ML20141D251

From kanterella
Jump to navigation Jump to search
Notification of Licensee Meeting W/Listed Attendees on 970806 in Region IV Training Room Re W3 Performance Improvement Meeting
ML20141D251
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/25/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9706270056
Download: ML20141D251 (5)


Text

.. . - -~~ . . . . . ._. . . _ _ _ .- --. . ..-.. - . - . _ . . .

ps Rf 4 UNITED STATES 9

e Ny $t NUCLEAR REGULATORY COMMISSION

, g,'

&- ( Q REGloN tv S @

611 RYAN PLAZA DRIVE, SulTE 400

%9 [ ARLINGT TXS 1 8064 NOTICE OF LICENSEE MEETING Name of Licensee: Entergy Operations, Inc. (EOl)

Name of Facility: Waterford Steam Electric Station, Unit 3 (W3) l Docket: 50-382 Date and Time August 6,1997 of Meeting: 1-3 p.m. (CDT)

Location of Meeting: Region IV Training Conference Room Purpose of Meeting: W3 Performance Improvement Meeting NRC Attendees: E. Merschoff, Regional Administrator K. Perkins, Director, Walnut Creek Field Office A. Howell, Director, Division of Reactor Safety P. Harrell, Chief, Project Branch D, Division of Reactor Projects (DRP)

C. Patel, Project Manager, Project Directorate IV-1, Office of Nuclear Reactor Regulation L. Keller, Senior Resident inspector.

G. Pick, Senior Project Engineer Licensee Attendees: C. Dugger, Vice President Operations T. Leonard, General Manager Plant Operations A. Wrapo, Director, Design Engineering E. Ewing, Director, Nuclear Safety and Regulatory Affairs D. Vinci, Manager, Systems Engineering NOTE:

(1) This meeting is open to attendance by members of the general public.

-(2) NRC personnel, not listed above, that desire to attend this meeting should notify Phil Harrell at 817/860-8250 by COB on August 1,1997.

Approved By: _h Thomas P. Gwynn, Director 1 Division of Reactor Projects 1

Docket No.: 50-382 O License No.: NPF-38

!!.lf!!.flllfflf

. . lf 9706270056 970625 PDR ADOCK 05000302 PDR

Entergy Operations, Inc. cc:

Charles M. Dugger, Vice President Operations - Waterford 3 Entergy Operations, Inc.

P.O. Box B Killona, Louisiana 70066 Executive Vice President and j Chief Operating Officer l Entergy Operations, Inc.

l P.O. Box 31995

' Jackson, Mississippi 39286-1995 Vice President, Operations Support ,

. Entergy Operations, Inc. '

P.O. Box 31995 Jackson, Mississippi 39286-1995 Wise, Carter, Child & Caraway ,

P.O. Box 651 Jackson, Mississippi. 39205 1

ll General Manager, Plant Operations

!' Waterford 3 SES Entergy Operations, Inc.

P.O. Box B Killona, Louisiana 70066 l l l Manager - Licensing Manager:

Waterford 3 SES 1

l Entergy Operations, Inc.  !

P.O. Box B l

Killona, Louisiana - 70066 '

l 1

Chairman Louisiana Public Service Commission One American Place, Suite.1630 l Baton Rouge, Louisiana 70825-1697 Director, Nuclear Safety &

. Regulatory Affairs  ;

Waterford 3 SES

! Entergy Operations, Inc. l P.O. Box B

! Killona, Louisiana 70066 l

. . . . . . ~ . . . ~ . - - . - . . . . - .. . - .... _ . -.- - _. .-.-.- -.-. ._-. -.

1 ..

l

  • i Entergy Operations, Inc. i l l

l l

I William H. Spell, Administrator l Louisiana Radiation Protection Division

!: P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 l- ' Parish President St. Charles Parish L

P.O. Box 302 L Hahnville, Louisiana 70057

!- Mr. William A. Cross '

Bethesda Licensing Office 3 Metro Center Suite 610' l Bethcada, Maryland 20814 -

Winston & Strawn 1400 L Street, N.W.

l Washington, D.C. 20005-3502 >

l i

l 6 I

i f

4 l

l l

1

- . _. . -. _ . . --._ _ - ~ . - _. _. .- - - - .- . - . - - -

Entergy Operations, Inc. JUN 2 51997 E-Mail To: FOR

( ) NRC Attendees PMNS Mtg Announcement Coordinator JKR E. L. Jordan, DEDO PAB H. L. Thompson, DEDR l FJM F. J. Miraglia, A/D/NRR ACT A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR '

OEMAll J. Lieberman, D/OE I LJC L. J. Chandler, OGC CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO MFH2 M. Hammond, PAO KEP Ken Perkins, Director, WCFO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Secretaries j CLG, LMB, DXY DRS Secretaries I NLH, WSW DNMS Secretaries LSO Linda Ousley l cc:

DMB (IE 45' OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV File DOCUMENT NAME: R:\ WAT\WT8-6MN.DRP To receive copy of document, Indicate in box: "C" = Copy witho,ut ures "E" = Copy with enclosures "N" = No copy RIV:PE:DRP/D _ C:DRP/D f f, ) D:DRP ^Q l l GAPick:df M PHHarrel R TPGwynn h 6/Ao /97 6/b(/97 6/Z5 /97 \

OFFICIAL RECORD COPY l

i

_ _ - . .~. .- -. ~.- - - _ _ - = _ - - _ - . - .- .- .

s' t

l Entergy Operations, Inc. JUN 2 51997 I

E-Mail To: FOR

( ) NRC Attendees PMNS Mtg Announcement Coordinator JKR E. L. Jordan, DEDO PAB H. L. Thompson, DEDR FJM F. J. Miraglia, A/D/NRR ACT A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR

. OEMAIL J. Lieberman, D/OE LJC L. J. Chandler, OGC CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO MFH2 M. Hammond, PAO KEP Ken Perkins, Director, WCFO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Secretaries CLG, LMB,DXY DRS Secretaries NLH, WSW DNMS Secretaries LSO Linda Ousley cc:

DMB (IE 45)

OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV File DOCUMENT NAME: R:\_WAT\WT8-6MN.DRP To receive copy of document, Indicato in box: "C" = Copy wdhout %ures "E" = Copy with enclosures "N" = No copy l RIV:PE:DRP/D _ C:DRP/D f t1 D:DRP ^Qi l l l GAPick:df M PHHarrel R TPGwynn 4.cn l'

6/AD /97 6/2d /97 6/Z.5 /97 \ '

0FFICIAL RECORD COPY i

I