ML20236B686

From kanterella
Jump to navigation Jump to search
Advises That Second Paragraph of Ltr Should More Correctly Reflect Status of Plant Licensing Proceeding
ML20236B686
Person / Time
Site: Diablo Canyon, 05000000
Issue date: 01/25/1974
From: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
To: Goller K
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20236A877 List: ... further results
References
FOIA-87-214 NUDOCS 8707290194
Download: ML20236B686 (3)


Text

(- -

t UNITED STATES j

ATOMIC ENERGY COMMISSIOr4 g

W ASHINGTON 20S43 t'

,6 January 25, 1974 1

NOTE T0:

K. Goller The second paragraph of this letter ought i

to be changed to more correctly reflect the status of the Diablo Canyon licensing pro-ceeding.

You ought to point out that an application for a construction permit was reviewed way back when, there was a public i

hearing, there was a subsequent environ-1 mental hearing, and that the construction permit was issued on

, and

}

that since that time the plant is blank percent complete.

Then pick up with --

In July of 1973, PG&E amended its application to request a license to operate the plant.

Then you can talk about the FSAR, Section 2.5, etc.

1 Roger S. Boyd, ADDRP 1/I I ha alcJ

~

0 7

< j r v.2 ':h k

-.t.

'4 /

8707290194 870721 PDR FOIA CONNDR87-214 PDR

"(!

I

s 411 65) '

U. S. ATorlC E'

'GV c0MMISSION H Q.17 R O U T 'l i, G SLlP 0,goniz at ion TOl N AM:!, TITL E, UNIT OR M AIL ST ATION BJ"iceus Ecr.currence KRW

//2.2 Concurrence

-/

'RCDsYoung Concurrence

^-

a Terry Barnhart x7243 - Copies Liz Green Check Package Giambeeso Concurrence & Signature tf GErtter (DR-6568)

Dispatch N

O As Request d Allotm.nt Symbol O R od & Destroy O cor,.c,lon Ap proval /$ignotur.

O R.comm.ndo, ion O Fiiin, O comm.n,/coneo,,.n..

O Nondi. oi,.c.iy Full Repo,,

O N.c...ory oc, ion Olmm.diote Action O in,o,mo, ion O No. ona R.

,n O s.. M.

O e., con....in Answe, or Acknowledge Befo,e 0 e,.po,. R.piy re, es. s igno,v,. or REM ARKS:

Letter to Mr. Verlyn G. March

SUBJECT:

DR Control #6568 l

Opposes continued construction of the Diablo Canyon plant because of the close proximity of earthquake faults - also states San Onofre is no place for an A-plant.

l 1

l FROM l

Name Div./Off /Br.

Date Telephone Terry Barnhart L: LWR 1-3 1/21 7243 l

4 l

'I l

HQ 200a, (19 73)

Jan. 15, 1974 7 NO, 74-6005 tocatuu,, ATE

^'

.. AEC' SECRETARIAT A'

)

1/lb i Tg: O CoMMIS$10NER DATE:

O gin. MANAGER O GEN. COUNSEL O INFO. SERVICES 4

3 DIR. REGULATION O PLAN. & ANAL.

O SECRETARY I

U L

J Verlyn G.

Marth l

INCOM4NG FROM:

Costa Mesa. Ca.

DATE:

11 Jan 1974 Re construction of the Diablo Canyon

SUBJECT:

Atomic plant O PREPARE REPLY FOR SIGNATURE OF:

O CHAIRMAN j

O COMMISSIONER R I

O GM, DR, GC, PA, IS, SECY I

O SIGNATURE BLOCK OMITTED 0 PLEASE RETURN ORIGINAL WITH RESPONSE O FOR DIRECT REPLY O SEND COPY OF REPLY TO:

O SECY Mall FACILITY (3)

O CHAIRMAN O COMMISSION E RS O SECRETARY

@ FOR APPROPRIATE ACTION O FOR INFORMATION O FOR RECOMMENDATION REMARKS:

/7 FOR THE COMMISSION:

iYb4C WHEN SEPARATED FROM ENCLOSURES HANDLE THIS DOCUMENT AS G8 0 870 068 ACTION SLIP