Rev 0 to TVA Employee Concerns Task Group,Other Sites: Safeguards Violation/Inspector Followup Item
ML20214V506
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/01/1986
From: Birchell R, Debbage A, Knightly J
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20214T770 List:
References
SWEC-SQN-25, SWEC-SQN-25-R, SWEC-SQN-25-R00, NUDOCS 8612090711
Download: ML20214V506 (4)


Text

'.

6.

TENNESSEE VALLEY AUTHORITY WAFTS BAR NUCLEAR PLANT EMPLOYEE CONCERNS TASK GROUP OTilER SITES CEG Element

Title:

Safeguards Violation / Inspector Follow-up Item SWEC Concerns: A02050328004-001 2E 2-srec-.

Source Document: NRC Inspection Reports 50-327/85,1s, 50-328/85-Report Number:

SWE'C-SQN-25 Evaluator:

C*

k/3Pkb Robert C. Birchell tatd Reviewed By:

N/[

Q 9 f>>7bh l

J. J. Knightly I Date l

Approved By:

I emu

/0/01[fle A. G. Debbd e D&te /

l l

1079T 8612090711 861120 ADOCK0500g7 DR

,9,-

k-

Report SWEC-SQN-25 NRC Reports 50-327/85-25 and 50-328/85-25 I.

During a Nuclear Regulatory Commission (NRC) inspection (reference 1) conducted July 8-11, 1985, the NRC identified one Inspection Followup Item (IFI) in the area of plant security. This item was included in the Stone & Webster Engineering Corporation (SWEC) systematic analysis:

A02850328004-001, Safeguards Violation / Inspector Followup Item Information on the background, the corrective actions taken, the verification methodology and analysis, the completion status, and any pertinent references for this item is included in this report.

II.

Verification of SWEC Issues A.

Background

The NRC inspectors identified one inspector follow-up item (50-327/85-25-01 and 50-328/85-25-01). This item contains safeguards information and no additional background information will be provided in this report.

B.

Corrective Actions Taken -

The corrective actions (safeguards information) for Inspector Followup Item (IFI) 50-327, 328/85-25-01 were submitted to the NRC and found acceptable.

C.

Verification Methodology -

The SWEC concern identified for ECTG verification was stated as follows:

RIMS NO.

ISSUE RIMS NO.

A02850328004-001 Safeguards Violation /

RIMS - 001 Inspector Followup Item ECTG reviewed the Sequoyah Compliance Licensing files for internal and external correspondence related to this issue, and the NRC status and tracking system for the issue. This review of the pertinent documentation formed the basis for this verification activity.

D.

Verification Analysis -

The ECTG review indicated that the NRC IFI was adequately resolved.

The corrective actions were found acceptable to the NRC, and the IFI, 50-327, 328/85-25-01 was closed in Report 85-40 (Reference 2).

Page 1 of 2

a E.

Compl*,tien St-tus -

y l

Based on SQN corrective action, compliance with requirements, and NRC closure of the item, no further actions on this item are

'i required. This SWEC concern is closed.

't III.

References 4y (1) NRC Inspection Report Numbers 50-327/85-25 and 50-328/85-25, dated August 9, 1985, David M. Verrelli to H. G. Parris 1

'b

]

(2) NRC Inspection Report Numbers 50-327/85-40 and 50- 328/85-40, dated January 1, 1986, David M. Verrelli to H. G. Parris R

5 f

f 0

l 6

k I

g 4

t i

f k

f i

9 f

s t

1 1

h Page 2 of 2 i

t

+

l TVA EMPLOYEE CONCERNS REPORT NUMBER: SWEC-SQN-25 SPECIAL PROGRAM REPORT TYPE: Sequoyah Nuclear Plant Element REVISION NUMBER: 0 TITLE: Safeguards Violation / Inspection Followup Item REASON FOR REVISION: N/A SWEC

SUMMARY

STATEMENT: The item in this report was identified by the Nuclear Regulatory Commission (NRC) and was included in the Stone & Webster Engineering Corporation (SWEC) systematic analysis. The item evaluated within this report was verified to be adequately addressed and was closed by the NRC.

PRRPARATION PREPARED BY:

W$b1MO f2ASAY N-J/-IlL

'V SIGNATURE DATE REVIEWS PEER:

95 Cda $

ubdth SIdfATURE DATE I

gg np H 3 46 SIGNATURE DATE CONCURRENCES CEG-M:

u&

trlr1lt(.

3RP:

E d //

T1}/

/ -/$ -S(0 SIGNATURE DATE

~ SIGNATliRE

~

DATE APPROVED BY:

ll~l$ 5 N/A ECSP MANAGfR DATE ~

MANAGER OF NUCLEAR POWER DATE CONCURRENCE (FINAL REPORT ONLY)

T

  • SRP Secretary s signature denotes SRP concurrences are in files.

2242T