such a manner that replacement air or gas is r.ot provided or required during venting. Vent, used in system names, does not imply a VENTING process.

END-OF-CORE LIFE

  • 1.40 END-OF-CORE LIFE shall correspond to a reactor operating condition with all control rod banks fully withdrawn, essentially 0 ppm boron concentration in the reactor coolant, and the Reactor Coolant System average temperature (Tavg) no longer maintained at normal operating temperature or the normal rated thermal power (RTP) no longer maintained.

)

i l

{

i l

1-5c Amendment No.. gg,120 j

3.17 POWER DISTRIBUTION LIMITS 3.17.1 AXIAL-OFFSET l

FOUR LOOPS OPff,,A,llE 1'

LIMITING CONDITION FOR OPERATION 3.17.1.1 The AXIAL OFFSET shall be maintained within the limits of figures 3.17-1 a, b, or c. l APPLICABILITY: MODE 1 ABOVE 40% cf RATED THERMAL POWER. I ACITE:

With the AXIAL OFFSET outside the Acceptable Operation Limits specific in the above figures, within 15 minutes initiate corrective action and continue the corrective action so that the Axial 0FFSET is within limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than 40% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVEILLANCE REQUIREMENTS

a. The AXIAL OFFSET shall be determined to be within the Acceptable Operation Limits of Figures 3.17-la, b, or c by monitoring the AXIAL l OFFSET using at least two OPERABLEI excore Power Range channels and  :

applying the excore/incore correlation on a continuous basis.

b. The excore/incore correlation shall be verified at least once per 31 EFPD and adjusted at least once per 92 EFPD using the results of the measurements obtained in accordance with Specification 3.17.2.
c. iihe excore/incore correlation shall be determined after each fuel loading or major change in excore Power Range instrumentation prior to exceeding 80% of RATED THERMAL POWER.
d. The excore Power Range detectors shall be calibrated / correlated  !

relative to the Novable Incore Detector System measurements within 7 days after completion of incore measurements.

3*

Am endment No. 120 4 i

~ -

m.

.gn. -

a 1

  • e.

~

FIGURE 3.17-3C: POWER LEVEL VS.- RXIAL OFFSET LIMITS,

.r.

CYCLE 15 COR$1DOWN. FOUR LOOP SPERRTION *

. 320 1

t I

- _-- t

' l

' (-13,100)- --

300 -

l (20.100) '

1

... _ , - -l _. -

= _ [, I <

j

,j

_! I

___ __ L._ __- l 1

4/ I

. go Il  !

! 1 I- l t  !.

g .

l J- l 'J' .

i I!ji)l J j8 l

} 8 I '

g {

..ll' l

~

y -.

3...,_l ,. ar(.30,70)

.-. =

(20,70) .

w_ _ _. w_ .I k '

.h. J II

  1. ' 1 J !JJ_

N so IIII I '

!  !' I I I IIIlII W l' l ' l l llIlT' ' j i

                                                       =J                                                                                                                                                           i             '

l 4>l  ! l i. g - 4 h ___2. g.._._ ___ ___ _ _ _ a JI _ ,;_;1 40  ! '!I li

                                                                                                                                                  ,II                                    -(-30.40)                                                                                                                                                                                                     (20.40)

I.,_._ w_'j w r _._ _ - I .i 4 l

                                                                                                                                           -         ]'                                                                         l l                           _                   ..                            -      .                                                                                                                                          .;

i 4

                                                                                                                                           --               _       _     _ _         __. . .                 ..                .        ..                                                                    =            _

20 ' ' i i l ' i I ' l I 1

                                                                                                                                                                           -'l(..              .     .,

1

                                                                                                                                        .         .       .                 \.              .     -        _._         _._                                     -            -               . .                           _       _                   .        .   ....                   . __.

I

                                                                                                                                                               ..               =                          .                  ..      .            .

l 0 Il

                                                                                                                  -40                                                                           -20                                                                                        0                                                                                 to                                                                                 40             3 Ak1RL OrF5ET EX)                                                                                                                                                                                                                               i Amendment No.120
   .x                                                                                                                                                                                                                                                                                                                                                                                                                                                                       .

e se 6

e - - POWER DISTRIBUTION LIMITS-357.2 LINEAR'HEATGENERATIONRATE FOUR LOOPS OPEPATING LIMITIhG CONDITION FOR OPERATION 2.17.2.1 All LINEAR HEAT GENERATION RATES (LHGRs). shall not exceed the following kilowatt per foot limits for cycle residency time:

a. Less than 125 EFPD -

13.3kW/ft

b. 125 To 250 EFPD 13.3 kW/ft
c. Greater Than 250 EFPD But Less Than END 0F-CORE LIFE 14.6 kW/ft
d. Greater than END-0F-CORE LIFE During coastdown 13.5 KW/ft l I i APPLICABILITY: MODE 1, above 40% of RATED THEF. MAL POWER.

ACTION: With the LHGR of any fuel rod exceeding the limits specified above, initiate corrective action within 15 minutes and continue corrective > action so that the LHGR is within the limits within 2 hours or reduce THERMAL POWER to less than 40% of RATED THERMAL POWER within tht next 4 hours. 1 { t SURVEILLANCE REQUIREMENTS '

1. LHGR's shall be determined to be within the above limits by a core power distribution measurement using the Moveable Incore Detector System and in consideration of the factors listed in 2 below: -

4

a. At least once per 31 EfPD, p.

Prior to THERMAL POWER exceeding 80% of RATED THERMAL POWER after each fuel loading, and

c. After reaching 100% of RATED THERMAL POWEP. and achievirg equilibrium xenon conditions after each refueling.

1 i l i I I 3 31g Amendment No.120 1 I __.____________m _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _}}