Amend 109 to License DPR-61,revising Table 3.22-2 Fire Detection Instruments to Reduce Number of Smoke Detectors Available in Containment from 23 to 22 & Incorporating New Section of Sprinkler Protection Into Tech Spec 3.22G
ML20196D854
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/06/1988
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20196D848 List:
References
NUDOCS 8812090216
Download: ML20196D854 (5)


Text

'

e o ne

/  %, UNITED STATES

. g g NUCLEAR REGULATORY COMM!.SSION t  :) wAsmNGTON, De C. 206L

\...../

CONNECTICUT YANKEE AT0!!!C POWER COMPANY DOCKET NO. 50-213 HADDAM NECK PLANT AMEWb-J.NT TO FACILITY OPERATING LICENSE Amendment No.109 License No. DPR-61

1. The Nuclear Regulatory Comission (the Comission) has found that:

A. Thc application for amendment by Connecticut Yankee Atomic Power (thelicensee),datedSeptember 13, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; D. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C. There is reasonable assurance (i) that the a.tivities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have -

been satisfied.

i l

l l 8912090216 881206 PDR ADOCK 05000213 t P PDC

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment. ,

and paragraph 2.C.(2) of Facility Operating License No. DPR-61 is hereby '

amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.109 , are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specif'. cations.

3. This license amendment is effective as of the date of issuanc.e. to be implemented within 30 days of issuance.

FOR THE NUCLEAR REGULATORY C0K!!!SS10N hW John F. Stolz, Director A

Project Directorate 1-4 Division of Reactor Projects 1/11 Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: December 6, 1988

9 t'TACHMENT TO LICENSE AMENOMENT NO.109 FACILITY OPERATING LICENSE NO. OPR-61 DOCKET NO. 50-213 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by amendment number and contain vertical lines indicating the areas of chanc.a.

Removo Insert Table 3.22-2 Table 3.22-2 33.4 3-44 j

l l

e TABLE 3.22-2

, FIRE DETECTION INSTRUMENTS Minimum Number Minimum Number Smoke Detectors Heat Detectors Operable / Detectors Operable / Detectors location Available Available

1. Containment 19/22* 24/32**
2. Cable Spreading Area 21/28*
3. lA Diesel Generator Room 4/5
4. 18 Diesel Generator Room 4/5
5. Switchgear Room 35/35
6. Containment Cable Vault 3/4
7. Waste Disposal Building 2/3 ,
8. Auxiliary Feedwater Pump Room 1/2
9. Primary Auxiliary Building Zone 1(A 1A) 1/2 Zone 2(A-1A) 3/4 Zone 3(A 1A) 1/1 Zone 4(A-1A) 1/1 Zone 5(A-II) 2/3 Zone 6(A-IN) 2/3 Zone 7(A-IP) 1/2 Zone 8(ale. -

A lF) 1/1

10. Control Room (excluding Computer Room) 13/18*
11. Screen Well Building Zone 1 P-1A 8/9*"

P 1B Zone 2(PlC) 1/1

12. Spent Fuel Building 5/6 No two adjacent detectors shall be inoperable at the same time.

Minimum 6 heat detectors per reactor coolant pump must be operable.

One detector inoperable cannot be one of the three O ) existing detectors on the upper level of the Screenwell Building.

Amendment Nos. 45/ 15. 81. 195. 109

G. Sorav and/or Sorinkler Systems G.1 The particular spray and/or sprinkler systems located in the following areas shall be operable at all times when a fire hazard exists within the area protected by the applicable spray and/or sprinkler system:

a. Maintenance Shop Annex (old warehouse)
b. High-Pressure Turbine Housing
c. Hydrogen Seal Oil Unit
d. Turbine Lube Oil Reservoir
e. Turbine Building E1.21'-6'
f. Turbine Building Mezzanine
g. Turbine Building beneath the Turbine Floor and under the High Pressure Turbine * (Note: This "*' applies only to sprinklers between column lines C and D and column numbers 8 and 12 under the 59' 6" elevation)
h. Turbine Building Mezzanine under Generator
1. Oil Storage Room J. Turbine Building Crane Well
k. Cable Spreading Area (Mezzanine Level)*
1. Diesel Generator Room A
m. Diesel Generator Room B  ;
n. Primary Auxiliary Building Sprinkler System *
o. Service Building Sprinkler System -
p. Chemistry Lab Sprinkler System
q. Machine Shop Sprinkler System L
r. Intake Structure (Diesel Fuel Storage Room)
s. Diesel Fire Pump 3prinkler System i
t. Cable Spreading Area Hallway *
u. Intake Structure (Service Water Pumps Water Curtain)*

l

  • Areas where redundant' systems or components could be damaged.

3'44 Amendment !!os. 24, 26, /5, 15, 109 i 1

- - - - - - . . - _ .- - _ . _ _ . _ . , _ _ _ . . , _ _ _ _ _ _ _ _ _ - . . _ _ _ _ _ , . , , _ _ _ _ _ _ _ _ . _ _ . , . _ . , . _ _ _ . _ . .