JJ-tL{-h-]l ALLEGATION REVIEW CASE NUMBER 4-84-A-71 DATE OPENED 06/27/84 FACILITY NAME Wolf Creek 50-482 SUBJECT Allegation startup and construction SOURCE OF ALLEGATION Contractor employee I
NUMBER OF ALLEG.
5 4
ASSIGNED TO RPS"A" CROSS REF. NO.
ACTION SCHEDULED Inspection FIRST/LAST NAME D. Denise DATE ASSIGNED 06/27/84 REPORT NUMBER 1st:
)
2nd:
Lst:
FTS NUMBER 8-728-8100 DUE DATE ALLEGATION SUBSTANT i
SORT CODE A
DATE CLOSED ACTION OFFICE RIV ItAN HOURS AEPORT PREPARATION ASSIST DETAILS: A startup engineer from MATSCO made the following allegations:
1.
The disposition of Default / Deficiency Report 84-23 was wrong and should have been reported as a 50.55(e).
2.
Many systems are turned over from construction so incomplete that TSN's are issued in a gross manner and could lead to oversight.
3.
Startup group suggestions for design improvement are strongly resisted by Bechtel.
4.
Nylon screws and washers have been used to land electrical cables.
i 8606250572 860618 PDR FOIA STEPHEN 85-594 PDR B-W e s -LW Lo