MONTHYEARML20045D8561993-06-21021 June 1993 San Luis Obispo Mother for Peace Supplemental Response to First & Second Sets of Interrogatories & Requests for Production of Documents Filed by Pacific Gas & Electric Co.* W/Certificate of Svc.Related Correspondence ML20045D8291993-06-18018 June 1993 Response to Third Set of Suppl Interrogatories & Requests for Production of Documents (Aging) Filed by San Luis Obispo Mothers for Peace.* W/Certificate of Svc.Related Correspondence ML20045A6751993-06-0404 June 1993 Intervenor San Luis Obispo Mothers for Peace Third Set of Supplementary Interrogatories & Requests for Production of Documents to PG&E Re Aging.* W/Certificate of Svc.Related Correspondence ML20045A6401993-05-26026 May 1993 PG&E Response to Supplemental Interrogatories Re First Set of Interrogatories & Requests for Production of Documents (Cable Failures) Filed by San Luis Obispo Mothers for Peace. * W/Certificate of Svc.Related Correspondence ML20044F7701993-05-21021 May 1993 Intervenor San Luis Obispo Mothers for Peace Second Set of Supplemental Interrogatories & Requests for Production of Documents to Pge Cable Failures at Diablo Canyon Nuclear Power Plant.* W/Certificate of Svc.Related Correspondence ML20056C1891993-03-10010 March 1993 Pacific Gas & Electric Co Response to First Set of Interrogatories & Request for Production of Documents Filed by San Luis Obispo Mothers for Peace.* W/Certificate of Svc. Related Correspondence ML20128P2251993-02-16016 February 1993 Intervenor San Luis Obispo Mothers for Peace First Set of Written Interrogatories & Requests for Production of Documents to Pg&E.* PG&E Should Answer Interrogatories within 14 Days.W/Certificate of Svc.Related Correspondence ML20213E6201986-11-0606 November 1986 Response to NRC Second Set of Interrogatories.Contentions Re Proposed Reracking & Alternatives Based on Understanding of Existing Industry Practice & Currently Available Technology. W/Proof of Svc.Related Correspondence ML20213E6091986-11-0606 November 1986 Response to NRC Second Set of Inerrogatories Re Proposed Reracking of Spent Fuel Pools.Not Possible to Either Identify or Supply All Ref Documentation Supporting Contentions.W/Proof of Svc.Related Correspondence ML20213E5791986-11-0606 November 1986 Response to Util Second Set of Interrogatories Re Reracking of Spent Fuel Pools.Equations of Motion Appear in Encl Computer Program.W/Proof of Svc ML20213F5851986-11-0505 November 1986 Suppl to 861003 Response to Intervenors 860916 First Set of Interrogatories Re Metals Used in Fuel Pools.Certificate of Svc Encl.Related Correspondence ML20213F5011986-11-0505 November 1986 Response to 861017 Second Set of Interrogatories Re Seismic Analysis of High Density Fuel Racks for PG&E for Diablo Canyon Nuclear Power Station & Request for Production of Documents.W/Certificate of Svc.Related Correspondence ML20215H6691986-10-20020 October 1986 Second Set of Interrogatories & Request for Production of Documents on Contentions I & Ii.Certificate of Svc Encl. Related Correspondence ML20211E2121986-10-20020 October 1986 Second Set of Interrogatories Re Contentions 1 & 2 Concerning Proposed Reracking of Spent Fuel Pools. Certificate of Svc Encl.Related Correspondence ML20211E1871986-10-20020 October 1986 Second Set of Interrogatories Re Contention 1 Concerning Proposed Reracking of Spent Fuel Pools.Related Correspondence ML20211E1721986-10-20020 October 1986 Second Set of Interrogatories Re Contention 14 Concerning Neutron Embrittlement & Other Metallurgical Deterioration & Environ Stresses on Spent Fuel Pool.Related Correspondence ML20210S9651986-10-0606 October 1986 Answers to Sierra Club 860915 First Set of Interrogatories Re Reracking of Spent Fuel Pools.W/Certificate of Svc. Related Correspondence ML20210S8921986-10-0606 October 1986 Response to Util Interrogatories Re Preparation for Upcoming Safety Hearings on Reracking of Spent Fuel Pools.Safety Issues Should Be Considered Before Amend Accepted.W/ Certificate of Svc.Related Correspondence ML20210T2611986-10-0606 October 1986 Response to NRC Interrogatories on Contention 1 Re Util Responsibility to Demonstrate Safety of High Density Reracking.Intervenors Not Responsible for Solving Waste Storage Problem.W/Certificate of Svc.Related Correspondence ML20206U7481986-10-0303 October 1986 Response to 860916 Interrogatories & Request for Production of Documents Re Licensing Proceedings.Certificate of Svc Encl.Related Correspondence ML20210S9241986-10-0303 October 1986 Response to San Luis Obispo Mothers for Peace First Set of Interrogatories Re Reracking of Spent Fuel Pools.Certificate of Svc Encl.Related Correspondence ML20210T0541986-10-0303 October 1986 Response to Util First Set of Interrogatories & Request for Production of Documents.Certificate of Svc Encl.Related Correspondence ML20210T0731986-10-0303 October 1986 Response to Interrogatories & Request for Production of Documents Re Alternatives to High Density Reracking of Spent Fuel Pool at Facilities.Certificate of Svc Encl.Related Correspondence ML20210T0221986-10-0303 October 1986 Response to NRC Interrogatories & Request for Documents Re Contention 14.Related Correspondence ML20210S9931986-10-0303 October 1986 Response to Consumers Organized for Defense of Environ Safety First Set of Interrogatories Re Reracking of Spent Fuel Pools.Certificate of Svc Encl.Related Correspondence ML20210S9711986-10-0303 October 1986 Response to Util & NRC First Set of Interrogatories & Request for Production of Documents.Interrogatories Opposed for Reasons Indicated.Certificate of Svc Encl.Related Correspondence ML20214Q3781986-09-16016 September 1986 First Set of Interrogatories & Request for Production of Documents Re Contentions I & II Concerning Reracking of Spent Fuel Pools.Notice of Change of B Norton Address & Certificate of Svc Encl.Related Correspondence ML20214Q3621986-09-16016 September 1986 First Set of Interrogatories & Request for Production of Documents Re Contention 14 Concerning Reracking of Spent Fuel Pools.Related Correspondence ML20214Q3521986-09-16016 September 1986 First Set of Interrogatories & Request for Production of Documents Re Contentions 1-3 Concerning Reracking of Spent Fuel Pools.Related Correspondence ML20214Q2981986-09-16016 September 1986 First Round of Interrogatories & Requests for Production of Documents.Certificate of Svc Encl.Related Correspondence ML20214P8291986-09-16016 September 1986 Requests Response to Listed Interrogatories Re Design & Const of Fuel Ponds.Certificate of Svc Encl.Related Correspondence ML20210B6321986-09-16016 September 1986 Interrogatories & Request for Documents Re Contention 14 Concerning Neutron Embrittlement & Other Metallurgical Deterioration & Environ Stresses to Structural Integrity of Spent Fuel Ponds ML20210B6701986-09-16016 September 1986 Interrogatories & Request for Documents Re Contention That Applicant Has Not Adequately Considered Alternatives to Proposed Reracking of Spent Fuel Pools ML20210B7341986-09-16016 September 1986 Interrogatories & Request for Documents Re Contention That Util Submittals to NRC Fail to Contain Date Necessary for for Independent Verification of Claims on Consistency of Public Health & Safety & Environ.W/Certificate of Svc ML20210E1781986-09-15015 September 1986 Interrogatories & Request for Production of Documents Re Theoretical Work Concerning Displacement of High Density Spent Fuel Racks Due to Hypothetical Seismic Excitation. W/Certificate of Svc.Related Correspondence ML20214R2341986-09-15015 September 1986 Interrogatories Requesting Documents Re Evaluation of Alternatives to High Density Reracking of Spent Fuel Pools & Dry Cask Onsite Storage as Alternative to High Density Reracking.Certificate of Svc Encl.Related Correspondence ML20214R1401986-09-15015 September 1986 Interrogatories Requesting All Documents Re Evaluation of Alternatives to High Density Reracking of Spent Fuel Pools, Dry Cask Onsite Storage & Cost/Benefit Assessment on Reracking.Certificate of Svc Encl.Related Correspondence ML20081D7851983-10-26026 October 1983 Request for Production of Documents by NRC at 831107 Hearing in Avila Beach,Ca.Certificate of Svc Encl ML20080S2831983-10-14014 October 1983 Second Supplemental Response to Third Set of Interrogatories.Certificate of Svc Encl.Related Correspondence ML20085J5951983-10-0707 October 1983 Fifth Supplemental Response to First Set of Interrogatories. Portions of RB Hubbard & Fj Samaniego 821221 Direct Testimony & Certificate of Svc Encl ML20080Q3951983-10-0707 October 1983 First Supplemental Answers to Fourth Set of Interrogatories. Certification of Counsel & Certificate of Svc Encl ML20080Q3851983-10-0707 October 1983 First Supplemental Answers to Second Set of Interrogatories. Certification of Counsel Encl ML20080Q3741983-10-0707 October 1983 Second Supplemental Answers to First Set of Interrogatories. Certification of Counsel & Prof Qualifications Encl ML20080Q4441983-10-0505 October 1983 Response of Idvp to Interrogatory 57 in Third Set of Interrogatories.Certificate of Svc Encl.Related Correspondence ML20078E1861983-10-0303 October 1983 Fourth Supplemental Response to First Set of Interrogatories.Certificate of Svc Encl ML20078D5091983-09-29029 September 1983 Supplemental Response to Second Set of Interrogatories. Certification of Counsel & Certificate of Svc Encl.Related Correspondence ML20078E1331983-09-28028 September 1983 First Supplemental Response to Third Set of Interrogatories. Certificate of Svc Encl.Related Correspondence ML20080M8521983-09-28028 September 1983 First Supplemental Answers to Third Set of Interrogatories. Prof Qualifications & Certificate of Svc Encl.Related Correspondence ML20080L5721983-09-26026 September 1983 Response to Fourth Set of Interrogatories.Certification of Counsel & Certificate of Svc Encl ML20078B8021983-09-23023 September 1983 Idvp Answers to First Set of Interrogatories.Certificate of Svc Encl 1993-06-04
[Table view] Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARDCL-99-123, Comment on Prs 10CFR50 & 72 Re Reporting Requirements for Nuclear Power Reactors & Draft NUREG-1022, Event Reporting Guidelines. Util Areas of Concern Includes ESF Actuations, Significantly Degraded Components & Historical Limitations1999-09-20020 September 1999 Comment on Prs 10CFR50 & 72 Re Reporting Requirements for Nuclear Power Reactors & Draft NUREG-1022, Event Reporting Guidelines. Util Areas of Concern Includes ESF Actuations, Significantly Degraded Components & Historical Limitations ML20205N4081999-04-14014 April 1999 Comments Opposing Proposed Rules 10CFR2,19 & 20 Re Proposed Repository at Yucca Mountain.Requests Information on How Much Radiation Being Released Now at Diablo & Hanford NPPs ML20205N4601999-03-21021 March 1999 Introduces K Schumann as Representative of Nuclear Waste Committee (Nuwic) of San Lius Obispo County.Informs That Nuwic & Nuclear Waste Management Committee Concerned with Transportation of Spent Nuclear Fuel Rods from Dcnpp ML20195E8841998-11-24024 November 1998 Petition for Mod to OLs to Require Plant Owner to Have Independent Contractor Evaluate Plant Safety Culture ML20236T3011998-07-24024 July 1998 Order Prohibiting Involvement in NRC Licensed Avtivities (Effective Immediately).Lh Brooks Prohibited for 5 Yrs from Date of Order from Engaging in NRC Licensed Activities ML20248C2261998-05-22022 May 1998 Comment Opposing Revised Proposed Rule 10CFR50 Re Protection & Safety Sys ML20129J4191996-10-18018 October 1996 Order Approving Application Re Corporate Restructuring of Pacific Gas & Electric Company by Establishment of Holding Company DCL-95-206, Comment Supporting Petition for Rulemaking PRM-50-61 Re Improving Fire Protection Regulations1995-10-0606 October 1995 Comment Supporting Petition for Rulemaking PRM-50-61 Re Improving Fire Protection Regulations ML20091P8721995-08-23023 August 1995 Comment Opposing Petition for Rulemaking PRM-50-61 Re Nuclear Energy Institute Proposed Amends on Fire Safety for All NPPs DCL-95-001, Comment on Proposed Changes to Reactor Pressure Vessel Integrity Rule 10CFR50.Endorses NEI Comments1995-01-0303 January 1995 Comment on Proposed Changes to Reactor Pressure Vessel Integrity Rule 10CFR50.Endorses NEI Comments ML20077M7521994-12-30030 December 1994 Comment Opposing Proposed Rule 10CFR50 Re Shutdown & Low Power Operation for Nuclear Power Reactors DCL-94-270, Comment on Proposed Rules 10CFR2,51 & 54 Re Rulemaking for NPP License Renewal.Endorses Comments & Changes Proposed by NEI 941208 Submittal1994-12-0808 December 1994 Comment on Proposed Rules 10CFR2,51 & 54 Re Rulemaking for NPP License Renewal.Endorses Comments & Changes Proposed by NEI 941208 Submittal ML20149H0851994-11-0404 November 1994 Initial Decision (Construction Period Recovery/Recapture).* Renewed Motion to Reopen Record 940808,denied.Served on 941104.W/Certificate of Svc ML20072L2651994-08-23023 August 1994 PG&E Opposition to San Luis Obispo Mothers for Peace Renewed Motion to Reopen Record.* Util Opposes San Luis Obispo for Peace Motion Based on Affidavit Stating No Evidence Found in Motion Re Flaw in Program.W/Certificate of Svc ML20072F0291994-08-12012 August 1994 Erratum to San Luis Obispo Mothers for Peace Motion to Reopen Record.* Intervenors Corrects Error in Renewed Motion to Reopen Record Re Application for License Amend to Extend Term of Operating License for Plant.W/Certificate of Svc ML20072B2651994-08-0909 August 1994 Comment Supporting Proposed Rule 10CFR26 Re FFD Requirements Concerning Random Drug Testing ML20072A5821994-08-0808 August 1994 San Luis Obispo Mothers for Peace Renewed Motion to Reopen Record Re PG&E Application for Amend to Extend Term of OL for Plant.* Motion to Reopen Record to Introduce Insp Rept Identifying Alleged Problems W/Plant.W/Certificate of Svc ML20072B8481994-07-26026 July 1994 Comment Opposing Proposed Rule 10CFR26 Re Changes to FFD Requirements Concerning Random Drug Testing ML20071L2061994-07-26026 July 1994 Comment Supporting Proposed Rule 10CFR26 Re Changing Current Drug Testing Policies to Exclude All Personnel in nonsafety-related Positions ML20071L1901994-07-20020 July 1994 Comments on Proposed Rule 10CFR26 Re Relaxing Rule on Drug Testing of Employees Working at NPP DCL-94-134, Comment Supporting Petition for Rulemaking PRM-50-60 Re Amend to 10CFR50.54 by Changing Frequency W/Which Each Licensee Conducts Independent Reviews of Emergency Preparedness Program1994-06-27027 June 1994 Comment Supporting Petition for Rulemaking PRM-50-60 Re Amend to 10CFR50.54 by Changing Frequency W/Which Each Licensee Conducts Independent Reviews of Emergency Preparedness Program DCL-94-135, Comment Supporting Petition for Rulemaking PRM-50-59 Re Proposed Amend to 10CFR50.54(p) Concerning Frequency W/Which Licensee Conducts Independent Reviews of Security Programs1994-06-27027 June 1994 Comment Supporting Petition for Rulemaking PRM-50-59 Re Proposed Amend to 10CFR50.54(p) Concerning Frequency W/Which Licensee Conducts Independent Reviews of Security Programs ML20064D1791994-03-0707 March 1994 Pacific Gas and Electric Co Reply in Opposition to San Luis Obispo Mothers for Peace Motion to Reopen Record.* Motion to Reopen Record Denied.W/Certificate of Svc ML20064D1961994-03-0404 March 1994 Affidavit of Mj Angus Re Motion to Reopen Record ML20063L5721994-02-25025 February 1994 San Luis Obispo Mothers for Peace Re Util Application for License Amend to Extend Term of Operating License for Plant.* Advises That Record of Proceeding Should Be Reopened to Consider Insp 93-36 Re Util Surveillance of Asw Sys DCL-94-021, Comment Supporting Petition for Rulemaking PRM-21-2 Re Commercial Grade Item Dedication Facilitation1994-01-26026 January 1994 Comment Supporting Petition for Rulemaking PRM-21-2 Re Commercial Grade Item Dedication Facilitation ML20059D2431994-01-0707 January 1994 Package of Intervenor Exhibits Consisting of Related Correspondence Not Admitted Into Evidence.Related Correspondence ML20062N0001993-12-30030 December 1993 PG&E Reply Findings of Fact & Conclusions of Law.* Mothers for Peace Proposed Findings & Conclusions Do Not Provide Any Supportable Rationale to Change Findings & Conclusions Previously Proposed by Pg&E.W/Certificate of Svc ML20058P3931993-12-22022 December 1993 NRC Staff Findings of Fact & Conclusions of Law in Form of Initial Decision.* Certificate of Svc ML20058K7491993-12-0202 December 1993 NRC Staff Motion for Extension of Time.* Board Has Extended Filing Time for Util Until 931230.W/Certificate of Svc. Served on 931206.Granted for Board on 931203 ML20058K8771993-12-0202 December 1993 NRC Staff Motion for Extension of Time.* Requests That Board Extend Date for Staff to File Findings Until 931222. W/Certificate of Svc ML20058E0741993-11-19019 November 1993 San Luis Obispo Mothers for Peace Proposed Findings of Fact & Conclusions of Law Re Licensee Application for License Amend to Extend Term of Operating License for Plant.* W/ Certificate of Svc ML20059M5291993-11-19019 November 1993 Applicant Exhibits A-21,A-22,A-24,A-25,A-26,A-29 & A-F1, Consisting of Related Correspondence Not Admitted Into Evidence.Related Correspondence ML20059E8931993-10-28028 October 1993 Memorandum & Order (Motion for Extension of Time).* San Luis Obispo Mothers for Peace 931018 Request for two-wk Extension of Time to File Proposed Findings of Fact & Conclusions of Law Granted.W/Certificate of Svc.Served on 931029 ML20059E8531993-10-27027 October 1993 NRC Staff Response to Board Memorandum & Order Re Extension of Time.* Staff Believes That San Luis Obispo Mothers for Peace Has Shown No Good Cause for Requesting Extension to File Proposed Findings of Fact.W/Certificate of Svc ML20059E8631993-10-25025 October 1993 Pacific Gas & Electric Co Response to Motion for Extension of Time.* Util Does Not Agree W/Board Assessment That Mothers for Peace Request Appears to Be Reasonable But Will Not Oppose Request.W/Certificate of Svc ML20059B2191993-10-19019 October 1993 Memorandum & Order (Responses to Motion for Extension of Time).* Board Believes Intervenor Request for Extension of Time to File Proposed Findings of Fact Appears Reasonable. W/Certificate of Svc.Served on 931019 ML20059B1071993-10-18018 October 1993 San Luis Obispo Mothers for Peace Motion for Extension of Time for Filing Proposing Findings of Fact & Conclusions of Law.* Requests Extension of Two Wks or Until 931119 to File Proposed Findings of Fact.W/Certificate of Svc ML20057D0531993-09-23023 September 1993 Notice of Appearance.* Notice Given That Undersigned Attorney Enters Appearance in Listed Matter & Listed Info Provided.W/Certificate of Svc ML20057B0401993-09-14014 September 1993 NRC Staff Reply to PG&E Response to Staff Motion to Amend Protective Order.* NRC Staff Moves Board to Adopt Language Requested in 930817 Motion as Stated.W/Certificate of Svc ML20056G4891993-08-30030 August 1993 Pacific Gas & Electric Co Response to Motion to Amend Protective Order.* Staff Asks That Protective Order Be Clarified by Adding New Footnote to Paragraph 3 of Order. W/Certificate of Svc ML20059D0841993-08-24024 August 1993 Intervenor Exhibit I-MFP-139,consisting of Insp Rept Re Dockets 50-275 & 50-323,dtd 920417 IR 05000275/19920171993-08-24024 August 1993 Intervenor Exhibit I-MFP-102,consisting of Insp Rept Re Dockets 50-275/92-17 & 50-323/92-17,dtd 920508 ML20059M5041993-08-24024 August 1993 Staff Exhibit S-2,consisting of Re Notice of Violation IR 05000275/19920261993-08-24024 August 1993 Intervenor Exhibit I-MFP-118,consisting of Notice of Violation & Insp Rept Re Docket 50-275/92-26 & 50-323/93-26,dtd 921113 IR 05000275/19920161993-08-24024 August 1993 Intervenor Exhibit I-MFP-137,consisting of Insp Rept Re Dockets 50-275/92-16 & 50-323/92-16,dtd 920707 ML20059D2241993-08-24024 August 1993 Intervenor Exhibit I-MFP-220,consisting of Protest of Util ML20059M1381993-08-24024 August 1993 Staff Exhibit S-1,consisting of Re 920519 Enforcement Conference IR 05000275/19910061993-08-24024 August 1993 Intervenor Exhibit I-MFP-71,consisting of Rept of EC W/Util Mgt,Re Rept Numbers 50-275/91-06 & 50-323/91-06,dtd 910411 ML20059M8621993-08-24024 August 1993 Intervenor Exhibit I-MFP-35,consisting of Rept, Self- Evaluation of Diablo Canyon Power Plant, Dtd Jul 1993 1999-09-20
[Table view] |
Text
._
l 1
l UNITED STATES OF AMERICA !
NUCLEAR REGULATORY COMMISSION
' BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
PACIFIC GAS AND ELECTRIC COMPANY ) Docket Nos. 50-2 7 5-OL
} 50-323-OL Units 1 and 2 )
)
i Diablo Canyon Site )
)
l RESPONSE OF PACIFIC GAS AND ELECTRIC CCMPANY TO REQUEST BY SCENIC SHORELINE PRESERVATION CONFERENCE, -)
INC. FOR GEOLOGICAL-SEISMOLOGICAL FATA l f
1 In a document dated June 8, 1975 Scenic Shoreline Preserva-tion Conference, Inc. requested copies l
". . . of whatever reports are being relied upon and used as background reference by the United States Geological Survey, Staff, and !
Applicant in the current research and analysis of the geology and seismology affecting the Diablo Canyon nuclear power plants." l The reports relied upon by PGandE are, with two exceptions, !
contained or referred to in S 2.5 of the Final Safety Analysis Report.
The references are listed beginning at page 2.5D-67 and primarily consist of documents which are generally available. PGandE can make I
available for inspection and copying at its offices or at the offices of its consultants the documents not generally available.
]
The two references not included in the FSAR are as follows: )
Gawthrop, William, 1975, Seismicity of the !
Central California Coastal Region: U. S. j Geological Survey, Open-File Report 75-134; j i
8707300168 B70721 i PDR FOIA >
CONNORB7-214 PDR l
Wolf, Stephen, 1975, Open-File data from U. S.
Geological Survey Polaris Oceanographic Survey cruise of 1972.
PGandE is informed. that copies of both of these documents are avail-able at the USGS office in Menlo Park. ;
i Respectfully submitted, JOHN C. MORRISSEY PHILIP A. CRANE, JR.
DEN . SULLIVAN B! ,
K. Crane,( Jr.
W #
' Phill Attorneys _for.
Pacific Gas and. Electric Company' 77 Beale Street San Francisco, California 94106
.\
1 Dated: June 25, 1975