ML20197J625

From kanterella
Jump to navigation Jump to search
Revised Notification of Licensee Meeting with Licensee on 981216 in Arlington,Tx to Discuss Actions Being Implemented in Performance Improvement Plan for Selected Weaknesses Identified During Architect Engineer Insp
ML20197J625
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/09/1998
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9812150164
Download: ML20197J625 (5)


Text

. _

-... _ _ _ _.. _ _ --.__. _. ~ __ _.. ~.

f necoq'g.

UNITED STATES

[

g NUCLEAR REGULATORY COMMISSION REGION IV 611 HYAN PLAZA DRIVE, sulTE 400

%,*****,,[,

ARLINGTON. TEXAS 76011 8064 DEC - 91998 REVISION REVISION -

REVISION REVISION REVISION REVISION Change of floor at the Arlington office and additional attendees.

NOTICE OF LICENSEE MEETING l

l Name of Licensee:

Entergy Operations, Inc (EOl)

Name of Facility:

Waterford 3 Docket:

50-382 Date and Time December 16,1998 of Meeting:

1-3 p.m. (CST)

Location of Meeting:

Region IV office, Arlington, Texas i

Division of Reactor Projects (DRP) Conference Room, Third Floor Purpose of Meeting:

Discuss the actions being implemented in the Performance

. Improvement Plan for selected weaknesses identified during the Architect Engineer inspection NRC Attendees:

Ellis W. Merschoff, Regional Administrator Thomas P. Gwynn, Director, DRP l

John N. Hannon, Director, Project Directorate IV-1, Office of Nuclear Reactor Regulation (NRR)

Arthur T. Howell, Ill, Director, Division of Reactor Safety (DRS)

Phil H. Harrell, Chief, Project Branch D, DRP Thomas Stetka, Acting Chief, Engineering Branch, DRS Chandu Patel, Project Manager, Project Directorate IV-1, NRR l

Ray Azua, Senior Project Engineer, Project Branch D, DRP Licensee Attendees:

Chuck Dugger, Vice President, Operations Ted Leonard, General Manager, Plant Operations Al Wrape, Director, Engineering Early Ewing, Director, Nuclear Safety and Regulatory Affairs i

Greg Pierce, Director, Quality Everett Perkins, Licensing Manager Oscar Pipkins, Licensing Engineer I

l i

9812150164 981209 PDR ADOCK 05000302 s

G PDR t

i

l 5

Entergy Operations, Inc.

NOTE:

(1)

This meeting is open to attendance by members of the general public.

(2).

NRC personnel, not listed above, that desire to attend this meeting should notify Phil Harrell at (817) 860-8250 by COB on December 11,1998.

Approved B -

/

Ibib~

x _)6 mas P. dwfnefbirector l

i Division of Reactor Projects j

cc:

l Charles M. Dugger, Vice President Operations -Waterford 3 Entergy Operations, Inc.

I P.O. Box B l

Killona, Louisiana 70066 l

Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

i P.O. Box 31995 Jackson, Mississippi 39286-1995 j

Vice President, Operations Support l

Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.

P.O. Box B l

Killona, Louisiana 70066 l

l Manager-Licensing Manager l

Waterford 3 SES l

Entergy Operations, Inc.

l-P.O. Box 8 Killona, Louisiana 70066

{

r l

I t

l l

Entergy Operations, Inc. l Chairman Louisiana Public Service Commission One American Place, Suite 1630 Baton Rouge, Louisiana 70825-1697 Director, Nuclear Safety &

Regulatory Affairs Waterford 3 SES Entergy Operations, Inc.

P.O. Box B Killona, Louisiana 70066 l

William H. Spell, Administrator Louisiana Radiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 Parish President St. Charles Parish P.O. Box 302 Hahnville, Louisiana 7005.7 Winston & Strawn i

1400 L Street, N.W.

Washington, D.C. 20005-3502 1

I

4 Enterpy Operations, Inc. DEC - 91998 l

l l

E-Mail To:

FOR

( )

NRC Attendees PMNS Mtg Announcement Coordinator JKR DEDE PAB DEDR FJM A/D/NRR BWS Acting, ADT/NRR l

BAB2 Acting ADP/NRR OEMAIL D/OE LJC OGC CAH C, A. Hackney, RSLO GMV M. Vasquez, Acting EO BWH B. Henderson, PAO JAC1,CJG RA Secretaries LAT,DLF DRP Division CLG, LMB, NLH DRS Division CMS, CAM 3, WSW ONMS Division LSO L. Ousley LPL P.Longdo cc:

i DMB (IE 45)

OEDO RIV Coordinator (16E15)

ORA File i

RIV File I

i DOCUMENT NAME: R:\\_WA'nWT1216MN.REV To receive copy of document, Indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy RIV:PE:DRP/D C:DRP/D PAO (bW RSLO (n D:DRS Q GAPick;dfW

(,<PHHarrelfdW BWHenderson CAHackney ATHowe @

samadem/98M

()

12/ ? /98 /

d 12/'l /987' 12/4 /98 12/ 7 /98 12/ 9

=

unmanuusashinummisiimmum

= ; =

suissa

==

miiniin mmmun maism D:DRP TPGwynn \\N l

12/q /98 V l

OFFICIAL RECORD COPY I

. g._.

Entergy Operations, Inc. DEC - 91998 E-Mail To:

FOR

( )

NRC Attendees PMNS Mtg Announcement Coordinator JKR DEDE PAB DEDR FJM A/D/NRR BWS Acting, ADT/NRR BAB2 Acting ADP/NRR OEMAIL

' D/OE LJC OGC CAH C. A. Hackney, RSLO GMV M. Vasquez, Acting EO BWH B. Itenderson, PAO JAC1, CJG RA Secretaries LAT,DLF DRP Division CLG, LMB,NLH DRS Division CMS, CAM 3, WSW DNMS Division LSO L. Ousley LPL P.Longdo cc:

MW$LY OEDO RIV Coordinator (16E15)

ORA File RIV File DOCUMENT NAME: R:\\_WAT\\WT1216MN.REV To receive copy of document, Indicate in bor: "C" = Copy without enclosures *E' = Copy with enclosures 'N" = No copy RIV:PE:DRP/D.

C:DRP/D PAO l &>W RSLO CCD:DRS Q GAPick;dfW L.PHHarrellM BWHenderson CAHackney ATHowcEZ77_

O 12/T /98 /

d 12/ 7 /98 7' 12/4 /98 12/T /98 12/ 7 /98M D:DRP TPGwynn \\N 12/g /98 V OFFICIAL RECORD COPY 150012