ML20234C929
Text
- _ - - - _ -
[..
@'" '8::'
UNITED STATES l
b
[C
- D),' I L
ATOMIC ENERGY COMMISSION f'I C WASHINGTON, D.C. 20545
\\.
.La February 8, 1973
, Docket No'. 50-254 7
,,, 9 - l 9 a:.
0:1 s
Mr. Harold G. Mangelsdorf Chairman, Advisory Comittee on Reactor Safeguards U. S. Atomic Energy Commission Washington, D. C.
20545
Dear Mr. Mangelsdorf:
Sixteen (16) copies of the following are transmitted for the Committee's information:
TWX from Commonwealth Edison Company dated January 19, 1973, reporting that an ECCS reactor low pressure permissive preseure switch was found to actuate below the level specified in the Quad-Cities Unit 1 Technical Specifi-cations.
Letter from Commonwealth Edison Company dated January 25, 1
1973, furnishing information concerning the set point drift of a reactor low pressure switch at Quad-Cities Unit 1.
WX from Commonwealth Edison Company dated February 3,1973, reporting that a limit switch on a main steam isolation valve was found to be inoperable at Quad-Cities Unit 1.
Sincerely, 7
g4f k' Donald J.'
vholt Assistant Director for Operating Reactors Directorate of Licensing
Enclosures:
As stated
$ e _..,,,
p ~ /~5 P. ~ ~ ~ ~ O r-1 O. qf., p g ig,,~,q 1 i
}' d
( "'
' i
- ,p r.
ekD !
b4 h ; i,(,,'j
(/y y h.h i
8707070017 870610 NHA gd]
-40 PDR
_ - _ - - _ _ - _ _ _ _ _