ML20236K425

From kanterella
Jump to navigation Jump to search
Advises That Requalification Program Evaluation for Facility Will Not Be Performed Since Requalification Exams Conducted in Nov,Per EDO 870911 Suspension of Evaluations.Postponement of Evaluation Suggested
ML20236K425
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/05/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hannon J
Office of Nuclear Reactor Regulation
References
NUDOCS 8711090224
Download: ML20236K425 (1)


Text

NOV 5 - 1987 MEMORANDUM FOR: J. N. Hannon, Chief, Operator Licensing Branch, Division-of License Performance and Quality Evaluation FROM: J. E. Gagliardo, . Chief, Operations Branch, Division of Reactor Safety, RIV

SUBJECT:

OPERATOR REQUALIFICATION PROGRAM EVALUATION AT WATERFORD 3 I 4

Examiner Standard 601, Section C, requires that a requalification program evaluation be performed at all licensed power facilities at least once every ,

two years. The Waterford 3 facility has not had a requalification program l evaluation since it began commercial operation in September 1985. Due to the suspension of requalification program evaluations by the EDO.on September 11, 1987, an evaluation will not be performed at Waterford 3 during FY 88 since their scheduled requalification examinations are conducted in November.

Region IV has no reservations with postpuning this evaluation since the  !

licensees did very well during both initial, upgrade,-and replacement license )

examinations. Should you have any questions regarding this matter, please l contact John Pellet, Chief, Operator Licensing Section, RIV, at FTS 728-8159.

Ddelg ct~r  ;.,

\

lJ.E.G2gedi j J. E. Gagliardo, Chief Operations Branch bec:

DMB:DN:50-382 : 1 RIV File I J. Pellet S. McCrory

]

i l

l l

l RE p. ( C:0LS4[ C:0B j SLMcCror :cs JLPellet JEGagli do 11/y/87 11/4/87. 11/g/{ p 8711090224 871105 7 gD~

PDR ADOCK 05000382 V PDR j l

1

- _ - _ _ _ -