MONTHYEARML18066A6641999-09-30030 September 1999 Proposed Tech Specs Re Surveillance Implementation ML18066A6501999-09-17017 September 1999 Final Clean Copies of ITS & Bases Pages Incorporating Proposed Changes,Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to ITS LCOs 3.5.2,3.6.3,3.6.6, 3.7.5 & 3.7.7 & 3.7.8 ML18066A5911999-07-30030 July 1999 Proposed Tech Specs Sections 3.3,3.5 & 3.6,converting to Its,Per NUREG-1432 ML18066A5691999-07-19019 July 1999 Proposed Tech Specs Section 3.7, Plant Systems, Converting to ITS ML18066A5011999-06-11011 June 1999 Proposed Tech Specs Pages Re 980126 Submittal & Replacement Pages for Sections 3.3,3.4 & 3.9 ML20195D0451999-06-0303 June 1999 Proposed Tech Specs,Revised to Agree with Current Facility Defueled TS Format ML20206N2751999-05-11011 May 1999 Proposed Tech Specs Deleting Figure 5.1-1 Brp Site Map from Defueld TS Subsection 1.16,changing Definition of Site & Other Associated Editorial Changes ML18068A5851999-05-0303 May 1999 Proposed Tech Specs Section 3.5,converting to ITS ML18066A4551999-04-0707 April 1999 Proposed ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1 ML18066A4431999-03-30030 March 1999 Proposed Tech Specs Section 3.7,converting to ITS ML18066A4251999-03-22022 March 1999 Revised TS Pages for ITS Section 3.4 ML20207B2501999-03-0101 March 1999 Proposed Tech Specs Sections 2.0,3.1 & 3.2,converting to ITS ML20195E4451998-11-0909 November 1998 Proposed Tech Specs,Converting to Its,Consistent with NUREG-1432,Rev 1,in Response to 980824 RAI ML18066A3281998-11-0909 November 1998 Proposed Tech Specs,Deleting CVCS Operability Requirements Currenty in LCOs 3.2 3.17.6 & Associated Testing Requirements Currently in SRs 4.2 & 4.17 ML20154M5431998-10-14014 October 1998 Proposed Defueled Tech Specs & Bases for Big Rock Plant ML20154N2901998-10-12012 October 1998 Proposed Tech Specs Sections 1.0,3.0,4.0 & 5.0,converting to Improved Tech Specs ML20151Z8111998-09-14014 September 1998 Proposed Tech Specs Converting to Improved Tss, Consistent with NUREG-1432,Rev 1 ML18066A3021998-09-14014 September 1998 Proposed Tech Specs Markups of Previously Submitted Pages & Revised ITS Submittal Pages ML20238E8141998-08-31031 August 1998 Revised Big Rock Point Defueled Emergency Plan ML20236T6681998-07-21021 July 1998 Proposed Defueled Tech Specs for Big Rock Nuclear Plant ML18066A2011998-06-17017 June 1998 Proposed Tech Specs,Reflecting Reduced Min Reactor Vessel Flow Rate Assumption in Accident Analyses ML18066A1841998-06-10010 June 1998 Simulator Four-Year Test Rept & Schedule for Performance Testing for Next Four-Year Period. ML20248L5511998-06-0505 June 1998 Draft Proposed Tech Specs Rev,Incorporating Changes Responsive to 980416 RAI ML18068A3451998-04-29029 April 1998 Rev 9 to EI-9, Offsite Radiological Monitoring. ML18068A3441998-04-28028 April 1998 Rev 3 to EI-6.6, Gamma E Determination. ML18065B2271998-04-21021 April 1998 Reactor Vessel Neutron Fluence Methodology. ML20217C3101998-03-24024 March 1998 Palisades,Review of Actual Fluence Determination ML18065B1801998-03-13013 March 1998 Proposed Tech Specs Allowing Installation of Plant Mod W/O Requiring Plant Shutdown ML18065B2021998-03-10010 March 1998 Rev 7 to Relocated TS Per GL 89-09. ML20217P3811998-02-28028 February 1998 Revised Defueled Emergency Plan ML18067A8161998-01-26026 January 1998 Proposed Tech Specs Converting to Improved Ts,Consistent W/ NUREG-1432,Rev 1.Includes Vols 1-20 ML18066A4901998-01-20020 January 1998 Proposed Tech Specs Re Partial Response to 990126 Request RAI for ITS Section 3.6, Containment. ML20197G3851997-12-17017 December 1997 Rev 17 to Palisades Nuclear Plant Suitability,Training & Qualification Plan ML18065B2321997-10-24024 October 1997 Rev 5 to Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML18067A7071997-10-0101 October 1997 Proposed Tech Specs,Stating That TS Flywheel Insp Period Be Lengthened to Ten Years & Deleting Note of Insp at End of Cycle 12 ML18067A6771997-09-0303 September 1997 Proposed Tech Specs,Deleting Snubber Operability Requiements in LCO 3.20 & Snubber Testing Requirements Currently in SR 4.16 ML18067A6731997-09-0303 September 1997 Proposed Tech Specs,Updating TS to Reflect Capabilities of Installed CR Ventilation Equipment & to Emulate Std TS, CE Plants - NUREG 1432 Requirements for That Sys ML18067A6001997-06-27027 June 1997 Proposed Tech Specs Revising Electrical Power Systems ML20138G2021997-04-30030 April 1997 Proposed Tech Specs,Illustrating Change to Current Facility License DPR-6 ML20138A9131997-04-22022 April 1997 Proposed Tech Specs,Withdrawing Petition to Implement Option B Performance Based Requirements to App J of 10CFR50 ML18067A4701997-03-28028 March 1997 Proposed Tech Specs Pp Supporting Completion of Administrative Control Changes Proposed in 951211 Safety Evaluation for Amend 174 ML20137H5901997-03-27027 March 1997 Proposed Tech Specs Change Request Re Change in Co Name ML18067A4531997-03-26026 March 1997 Proposed Tech Specs,Allowing Entry Into Air Lock to Perform Repairs on Inoperable Air Lock Door & Thereby Avoid Potential for Unnecessary Plant Shutdown ML18067A5151997-02-11011 February 1997 Rev 5 to Health Physics Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML20216A9611997-01-0101 January 1997 Rev 13 to Big Rock Point Radiological Effluent T/S Required Documents,Offsite Dose Calculations & Process Control Program ML18065B2011996-12-24024 December 1996 Rev 11 to Offsite Dose Calculation Manual. ML18065B0861996-11-27027 November 1996 Corrected Pages 14 & 15 to Rev 18 to EM-09-02, Inservice Testing Program Relief Request Valve Relief Request 20. ML20134P4071996-11-19019 November 1996 Suitability,Training & Qualification Plan, Rev 16 ML20134H6411996-11-0707 November 1996 Proposed Tech Specs Re New Air Compressor to Svc Air Segment of Svc & Instrument Air Sys ML20137G3871996-10-29029 October 1996 Rev 6 to Relocated TS Per NRC GL 89-09 1999-09-30
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20238E8141998-08-31031 August 1998 Revised Big Rock Point Defueled Emergency Plan ML18068A3451998-04-29029 April 1998 Rev 9 to EI-9, Offsite Radiological Monitoring. ML18068A3441998-04-28028 April 1998 Rev 3 to EI-6.6, Gamma E Determination. ML18065B2271998-04-21021 April 1998 Reactor Vessel Neutron Fluence Methodology. ML18065B2021998-03-10010 March 1998 Rev 7 to Relocated TS Per GL 89-09. ML20217P3811998-02-28028 February 1998 Revised Defueled Emergency Plan ML20197G3851997-12-17017 December 1997 Rev 17 to Palisades Nuclear Plant Suitability,Training & Qualification Plan ML18065B2321997-10-24024 October 1997 Rev 5 to Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML18067A5151997-02-11011 February 1997 Rev 5 to Health Physics Procedure HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML20216A9611997-01-0101 January 1997 Rev 13 to Big Rock Point Radiological Effluent T/S Required Documents,Offsite Dose Calculations & Process Control Program ML18065B2011996-12-24024 December 1996 Rev 11 to Offsite Dose Calculation Manual. ML18065B0861996-11-27027 November 1996 Corrected Pages 14 & 15 to Rev 18 to EM-09-02, Inservice Testing Program Relief Request Valve Relief Request 20. ML20134P4071996-11-19019 November 1996 Suitability,Training & Qualification Plan, Rev 16 ML20137G3871996-10-29029 October 1996 Rev 6 to Relocated TS Per NRC GL 89-09 ML18065A7661996-06-10010 June 1996 Expired Temporary Change O-96-044 to Rev 17 to SOP-17A, Clean Radwaste Sys. ML18065A7651996-06-10010 June 1996 Cancelled Tcn O-96-045 to Rev 17 to SOP-17B, Dirty Radwaste Sys. ML18065A8021996-02-21021 February 1996 Rev 2 to EM-09-13, ISI Pressure Testing Program. ML20137G3631996-02-16016 February 1996 Rev 10 to Offsite Dose Calculation Manual ML20137G3581996-02-15015 February 1996 Rev 6 to CPC Pnp Process Control Program ML20199J7411995-10-0303 October 1995 Rev 6 to Users Guide for Vectora CL-200 Polyethylene High Integrity Containers ML18064A8141995-06-29029 June 1995 Procedure EOF App B, INPO Emergency Response Assistance Agreement, Dtd 950426 ML20100H2621995-06-18018 June 1995 Rev 2 to Reactor Vessel Exam Program Plan Interval 2,Period 3 & Interval 3,Period 1 ML18064A8881995-03-16016 March 1995 Rev 0 to Palisades Nuclear Power Plant Third Interval ISI Program for Class 1,2 & 3 Components & Supports, Vols I & II ML18064A6301995-03-0303 March 1995 Rev 7 to App H, Emergency Planning EOF Training Matrix. ML18064A6341995-02-27027 February 1995 Project Plan,Alloy 600,Palisades Nuclear Plant, Rev 1,dtd 950227 ML20072K7741994-07-15015 July 1994 Rev 0 to Palisades Performance Enhancement Plan ML20072K7641994-07-0606 July 1994 Rev 1 to Palisades Plant Restart Plan from 1994 Forced Outage ML18059B0481994-06-0303 June 1994 Attachment 4 to Procedure EM-09-13,Rev 1, ISI Pressure Testing Program Procedure. ML20069D3081994-05-24024 May 1994 Suitability,Training & Qualification Plan ML20069G2391994-05-20020 May 1994 Rev 30 to Procedure MO-7A-1, Emergency Diesel Generator 1-1 (K-6A) ML20069G2511994-05-20020 May 1994 Rev 30 to Procedure MO-7A-2, Emergency Diesel Generator 1-2 (K-6B) ML20064E4831994-03-0606 March 1994 ASME Section XI Repair Program, 0054-00101-001-100,rev 0 ML20064E5011994-03-0404 March 1994 Procedure for Application & Exam of Weld Overlay Repairs to Austenitic Stainless Steel Piping Systems, 0054-00101-001-101,rev 0 ML18059A6981994-02-23023 February 1994 Reactor Vessel Integrity Project Plan. ML18059A6881994-02-15015 February 1994 Editorial Changes to Rev 6 to Emergency Implementing Procedure EI-6.13, Protective Action Recommendations for Offsite Populations. ML18059B0201993-12-31031 December 1993 Methods of Alleviating Adverse Consequences of Fluctuating Water Levels in Great Lakes - St Lawrence River Basin, Rept to Govts of Canada & Us,Dtd 931231 ML18059A5541993-11-19019 November 1993 Rev 4 to Attachment 3 to Procedure REC-1, Recovery Plan Format. ML18059A4781993-10-27027 October 1993 Rev 5 to Administrative Procedure 9.11, Engineering Analysis. ML20058N6421993-10-11011 October 1993 Rev 16 to Vol of Administrative Procedures,Procedure 3.2.1, Maint Order Processing, Pages 21 & 22 ML18059A4231993-10-0707 October 1993 Rev 0 to Palisades Plant Pressurizer Safe End Crack Repair Action Plan. ML20059A5181993-09-30030 September 1993 Public Version of Rev 36 to General Ofc Emergency Planning Procedure,App G, Emergency Telephone Numbers. W/931019 Release Memo ML20058N6401993-07-15015 July 1993 Rev 20 to Procedure T7-28, Emergency Diesel Generator Auto Test Start ML20058N6331993-07-15015 July 1993 Rev 142 to Vol 3 of Operating Procedure - Sys SOP-14, Substation ML20127N4321993-01-11011 January 1993 Third Interval ISI Program ML18058B7871992-12-15015 December 1992 Rev 3 to HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment. ML18058B0341992-05-11011 May 1992 Rev 6 to Odcm. ML18058A4331992-05-0707 May 1992 Rev 5 to General Ofc Emergency Planning Procedure EOF-4, Communication Support Team, Page 3,reflecting Editorial Changes ML20141M5531992-03-10010 March 1992 Rev 8 to Vol 25 to Procedure Big Rock Point Radiological Effluent TS Required Documents,Offsite Dose Calculations & Process Control Program ML20090A3401992-02-27027 February 1992 Rev 5 to ODCM ML18058A1461992-01-27027 January 1992 Rev 45 to General Office Emergency Planning Gort/Eof Procedures Index 1998-08-31
[Table view] |
Text
. s ATTACHMENT Consumers Power Company Big Rock Point & Palisades Plcnts Dockets 50-135 & 50-255 Revision 7 SUITABILITY, TRAINING AND QUALIFICATION PLAN July 13, 1988 i
l j
l i
7 Pages OCozee-we5 Ntm esosose m eso m PDR P
ADOCK 05000153 PDC 5@\
k 4
(
ATTACHMENT 1 The following justification for revision pertains to both the Big Rock Point and Palisades Plants. Revised pages are identified as Revision No 7.
PAGE SECTION JUSTIFICATION 1-4 1.3 This section was revised due to a rule change published on January 7, 1988 deleting the requirement that a medical examination must be conducted 30 days prior to conducting a physical fitness ,
test of security personnel.
I d
i 1
.i l
1
).
l l
IC0588-0095A-PP02
- i ATTACHMENT 2 l
BIG ROCK POINT PLANT SUITABILITY Training and Qualification Plan j i
Revision Control Form
' Affected Revision Number Data Pages Approved 2 06/11/84 1, 11, 2-1, through 2-3, 3-1, 4-1, %
Figure 1, VE0 2 of 2, ID50 2 of 2, RFM 1 of 2 1
- 3 02/13/85 i, 11, 1-4, 1-5, 3-1, 4-2 d 1 1 4 03/22/85 i, 11, 1-4, 2-1, 4-2 M 2d 5 04/20/87 1, 11, 2-3. Appendix I - Entiretv.
Appendix II - Entirety w l
6 11/27/87 1,11,1-4, 1-5, 2-3, 1 Appendix II - Entirety [ ,, d#
7 6/30/88 1, 1-4 /Im // # l
/' ~V/
1 1
l l
i i
4 M10185-0023 A-TH03-TH02 1
i . . , . _ . _ _ _ _ - - _ _ - _ - - _ , , - _ . . , _ - . . . , . . - _ - _ . . _ _ - . _ _ _ - - . - . _ . - - , _ - _ . . ..
i TRAINING AND QdALIFICATION PLAN INDEX Pagg SCOPE ............................... ill
- 1. EMPLOYMENT SUITABILITY AND QUALIFICATION . . . . . . . . . . .. .. 1-1 1.1 SUITABILITY . ....... . . . . .. . . . . . . . . .. .. 1-1 1.2 PnYSICAL AND MENTAL QUALIFICATIONS . . . . . . .. . . . ... 1-1 1.2.1 Physical Qualifications . . .. . . . . . . . . .. .. 1-1 1.2.1.1 General Physical Qualifications . . . . . ... 1-1 1.2.1.2 Physical Examination . . . . . .. . . .. .. 1-2 1.2.1.3 Armed Personnel Requirements . .. . . . ... 1-2 1.2.1.4 Other Physical Requirements . . . . . . . ... 1-3 1.2.2 Mental Qualifications . . . . . . . . . . . . . .. .. 1-4 1.2.2.1 Ceneral Mental Qualifications . . . . . . ... 1-4 1.2.2.2 Professional Mental Evaluation . . . . . ... 1-4 1.2.2.3 continued Observation . . . . . . . . . .. .. 1-4 1.3 PHYSICAL FITNESS QUALIFICATIONS . . . . . . . . . . . . .. .. 1-4 1.4 CONTRACT SECURITY PERSONNEL . . . . . . . . . . . . . . . ... 1-5 1.5 PHYSICAL AND MENTAL ANNUAL REQUALIFICATION . .. . . . . ... 1-5 1.6 DOCUMENTATION . . . . . . . . . . .. . . . . . .. . . . ... 1-5 l
1.7 CONSTRAINTS . ....... . . . . . . . . . . . . . . . ... 1-5 j
- 2. TRAINING AND QUALIFICATIONS . . . . . . . . . . . . . . . . . ... 2-1 '
l 2.1 TRAINING REQUIREMENTS . . . . . . . . . . . . . . . . . .. .. 2-1 !
4 2.2 QUALIFICATION REQUIREMENTS . . . . . . . . . . . . . . .. .. 2-2 l I
2.2.1 Individual Responsibility Matrix . . . . .. . . .... 2-2 j
?.2.2 Job Analysis . . . . . . . . . . . . . . .. . . .... 2-2 l 1.2.3 Duty Qualification . . . . . . . . . . . . . . . .... 2-2 2.2.4 Individual Qualification Record (IQR) . . . . . .... 2-2 2.2.5 Test Materials . . . . . . . . . . . . .. . . . .... 2-3 l l
\
l hevision 7 rp0680-0785a159-42 June 30, 1988 i
, 1-4 detected, the situation will be reported to the decurity Force Leader for appropriate tesolution (ie, referral to a physician).
1.2.2 Mental Qualifications 1.2.2.1 General Mental Qualifications Supervisory and training personnel will, as part of their normal duties, observe their perse.inel to detect any indication that they cannot provide the required mental and communicative skills demanded by their duty assign-ments. The ability of an individual to meet these re-quirements will be demonstrated during the testing by performance objectives of necessary tasks.
1.2.2.2 Professional Mental Evaluation Security personnel will be evaluated by a licensed health !
professional trained to identify emotional instability.
The professional must attest that his or her evaluation detected no mental condition that would interfere with the individual's ability to perform the~ crucial tasks associated with his or her assigned secu'rity duties.
1.2.2.3 Continued Observation Supervisors ,ill be constantly alert to detect any in-dications of emotional instability on the part of their shift personnel. Any individual demonstrating an appar-ent lack of mental ability or emotional stability will be promptly referred to the licensed health professional for evaluation. The person concerned will not be-reassigned to security duty until a statement is received from the profassional attesting that the individual is mentally fit to perform the crucial tasks associated with his cr her assigned security duties.
1.3 PHYSICAL FITNESS QUALIFICATIONS All armed members of the Security Force, excluding CAS/SAS operators, will comply with the physical fitnese requ rements by successfully demon-i strating the performance objectives for Task 5.5 as outlined in Appen-dix I, Vehicle Escort Officer. The results of the physical fitness testing will be recorded as prescribed in Paragraphs 2.2.4 and 2.3.
Revision 7 rp0690-0785a159-42 June 30, 1988
.- . ~ . - -. . . .
ATTACHMENT 3 1
PALISADES PLANT SUITABILITY Training and Qualification Plan Revision Control Form Revision Affected Number Date Pages App roved ,
1 2 06/11/84 1, 11, 2-1, through 2-3, 3-1, 4-1, e
Figure 1, VE0 2 of 2, ?DSO 2 of 2, l
RFM 1 of 2 l 3 02/13/85 i, 11, 1-4 , 1-5, 3-1, 4-2 l 4 03/22/85 1, 11, 1-4, 2-1, 4-2 4G M 5 04/20/87 1, 11, 2-3. Appendix I - Entirety.
Appendix II - Entirety __
w 6 11/17/87 1,11,1-4, 1-3, 2-3, Appendix II - Entirety [ x<s/ I. w 7 6/30/88 1. 14 -u W e u/
D M
O
'110185-0023A-TH03-TH02
i l
0
. 1 1
TRAINING AND QUALIFICATION PLAN INDEX Page SCOPE .............................. iii ,
- 1. EMPLOYMENT SUITABILITY AND QUALIFICATION . . . . . . . . . . . .. 1-1 1.1 SUITABILITY . . . . . . . . . . . . . . . . . . . . . . . .. 1-1 1.2 PHYSICAI. AND MENTAL QUALIFICATIONS . . . . . . . . . . . .. 1-1 1.2.1 Physical Qualifications . . . . . . . . . . . . . .. 1-1 1.2.1.1 General Physical Qualifications . . . . . .. 1-1 1.2.1.2 Physical Examinati_on . . . . . . . . . . .. 1-2 1.2.1.3 Armed Personnel Requirements . . . . . . .. 1-2 1.2.1.4 Other Physical Requirements . . . . . . . .. 1-3 1.2.2 Mental Qualifications . . . . . . . . . . . . . . .. 1-4 1.2.2.1 Ceneral Mental Qualifications . . . . . . .. 1-4 1.2.2.2 Professional Mental Evaluation . . . . . .. 1-4 1.2.2.3 Continued Observation . . . . . . . . . . .. 1-4 1.3 PHYSICAL FITNESS QUALIFICATIONS . . . . . . . . . . . . . .. 1-4 1.4 CONTRACT SECURITY PERSONNEL . . . . . . . . . . . . . . .. 1-5 1.5 PHYSICAL AND MENTAL ANNUAL REQUALIFICATION . . . . . . . .. 1-5 1.6 EJCUMENTATION . . . . . . . . . . . . . . . . . . . . . . .. 1-5 1.7 CONSTRAINTS . . . . . . . . . . . . . . . . . . . . . . . .. 1-5 i i
1
- 2. TRAINING AND QUALIFICATIONS . . . . . . . . . . . . . . . . . .. 2-1 l l
1 2.1 TRAIN 7NG REQUIREMENTS . . . . . . . . . . . . . . . . . . .. 2-1 1 2.2 QUALIFICATION REQUIREMENTS . . . . . . . . . . . . . . ... 2-2 2.2.1 Individual Responsibility Matrix . . . . . . . . . .. 2-2 2.2.2 Job Analfsis . . . . . . . . . . . . . . . . . . ... 2-2 1 2.2.3 Duty Qualification . . . . . . . . . . . . . . . ... 2-2 l 2.2.4 Individual Qualification Record (IQR) . . . . . ... 2-2 l 2.2.5 Test Materials . . . . . . . . . . . . . . . . . ... 2-3 I i
l Revision 7 i rp0484-0914al46-42 June 30, 1988
' I
. 1-4 l
1 detected, the situation will be reporteC to the Se-curity Force Leader for appropriate resolution (ie, referral to a physician).
1.2.2 Mental Qualifications 1.2.2.1 General Mental Qualifications Supervisory and training personnel will, as part of their normal duties, observe their petaonnel to detect any indication that they cannot provide the required mental and commanicative skills demanded by their duty assign-ments. The ability of an individual to meet these re-quirements will be demonstrated during the testing by performance objectives of necessary tasks.
1.2.2.2 Professional Mental Evaluation Security personnel will be evaluated by a licensed health professional trained to identify emotional instability.
The professionel must attest that his or her evaluation detected no mental condition that wculd interfere with the individual's obility to perform the crucial tasks associated with his or her assigned security duties.
1.2.2.3 Continued Observation Supervisors will be constantly alert to detect any in-dications of emotional instability on the part of their shift personnel. Any individual demi.nstratin3 an appar-ent lack of mental ability or emotioral stability will be promptly referred to the licensed health professional for evaluation. The person concerned will not be reassigned to security duty until a statement is received from the professional attesting that the individual is mentally fit to perform the crucial tasks associated with bis or her assigned security duties.
1.3 PHYSICAL FITNESS QUALIFICATIONS All armed members of the Security Force, excluding CAS/SAS operators, will comply with the physical fitness requirements by successfully dert.on-strating the performance objectives for Task 5.5 as outlined in Appen-dix I, Vehicle Escort Officer. The results of the physical fitness testing will be recorded as prescribed in Paragraphs 2.2.4 and 2.3.
Revision 7 rp0484-0914a146-42 June 30, 1988
e .
4 ,i ]
Consumers ;
power rowsmna MKH0GAN's PROGRE55 General officest 1945 West Parnall Road, Jackson, MI 49201 e (517) 788 0550 July 13, 1968 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -
DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
REVISION 7 TO THE SUITABILITY, TRAINING AND QUALIFICATION PLAN Attached are the Big Rock Point Plant and Palisades Plant Suitability, Training and Qualification Plan, Revision No. 7.
Attachment 1 contains the justification for changes made to the Big' Rock Point Plant and Palisades Plant Suitability, Training and Qualification Plan. Attachment 2 and 3 contain page changes to the Big Rock Point and Palise Plant Suitability, Training and Qualification Plans respectively.
Consumers Power Company has determined that these changes do not degrade the safeguards effectiveness of the plants and therefore submit these changes under the provision of 10CFR50.54(p).
u_v Brian D Johnson Staff Licensing Engineer {
l CC Administrator, Region III, NRC NRC Resident Inspectors - Big Rock Point & Palisades (w/o attachments) ;
Attachment OC0788-0065-NLO4 0000 J !
('k