ML20057E191
| ML20057E191 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 10/04/1993 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20057E190 | List: |
| References | |
| NUDOCS 9310080080 | |
| Download: ML20057E191 (5) | |
Text
.
. ps escoq
+
UNITED STATES i
4
[
]
NUCLEAR REGULATORY COMMISSION f
WASHINGTON, D.C. 20055-0001
%,.....[
l i
CONNECTICUT YANKEE ATONIC POWER COMPANY l
DOCKET NO. 50-213 HADDAM NECK PLANT j
AMENDMENT TO FACILITY OPERATING LICENSE t
Amendment No.. 166
- License No. DPR-61; 1.
The Nuclear Regulatory Commission (the Commission) has found thath A.
The application for amendment by Connecticut-_ Yankee Atomic Power _-
Company (the licensee), dated July 21,-1993, complies with the
. standards and requirements of the Atomic Energy Act of 1954,.as..
amended (the Act). and the Commission's rules and regulations set '-
l; forth in 10 CFR Chapter I;~
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission;_
C.
There is reasonable assurance (i) that th'e activities-authorized by this amendment can be conducted without endangering the health and i
safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations;_
D.
The issuance of this amendment will not be inimical' to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment'is in accordance with 10 CFR Part 51 of the Commission's regulations' and all applicable'. requirements have been satisfied.
9310000000 931001
~
- PDR ADOCK 05000213 P. -
PDR;'.
4-t-
y N
pg y
4 d
ae.t aw-6 w
=we Bw--
D
--y at.
-W r
. l 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-6I is hereby amended to read as follows:
(2) Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 166 are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of issuance, to be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION r
j
\\
f l Jo F. Stolz, Director.
\\
oject Directorate I Division of Reactor Projects - I/II i
Office of Nuclear Reactor Regulation i
Attachment:
Changes to the Technical Specifications Date of Issuance: October 4, 1993 i
1 f
k I
L ATTACHMENT TO LICENSE AMENDMENT NO.166-FACILITY OPERATING' LICENSE NO. DPR-61 DOCKET NO. 50-213 i:;
i Replace the following pages of the' Appendix A _ Technical Specifications with the enclosed pages. --The revised pages are. identified by amendment number and contain vertical lines indicating the areas' of change.
Remove Insert-j 3/4 3-45 3/4 3-45 3/4 3-47 3/4-3-47 l
1 f
i I
i i
TABLE 3.3-9 FjDI0 ACTIVE LIOUID EFFLUENT MONITORING INSTRUMENTATION E
MINIMUM #
.x INSTRUMENT OPERABLE ACTION R.-
^
1.
GROSS RADI0 ACTIVITY MONITORS PROVIDING
' AUTOMATIC TERMINATION OF RELEASE a.
-Waste and Recycle Test Tank 1
46 Discharge Line b.
Steam Generator Blowdown Line*
1 47
- 2. -
GROSS-RADI0 ACTIVITY MONITORS NOT PROVIDING AUTOMATIC TERMINATION OF RELEASE a.
Service Water Effluent I.ine 1
48 g
b 3.
FLOW RATE MEASUREMENT 1
a.
Waste and Recycle Test Tank' Discharoe Line 1
49 b.
Steam Generator Blowdown Line
-N.A.
.c.
Discharge Canal N.A.
(f Not applicable while in Mode 5'or 6.
.a
]
Flow is determined by the use of valve curves for the purpose of determining flows only.
O
- Discharge canal flow'is determined by the use of pump curves.
y r
m
.~. ~.
-..,_-,.,.,~...,,...m......w.-
,,. _ m
TABLE 4.3-7 g
RADI0 ACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REOUIREMENTS
- g CHANNEL 3
CHANNEL SOURCE CHANNEL FUNCTIONAL
'R INSTRUMENT CHECK CHECK-CALIBRATION TEST
-1.
' GROSS RADI0 ACTIVITY M0llITORS PROVIDING ALARM AND AUTOMATIC TERMINATION 0F RELEASE
- a. = Waste and Recycle Test Tank Discharge Line D(1)
P
.R(2)
Q(3).
b.
Steam Generator Blowdown Line*
D(1).
R(2)
Q(3)
M R
2.
GROSS RADI0 ACTIVITY MONITORS-PROVIDING ALARM BUT NOT PROVIDING-AUTOMATIC Y
TERMINATION OF RELEASE O
- a.. Service Water Effluent
'D(1).
M R(2)
Q(3)
Line 3.
FLOW RATE MEASUREMENT a.
Waste and-Recycle Test Tank Discharge Line.
D(1)
N.A.
R; N.A.
E.
B. : Steam Generator ~ Blowdown Line D(5)'
N.A.
N.A.
N.A.
l c.
Discharge-Canal'
'D(4)
N.A.
N. A'.
N. A. -
g 4
-w.
Not applicable while in MODE C or 6.
j l
.1.o.
..-~
. u..
~
.......l.m..
.x....i....
m
-