Public Version of Revised Emergency Plan Implementing Procedures Including,Rev 2 to GEN-1, Overview, Rev 2 to GEN-3, On-Shift Sys Power Controller & Rev 0 to GORT-1, General Ofc Response Team (Gort). W/860730 Release Memo
ML20203H676
Person / Time
Site: Palisades, Big Rock Point, 05000000
Issue date: 07/21/1986
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
PROC-860721, NUDOCS 8608050057
Download: ML20203H676 (125)


Text

o- COR$Umh Attachnent C POWtf U DOCUfGi.T TRANSMITTAL AND ACKN0tJLEDGIEIE To: kkO Date: 7/21/86

'teS 3 DC2a555 Return To: Alta Carley Pil-030 atn& DramtatCcdvt M -

T&"#" ""

Attached are revisions to:

C:py No of the GORT/ EOF EMERGENCY IMPLEMENTING PROCEDURES which is assigned to you. New or revised documents are listed below with instructions.

DOCUMENT NO. TITLE RD:0VE INSERP Please replace your existing binder with this larger binder. You may return your old binder to General Office - Document Control Center.

Cspyholders List Rev 5 Rev 6 Index Rev 5 Rev 6 GEN-1 Rev 1 Rev 2 GEN-2 Rev 4 Cancellatic GEN-3 Rev 1 Rev 2 GORT-1 Vf D d. D bb 3 -

Rev 0 E0F-1 Rev 1 Rev 2 EOF-2 Rev 1 Rev 2 EOF-3 Rev 1 Rev 2 EOF-4 Rev 1 Rev 2 EOF-5 Rev 1 , Rev 2 EOF-6 Rev 1 Rev 2 EOF-7 Rev 1 Rev 2 GL,00050057 060721 EOF-8 PDR ADOCK 05000155 Rev 1 Rev 2 F PDR EOF-9 Rev 1 Rev 2 continued /

Please sign, date and return this transmittal form to the person indicated above. ,

e l l My Address is the same. My Address is as follerws

,g My copy has been brought to current status and superseded material removed and destroyed  ;

per instructions. j l

~

Signature Date Manual No l

  • COR$Umef5 Atta:h cnt C POWtf EN0Y DOCU?Elr TRAN51JTTAL AND ACKNOED3fEIC To: Date: 7/21/86 Return To: Alta Carley Pil-030 RETURN TRANSICITAL WITHIN 10 WORKING DAYS Attached are revisions to:

Copy No of the CORT / EOF EMERGENCY IMPLEMENTING PROCEDURES which is assigned to you. New or revised documents are listed below with instructions.

DOCUMEIE NO. TITLE RDIOVE INSDE _

EOF-10 Rev 1 Rev 2 EOF-11 Rev 1 Rev 2 EOF-12 Rev 1 Rev 2 Appendix C Rev 0 Cancellati Appendix E Rev 0 Cancelleti Appendix G -

Rev 0 I

Appendix H -

Rev 0 Return transmittal to:

Consumers Power Company 1945 Parnall Road Jackson, MI 49201 Attn: Document Control Center Alta Carley Inspection and Enforcement:

" Title 10 CFR 50.54 (q) and 10 CFR 50 Appendix E-V require that copies of changes to the Site Emergency Plan and Implementing Procedures be submitted to the NRC within 30 days after the change is made. This transmittal fulfills that requirement,"

Please si6n, date and return this transmittal form to the person indicated above.

I l My Address is the same. My Addrest is as follows ,

My copy has been brought to current status and superseded material removed and destroyed per instructions.

M anature nata vaml Nn ,,

'PROPIETARY INFORMATION LOCATIONS Proprietary information (ie, telephdne numbers and personnel names) appears in the GORT/ EOF Emergency Implementing Procedures. Please expunge that information upon any release of the procedures from your offices. The loca-tion of proprietary information is identified below:

Procedure Page Section Gen 2 All All Gen 3 2 4.2.2.A Gen 3 Gen 3 2 4.2.3 Gen 3 3 4.3.2.A Gen 3 3 4.3.3 3 4.3.4 Cen 3 4 4.3.4 Gen 3 4 4.3.5 Gen 3 4 4.3.6 Cen 3 4 4.3.7 Cen 3 4 4.3.8 EOF 4 8 EOF 4 Attachment 2 EOF 4 9 Attachment 2 12 Attachment 4 EOF 4 13 Attachment 4 EOF 4 14 Attachment 4 Appendix A All All Appendix B All All Appendix D All All Appendix E 2 4.2.1.2 O

9 l

., ,, _ _ _ _ _ _ . . _ _ . . . __, _ . , .. _ _ , _ _ _ _ . . _ _ . _ , _ , . _ . . __ . l... _.

D, 0 REMOVE BINDER INSERTS AND PLACE THEM IN NEW BINDER.

CONSUMERS GENERAL OFFICE PROC NO

- POWER EMERGENCY PLANNING PAGE 1 0F 2 COMPANY PROCEDURE REV 6 CONTROLLED COPYHOLDERS' LIST GENERAL OFFICE RESPONSE TEAM / EMERGENCY OPERATIONS FACILITY EMERGENCY IMPLEMENTING PROCEDURES CORT / EOF EIP's Copyholders Controlled Copy #

Document Control Master File (P-11-030) 1 General Office Response Team Area, K L Penrod (P-26-104) 2,3,4,5 Palisades Emergency Operations Facility, M L Green 6 (Palisades)

Palisades Technical Support Center, K Kasishke (Palisades) 7 Palisades Emergency Operations Facility, M L Green 8, 9, 10, 11, 12, (Palisades) 13 Palisades Technical Support Center, K Kasishke (Palisades) 14 Palisades Emergency Planning, J R Brunet (Palisades) 15, 16 Palisades Plant Manager, J F Firlit (Palisades) 17 i

Big Rock Point Emergency Operations Facility, 18, 19, 20, 21 L A Oostmeyer (Big Rock Point) 22, 23, 24, 25 (Lost) 26 Big Rock Point Emergency Planning, J E Werner (Big Rock 27 Point)

Big Rock Point Emergency Planning, J L Beer (Big Rock 28 Point)

Vice President - Nuclear Operacirns, F W Buckman 29 (P-26-117B)

Returned 30, 31, 32, 33 Vice President - Energy Supply Services, R B DeWitt 34 (P-26-135B)

Or.-Call Director, W J Beckius (P-26-203) 35 On-Call Director, K W Berry (P-24-614A) 36 (Lost) 37 On-Call Director, D R Hughes (P-24-428A) 38 GORT/ EOF EIP COPYHOLDERS

-, .. .~ - _ _ . - _ - _ ._. -

. ~7~

CONSUMERS GENERAL OFFICE PROC NO POWER EMERGENCY PLANNING PAGE 2 0F 2 COMPANY PROCEDURE REV 6 CONTROLLED COPYHOLDERS' LIST '

GENERAL OFFICE RESPONSE TEAM / EMERGENCY OPERATIONS FACILITY EMERGENCY IMPLEMENTING PROCEDURES GORT/ EOF EIP's Copyholders Controlled Copy #

On-Call Director, G B Slade (P-26-408A) 39 ,

On-Call Director, E R VanHoof (P-26-316) 40 Power Control, W M Garrison (P-11-232) 41 Nuclear Training Center, J L Fontaine (NTC) 42, 43 Emergency Management Division, Michigan State Police. 44 J M Tyler (111 South Capitol, Lower Level, Lansing, MI 48913)

Nuclear Facility & Environmental Monitoring Section, 45 Radiological Health Services Division, Michigan Department of Public Health, D R Hahn (3500 N Logan St, P O Box 30035 Lansing, MI 48909)

US Nuclear Regulatory Commission (Document Control Desk, 46, 47 Washington, DC 20555)

US Nuclear Regulatory Commission, Region III (Regional 48, 49, 50 Administrator, Incident Response Center, 799 Roosevelt Road, Glen Ellyn, IL 60137)

On-Call Director, T W Elward (P-21-135A) 51 Big Rock Point Technical Support Center, A M Rau 52 (Big Rock Point)

Detroit Edison Company, T Randazzo (164 NOC, EOF 53 Information Center, 6400 North Dixie Highway, Newport, MI 48166)

Palisades Technical Support Center, K Kasishke (Palisades) 54, 55, 56 General Office Document Control, A M Carley (P-11-030) 57 Lost 58

/ } i Approved: #/-, ' ,,' u . /

4' %d GeneralOfficeEmergencyf Planning Administrator'i' Date: T ,w.

/

GORT/ EOF EIP COPYHOLDERS l

l . _ - - - . . - - . . .- , - - . __.

e e GENERAL OFFICE EMERGENCY P1ANNING Revision 6 CORT / EOF PROCEDURES Page 1 of 1 In'ex d

Procedure Revision Date Last Annual Number Number Issued Title Review Date GEN-1 2 7/86 Overview 6/86 GEN-2 -

Cancelled GEY-3 3 7/86 On-Shift System Power Controller 6/86 GEN-4 -

Cancelled GOCC-1 -

Cancelled GOCC-2 -

Cancelled GOCC-3 -

Cancelled GOCC-4 -

Cancelled GOCC-5 -

Cancelled GOCC-6 -

Cancelled GOCC-7 -

Cancelled COCC-8 -

Cancelled COCC-9 -

Cancelled GOCC-10 -

Cancelled GOCC-11 -

Cancelled GOCC-12 -

Cancelled GORT-1 0 7/86 General Office Response Team 6/86 EOF-1 2 7/86 Emergency Officer 6/86 EOF-2 2 7/86 Emergency Operations Facility Director 6/86 EOF-3 2 7/86 Emergency Operations Facility Administrator 6/86 EOF-4 2 7/86 Communications Support Team 6/86 EOF-5 2 7/86 Reactor Engineering / Accident Analysis Support Team 6/86 EOF-6 2 7/86 Plant Support Engineering Support Team 6/86 EOF-7 2 7/86 Health Physics Support Team 6/86 EOF-8 2 7/86 Public Affairs 6/86 EOF-9 2 7/86 Emergency Planning 6/86 EOF-10 2 7/86 Property Protection 6/86 EOF-11 2 7/86 Secretarial / Clerical Support Team 6/86 EOF-12 2 7/86 Logistics Support Team 6/86 Appendix A 65 7/84 Mutual Assistance Agreement Appendix B 00 10/84 Nuclear Power Plant Emergency Response Voluntary Assistance Agreement Appendix C -

Cancelled Appendix D' 1 5/83 BWR Emergency Supporc Program per Letter from General Electric Appendix E -

Cancel 4e1 Appendix F 0 4/86 Offsite Dose Calculation - Segmented Gaussian Appendix G 0 7/86 Emergency Telephone Numbers Appendix H 0 7/86 EOF Training Matrix

?

Approve d'/N /

A

  • T**~C l/

7//U GO Emergency Planhing Administrator Bate GORT/ EOF PROCEDURES INDEX l

l

- GENERAL OFFICE EMERGENCY PLANNING PROC NO GEN-1 Revision 2 APPROVAL

SUMMARY

TITLE: OVERVIEW

-~Sc./ v Sk7fsd' Quality Assurancs Support - Concurrence 'Date 7

0 g v . .' -

- $ U $

eneral Office Emedency Planning - Approval Date w VM '7 ,50 >

Nuclear Operations Department - Appre / Date APPROVAL

SUMMARY

^

  • e ,

CONSUMERS GENERAL OFFICE PROC NO GEN-1 POWER EMERGENCY PLANNING PAGE 1 0F 16 COMPANY PROCEDURE REV 2 OVERVIEW

1.0 INTRODUCTION

1.1 PURPOSE In the event of an emergency situation at one of its two nuclear facili-ties, Consumers Power Company is committed to activate an experienced and trained emergency response staff to operate the Company's Emergency Operaticas Facilities. For the purpose of emergency response facilities, activation,and operational are defined as follows:

Activation: Process by which an emergency response facility is staffed and prepared for operation.

Operational: Status of an emergency response facility following i

assumption of intended functions and responsibilities.

Upon notification of the emergency condition by the affected plant, the General Office Response Team (G0RT) will report to the General Office Emergency Response area (P-26-104) to monitor the emergency and, if required, mobilize Corporate response to assist in manning the Emergency Operations Facility (EOF). The GORT will serve as an initial operational base for Corporate emergency response. The EOF will relieve the affected plant Technical Support Center (TSC) of those duties nyt directly related to the plant emergency, as well as take over responsibility for coordination of the emergency response activities with Federal, State and County agencies as soon as possf.ble.

To meet this commitment, Consumers Power Company has developed the General Office Response Team / Emergency Operations Facility Implementing

! Procedures.

t l PR0685-0211B-TP13-NC05 l

l 1

(

CONSUMERS GENERAL OFFICE PROC NO GEN-1 POWER EMERGENCY PLANNING PAGE 2 0F 16 COMPANY PROCEDURE REV 2 OVERVIEW 1.2 FUNCTIONS The Emergency Operations Facility staff will perform the following functions:

Manage overall Consumers Power Company emergency response;

~

a.

b. Coordinate offsite radiological and environmental assessment; e
c. Provide offsite dose analysis;
d. Recommend public protective actions to State and local emergency response agencies;
e. Coordinate emergency response activities with Federal, State and local agencies;
f. Coordinate information provided to JPIC;
g. Manage initial recovery operations;
h. Provide engineering, health physics, meteorology and logistics support to the TSC;
i. Provide official information to Federal and State agencies.

1.3 EMERGENCY CLASSIFICATION Provided below is a brief review of the four emergency classes and the corresponding specific level of readiness compatible with the severity of the situation.

PR0685-0211B-TP13-TP01

W 4 CONSUMERS GENERAL OFFICE PROC N0 GEN-1 POWER EMERGENCY PLANNING PAGE 3 0F 16 COMPANY PROCEDUllE REV 2 OVERVIEW Lowest to highest, the classes are:

Unusual Event - The lowest level of emergency which is a problem at the facility but can usually be handled by security or the normal plant operating shift.

- Operations Support Center (OSC) activation is optional.

Alert - A problem in the plant more serious than an Unusual Event.

Events are in progress or have occurred which involve an actual or potential degradation of the level of the safety of the plant. Re-sponse personnel in addition to the normal operating shift are required. The JPIC may be activated at this time.

- OSC and Technical Support Center (TSC) are activated. GORT activated to monitor the emergency. Full EOF activation is optional; Big Rock Point dispatches personnel to EOF.

Site Area Emergency - Events are in progress or have occurred which involve actual or likely major failures of plant functions needed for the protection of the public. Releases are not expected to exceed Environmental Protection Agency Pretactiwe Action Guides (EPA PAGs) exposure levels, except within the site boundary.

- OSC, TSC, EOF and JPIC are activated.

General Emergency - Events are in progress or have occurred which involve actual or imminent substantial core degradation or melting with potential for loss of containment integrity. Any radioactive release can be reasonably expected to exceed the EPA PAGs exposure levels offsite. l

- OSC, TSC, EOF and JPIC are activated.

PR0685-0211B-TP13-NC05

CONSUMERS GENERAL OFFICE PROC NO GEN-1 POWER EMERGENCY PLANNING PAGE 4 0F 16 COMPANY PROCEDURE REV 2 CVERVIEW 2.0 ORGANIZATION 2.1 GORT ORGANIZATION The organization of the GORT is shown in Attachment 1. The GORT will be manned by personnel from General Offices in Jackson. A brief description of responsibilities follows:

Senior Management

- At the request of the Site Emergency Director (SED), may authorize use of both Company and non-Company resources.

- Becomes Emergency Officer when EOF is activated.

Director

- Consults with the SED regarding emergency conditions, and apprises Senior Management of those conditions and requests for assistance.

- Becomes EOF Director when EOF is activated.

Emergency Planning Representative

- Acts as a resource person to Senior Management and the Director.

- Ensures additional personnel are mobilized as required.

Radiological Advisor

- Interprets and advises the Director concerning radiological condi-tions resulting from the emergency.

PR0685-0211B-TP13-TP01

CONSUMERS GENERAL OFFICE PROC NO GEN-1 POWER . EMERGENCY PLANNING PAGE 5 0F 16 COMPANY PROCEDURE REV 2 OVERVIEW

  • Public Affairs Representative

- Gathers information from the Director and transmits information and press releases to the General Office Information Center.

l

  • Logistics Representative

- Assures the operability of communication channels in the GORT area.

2.2 EOF ORGANIZATION The organization of the EOF is shown in Attachment 2. The EOF will be.

manned by personnel from the General Offices in Jackson and the plants.

Appendix H contains a matrix which designates training required for personnel staffing of the EOF. A brief description of the staff duties follows:

  • Emergency Officer

- Has overall responsibility for the entire CP Co emergency response.

Attachment 3 contains organizational diagram of Consumers Power Company emergency response and interfaces with offsite organizations.

- Ensures that the full resources of Consumers Power Company are made i available as required to secure the plant systems and to minimize the

effects of the incident on plant personnel and the public, including the availahility of other utilities and consultant resources.

- Upon arrival to the GORT area and thereafter, the Emergency Officer will have Communication capability with the plant and shall have authority to approve any actions or requests for additional assis-PR0685-0211B-TP13-NC05 i

CONSUMERS GENERAL OFFICE PROC NO GEN-1 POWER EMERGENCY PLANNING PAGE 6 0F 16 COMPANY PROCEDURE REV 2 OVERVIEW tance. The Emergency Officer will report to the EOF within about an hour at Palisades and an hour and a half at Big Rock Point upon declaration of a site area emergency.

EOF Director

- Responsible for assigning and coordinating the activities of the Emergency Operations Facility. Also serves as the primary liaison between the plant and specific nonlocal offsite organizations and individuals (eg, DOE, NRC, State of Michigan, etc).

EOF Administrator

- Coordinates administrative functions of the EOF and manages the facility until arrival of EOF Director.

+ Communication Support Team

- Acts as primary communicator between EOF and outside organizations and individuals; maintains a record of all communications.

  • Reactor Physics / Accident Analysis Support Team'
  • - Provides the EOF Health Physics Support Term vith engineering support necessary in performing source term calculations. Provides technical assistance pertaining to reactor physics. This assistance may include verifying the extent of the emergency situation and providing advice to the EOF Director and the plant in matters related to reactor physics and accident analysis. At Palisades, technical assistance will include chemistry, plant operations and reactor engineering.

l l

l I PR0685-0211B-TP13-NC05 i

CONSUNERS GENERAL OFFICE PROC N0 GEN-1 POWER EMERGENCY PLANNING PAGE 7 0F 16 COMPANY PROCEDURE REV 2 OVERVIEW Plant Support Engineering Support Team

- Provides the EOF Health Physics Support Team with engineering support necessary in performing source term calculations. Will advise the EOF Director and the plant in technical engineering matters.

Health Physics Support Team

- Advises the EOF Director on recommended protective actions. Provides technical health physics and meteorological support to the EOF Director. This assistance will include offsite dose analysis, meteorological support, and advice to the EOF Director in matters related to health physics.

Emergency Planning

- Acts as a resource person in technical and nontechnical areas and to provide interface support between emergency response organizations (both Company and non-Company).

  • Public Affairs Representative

- Gathers information from the EOF Director and staff and transmits prepared information and news releases to the General Office Informa-tion Center or Joint Public Informaticn Center for release to the media.

PR0685-0211B-TP13-NC05

CONSUMERS GENERAL OFFICE PROC N0 GEN-1 POWER EMERGENCY PLANNING PAGE 8 0F 16 _

COMPANY PROCEDURE REV 2 OVERVIEW Property Protection Support Team

- Provides assistance to support plant security as requested. Coordi-nates assignment of security personnel throughout the offsite emer-gency organization.

  • Secretarial / Clerical Support Team

- Provides general assistance to the EOF emergency response organization.

  • Logistics

- Duties include coordination and maintenance of all support services required to keep the EOF operating in a reliable and efficient manner.

3.0 ACTIVATION The General Office Response Team will be activated whenever an Alert is declared at either plant.

Activation of the EOF at the Alert level will be at the request of the Site Emergency Director. Activation of the EOF is mandatory at the Site Area Emergency or General Emergency classification.

Activation flow diagrams are given for the GORT and EOF in Attachments 4 and 5, respectively. A general description of the activation process for each facility is given below.

PR0685-0211B-TP13-TP01

1 . CONSUMERS GENERAL OFFICE PROC NO GEN-1 POWER EMERGENCY PLANNING PAGE 9 0F 16 COMPANY PROCEDURE REV 2 OVERVIEW 3.1 ACTIVATION OF THE GORT

a. At the alert stage or above, Control Room notifies Jackson Power Controller.

NOTE: For an unusual event, the GORT is not activated,

b. Jackson Power Controller notifies the Parnall Receptionist / Security Guard, the Senior Management Representative, the Director, Emergency Planning Representative, Public Affairs Representative, Radiological Advisor and unaffected plant control rooms.

I

c. When the GORT arrives, communications with TSC are established. l
d. At this point, the GORT is operational.

3.2 ACTIVATION OF THE EOF

a. The Site Emergency Director dispatches designated plant personnel to the EOF to initiate those actions necessary to augment the onsite emergency organization.
b. The Logistics Support Team Leader will notify the appropriate R2gion personnel to initiate actions to have the Emergency Operstions Facility activated.
c. The Director designates additional support personnel to staff the EOF. He instructs LoEi stics to make travel arrangements. Senior Management, the Director, Emergency Planning Representative, Radio-logical Advisor and other personnel deemed necessary are dispatched PR0685-0211B-TP13-TP01

o CONSUMERS GENERAL OFFICE PROC NO GEN-1 POWER EMERGENCY PLANNING _PAGE 10 0F 16 COMPANY PROCEDURE REV 2 OVERVIEW to the EOF via Company aircraft or charter aircraf t. Additional staff travels to the EOF via Company vehicles, rental vehicles and/or private vehicles.

d. The Emergency Planning Representative ensures that the additional support personnel to staff the EOF are notified.
e. While the designated EOF staff is in transit, the Region Buildings Services Department or Conference Center staff assists the specified plant personnel in setting up the EOF. This includes:

Telephone Hookups Setup of Status Boards and Emergency Planning Zone Maps Setup of Computer Terminals Setup of Tables, Desks, Chairs, Signs, Nameplates, etc Supplies (Pens, Paper, Forms, etc)

  • PA System Arrangements for Food, Security, Transportation, Housing or Bedding, Laundry and Radios, as required.
f. Upon arrival, establish communications with the TSC. Accident status decisions and actions are reviewed with plant personnel assigned to the EOF.

PR0685-0211B-TP13-TP01

1 CONSUMERS GENERAL OFFICE PROC NO GEN-1 l POWER EMERGENCY PLANNING PAGE 11 0F 16 COMPANY PROCEDURE REV 2 OVERVIEW

g. As soon as the individual support teams are assembled and function-ing, having established communications with their counterparts in the TSC, the EOF teams are ready to accept responsibilities from the TSC.

As each team becomes ready to accept its responsibilities, the SED and EOF Director are informed.

h. When the appropriate teams are ready and the EOF is judged to be prepared to assume responsibility, the EOF Director requests the SED to transfer authority to the EOF.

4.0 PROCEDURE The attached procedures define those tasks and responsibilities of the Emergency Response Staff at General Office and at the Emergency Opera-tions Facility.

PR0685-0211B-TP13-TP01

e . .

CONSUMERS GENERAL OFFICE PROC NO GEN-1 POWER EMERGENCY. PLANNING PAGE 12 0F 16 COMPANY PROCEDURE REV 2 OVERVIEW ATTACIIMENT 1 GENERAL OPPICE RESPONSE TEAM ORGANIZATION senior MANAGEMENT OtRtCTOR E"E"OI RAOICLOGICAL LOGISTICS PUGLIC App Aems

' W *O ACvlSOR & CLERE R EPMESENTATiv t m EP#E SENTATiV E o

PR0685-0211B-TP13-TP01

  • a CONSUMERS GENERAL OFFICE PROC NO GEN-1 POWER EMERGENCY PLu'NING PAGE 13 0F 16 COMPANY PROCEDURE REV 2 OVERVIEW ATTACHMENT 2 EMERGENCY OPERATIONS FACILITY ORGANIZATION osuency 0FFICER EOF DIRECTOR l EOF Aminimaru i i t i i i REACTOR Puni HEALTH MulCATim PUBLIC D6ERGDCY ENGINEERING PHYSICS AFFal43 PLANNINe ENG 40 l

PROPERTY SECRETAa:AL

& CLERICAL LOGISTICS P90TECT10m l

l PR0685-0211B-TP13-TP01 i

CONSUMERS GENERAL OFFICE PROC NO GEN-1 POWER . EMERGENCY PIAVNING PAGE 14 0F 16 COMPANY PROCEDURE REV 2 OVERVIEW ATTACHMENT 3 EMERGENCY RESPONSE INTERFACES E M AGEftCY

~

OFFICER l

14 E0F E g,.T,E, , E,C,Y 0 g,0. .

I l 1 rE CnniCAL OPEnA r:0=At I surPoni CC"T"O' '

surrent ROOM i CENTEn eggygn l

1 r___ q_____9____ ,

! i i i FEDERAL STATE i g4y ', A00silosAL GOVER=uENT GOVEmmmENT CENTER AGENCIES I I I I l 3 I

COUnfY I GovEq=mE=T I AUTHORITY

- - - - - C0==u=ri0a ,.____..!._____,

e i I ElePL YEE5

" 30 " U'*

PR0685-0211B-TP13-TP01

__ - - < , ' ~ ' ' ' ~ '

ee &

CONSUMERS GENERAL OFFICE PROC N0 GEN-1 POWER EMERGENCY PLANNING PAGE 15 0F 16 COMPANY PROCEDURE REV 2 l

OVERVIEW ATTACHMENT 4 l

GENERAL OPPICS RESPONSE TEAM ACTIVATION PLOW OlAGRAM i l

CONTMCL - -

SENt04 .

ROOM MANAcaugNT I

o

,I

  • '" i CONTROL _

"" . _ _ . . .J CIRECTOR l

l o ,I 1

PAaNALL eveuC Ansaia I secua:Tv mEemessNTATive ~~~~7 l

m l

suitoiNo I suenceNCY SERVICES / g PLANNING LOGisT1C3 R EPM ESENTATIV E  !

I o i p---___, I I SET up I

_ naciotoo Cat ,,,,,,__,_4 l ...T...A .--

u _ _ _ _ _ _ a, i

---, i c- n I I acT vata
,,,, p _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _. - .;'

L(CLERE WO8tL:ZEDI_ - - -. d NOT10 tCAT'ON

-.== = ACTIC8e PR0685-0211B-TP13-TP01

, , , ~,,.y .m,- - - _ _ , . . . - - . . . _ _ . - _ _ _ _ - . -- _ ,. , ._-,,,--,--, ,-._,,,- -- m--.- - ,, . . _ ~ . ~ , - - - - . .

l CONSUMERS GENERAL OFFICE PROC NO GEN-1 POWER EMERGENCY PLANNING PAGE 16 0F 16 COMPANY PROCEDURE REV 2 OVERVIEW ATTACHMENT 5 EOF : ACTIVATION

  • FLOW CHANT GORT G.O.

DIRECTOM EOF STAFF l

o u I I

G.O. BUILDING l EOF STAFF COORDINATOR  !

I I

I l

CPCO REGICN l l STAFF l l  !

I I  !

,l ,-__}-__, ,I I  ! SET UP  !

I I I I EOF l l l g L _ _ 7 _ _ _t l l u I

, p_ _..___q l l l ACTIVATE l  !


M go, W-___-_ J l I u-______a l

I NOTIFICATION

. _ - . ACTION l

l PR0685-0211B-TP13-TP01 '

GENERAL OFFICE EMERGENCY PLANNING PROC NO GEN-2 CANCELLED APPROVAL

SUMMARY

TITLE: EMERGENCY TELEPHONE NUMBERS Quality Assurance Support - Concurrence Date lM Y ( hb eneral Of fice Emerge'ncy Planning - Approval '

bate Nuclear Operations Department - Approval Date This procedure has been replaced by Appendix G of these procedures.

I i

,s i

APPROVAL

SUMMARY

GENERAL OFFICE EMERGENCY PLANNING PROC NO GEN-3 Revision 2 ,

APPROVAL SLM!ARY TITLE: ON-SHIFT SYSTEM POWER CONTROLLER

=W Quality Assurance Support - Concurrence W/Y7/h6 Date

(/ I v& $ 6 N enefal Office Emergency Planning - Approval # Ifate 1

/*

N c1e.r 0,er.u _ Oe,.mmen - 0.te l

l l

l l

APPROVAL SL M Y

CONSUMERS GENERAL OFFICE PROC NO GEN-3 POWER EMERGENCY PLANNING PAGE 1 0F 8 COMPANY PROCEDURE REV 2 ON-SHIFT SYSTEM POWER CONTROLLER 1.0 PURPOSE The purpose of this procedure is to describe and define the responsibility of the Corporate On-Shift System Power Controller during an emergency situation at a Consumers Power Company (CPCo) nuclear facility, or when a request for mutual assistance has been received from another nuclear utility.

2.0 ATTACHMENTS Attachment 1, " Power Control Checklist" Attachment 2, " Mutual Assistance Request Checklist" 3.0 INITIAL CONDITIONS AND/OR REQUIREMENTS Palisades or Big Rock Point must be at an Unusual Event, Alert, Site Area Emergency, or General Emergency or a request for mutual assistance must be received from another utility before initiation of this procedure.

4.0 RESPONSIBILITIES Upon notification of an emergency situation at Palisades, Big Rock Point or another nuclear utility the On-Shift System Power Controller shall notify personnel as designated in Section 5.0 of this procedure using Appendix G, Augmentation List.

GEN-3-TP01

CONSUMERS GENERAL OFFICE PROC NO GEN-3 POWER EMERGENCY PLANNING PAGE 2 0F 8 COMPANY PROCEDURE REV 2 ON-SHIFT SYSTEM POWER CONTROLLER 5.O REQUIREME.YfS 5.1 ACTIONS (UNUSUAL EVENT AT PALISADES OR BIG ROCK POINT)

a. Obtain all of the information required on Attachment I from the affected plant.

b.

Notify the On-Call Director and supply the information contained on Attachment 1.

l

1. If the On-Call Director cannot be reached by telephone, use the paging system by dialin give the following message after hearing the beep tone: "Mr , please call the Consumers Power Company Power Control Center immediately at 1
2. If the individual on call has not been contacted within fifteen (15) minutes, notify one of the alternates.

l l

NOTE: It is the responsibility of the On-Call Director to notify the Vice President - Nuclear Operations or his alternate if necessary.

. c. Notify the affected plant that the On-Call Director has been notified.

l 5.2 ACTIONS (ALERT, SITE AREA EMERGENCY, GENERAL EMERGENCY AT PALISADES OR BIG ROCK POINT) l

a. Obtain all information required on Attachment I from the affected plant.

GEN-3-TP01

1 CONSUME 3S GENERAL OFFICE PROC.N0 GEN-3 POWER EMERGENCY PLANNING PAGE 3 0F 8 l COMPANY PROCEDURE REV 2 ON-SHIFT SYSTEM POWER CCNTROLLER

b. Notify the On-Call Director and supply the information contained 1 on Attachment 1.
1. If the On-Call Director cannot be reached by telephone, use the paging system by dialin a give the following message after hearing the beep tone: "Mr , please call the Consume Power Company Power Control Center immediately a '

l 2. If the individual on call has not been contacted within ten minutes, notify one of the alternates.

3. Notify the Site Emergency Director at the plant if the On-Call Director' cannot be notified.
c. Inform the Parnall Security Guard or receptionist nat an Alert, Site Area Emergency, or General Emergency has occurred.

Instruct that person to notify the on-call Building Services Supervisor.

d. Notify Senior Management as found in Appendix G, Augmentation List, and provide the information ou Attachment 1.

Primary, Vice President - Nuclear Operations Secondary, Vice President - Energy Supply Services Alternate, Executive Director - Nuclear Assurance Department Second Alternate, Executive Director - Planning, Training and Administration GEN-3-TP01

l CONSUMERS GENERAL OFFICE PROC NO GEN-3 POWER EMERGENCY PLANNING PAGE 4 0F 8 COMPANY PROCEDURE REV 2 ON-SHIFT SYSTEM POWER CONTROLLER

e. Notify one Emergency Planning Representative as found in Appendix G, Augmentation List, and provide information on Attachment 1.
f. Notify one Public Affairs Representative as found in Appendix G, Augmentation List, and provide information on Attachment 1.

l l

g. Notify one Radiological Advisor as found in Appendix G, Augmentation List, and provide information on Attachment 1.
h. Notify one Logistics / Communication Services Representative as found in Appendix G, Augmentation List, and provide infor=ation on Attachment 1.
i. Nocify the Control Rooms of the other nuclear plants and provide information on Attachment 1:
1. Big Rock Point Plant Hot Line or ,

/

2. Palisades Hot Line or 1 5.3 ACTIONS (MUTUAL ASSISTANCE AGREEMENT)
a. Obtain all information required on Attachment 2 from the affected utility.

GEN-3-TP01

CONSUMIRS GENERAL OFFICE PROC NO GEN-3 POWER EMERGENCY PLANNING PAGE 5 0F 8 COMPANY PROCEDURE REV 2 l

ON-SHIFT SYSTEM POWER CONTROLLER

b. Notify the On-Call Director and supply information from Attachment 2.
1. If the On-Call Control Center Director cannot e reached by l telephone, use the paging system by dialing n'd 1 .

give the following message after hearing the beep tone:

l "Mr , please call the Consumers Power Company Power l Control Center it: mediately a l

l

2. If the individual on call has not been contacted within fifteen (15) minutes, notify one of the alternates.

l l

GEN-3-TP01

1 l

CONSUMERS GENERAL OFFICE PROC NO GEN-3 POWER EMERGENCY PLANNING PAGE 6 0F 8 COMPANY PROCEDURE REV 2 ON-SHIFT SYSTEM POWER CONTROLLER ATTACHMENT 1 POWER CONTROL CHECKLIST Date: Plant: BRP PAL -

Time:

Drill: , Yes No Unusual Event Alert Site Area Emergency General Emergency Other Brief description of the event:

Notifications:

4 Available Name Time (Yes/No) Location and Telephone No i Forward copy of completed form to P B Loomis, P-26-408B.

GEN-3-TP01

& a CONSUMERS GENERAL OFFICE PROC No GEN-3 POWER EMERGENCY PLANNING PAGE 7 0F 8 COMPANY PROCEDURE REV 2 ON-SHIFT SYSTEM PCWER CONTROLLER ATTACIDfENT 1 (Continued)

Notifications (Continued):

Name Time (Yes/No) Location and Telephone No l

1.,

Forward copy of completed form to P B Loomis, P-26-408B.

GEN-3-TP01

  • 4 i

CONSUMERS GENERAL OFFICE PROC NO GEN-3

, POWER EMERGENCY PLANNING PAGE 8 0F 8 COMPANY PROCEDURE REV 2 ON-SHIFT SYSTEM POWER CONTROLLER

ATTACHMENT 2 MUTUAL ASSISTANCE REQUEST CHECKLIST Date:

. Time:

Drill: Yes No ,

Utility: Detroit Edison (Enrico Fermi 2)

Indiana & Michigan (D C Cook 1&2)

Toledo Edison (Davis Besse)

Cleveland Electric Illuminating (Perry) .

Caller Name/

Title:

/

  • Call-back Number

' Unusual Event Alert Site Area Emergency General Emergency 4

Description of Event:

i Material / Personnel Requested:

f On-Call Director Notified: Time:

,

  • Caller will be contacted by Consumers Power Company Director / Officer.

Forward copy of completed form to P B Loomis, P-26-408B.

GEN-3-TP01 m - - - _ _ , - , . . , . ..___,_...%. - -

,e-,_----,---,r,mm,-_. . _ - - . . . , , , _ , , , . . _wc., -

r-- ...,--rww.--,c,-~ q v.---, -..<_.------.y. ,,-.--r.-

GENERAL OFFICE EMERGENCY PLANNING PROC NO GORT-1 Revision 0 APPROVAL SL N Y TITLE: GENERAL OFFICE RESPONSE TEAM (GORT)

.m f

-,.:,{ L-f? - - - -

Sk7f46 'Date Quality Assurince Support - Concurrence i dM Wh$

Date eneral Office Emeriency Planning - Approval

,/

f" i-ub'h.c n ux< ///h / %, Y i Nuclear Operations DepartmentNpproval Date 1

i 1

APPROVAL

SUMMARY

l

{

CONSUMERS GENERAL OFFICE PROC NO GORT-1 l POWER EMERGENCY PLANNING PAGE 1 0F 5 COMPANY PROCEDURE REV 0 GENERAL OFFICE RESPONSE TEAM (GORT) 1.0 PURPOSE To describe and define the responsibility of the General Office Response Team (GORT) during an emergency situation at a Consumers Power Company nuclear facility.

2.0 ATTACKHEKIS 1

I 3.0 INITIAL CONDITIONS AND/OR REQUIREMENTS The plant must be at an Alert, Site Area Emergency or General Emergency before initiation of this procedure.

4.0 RESPONSIBILITIES Monitor the emergency, authorize non-Corporat'e support requested by the Site Emergency Director (SED), and mobilize Corporate response to assist in manning the Emergency Operations Facility (EOF).

5.0 REQUIREMENTS l

5.1 ACTIONS (UNUSUAL EVENT) 5.1.1 Director

a. Upen notification by Power Control, establish communication with the affected plant and provide all required assistance.

I Power Control ,

Palisades Big Rock Point GORT-1

CONSUMERS GENERAL OFFICE PROC NO GORT-1 POWER EMERGENCY PLANNING PAGE 2 0F 5 COMPANY PROCEDURE REV 0 GENERAL OFFICE RESPONSE TEAM (GORT)

b. Notify the Vice President - Nuclear Operations or his alternate as found in Appendix G, Augmentation List, of plant status and actions initiated.

5.2 ACTIVATION (ALERT) 5.2.1 Director

a. Report to Power Control and pick up the completed notification forms; then report to the GORT area,
b. Establish communication with the SED and determine:

- Extent of the emergency and mitigating actions taken.

- Whether notifications have been made.

- Whether the SED wishes to activate the EOF. If so, determine which support personnel are required and instruct the Emergency Planning Representative to mobilize personnel, i

i

c. Brief Senior Management on emergency status and requests for additional assistance from the SED.

5.2.2 Senior Management

a. Report to the GORT area,
b. If the Site Emergency Director requests outside assistance, instruct the Emergency Planning Representative to notify or request as

. required:

GORT-1

o.

CONSUMERS GENERAL OFFICE PROC NO GORT-1 POWER EMERGENCY PLANNING PAGE 3 0F 5 COMPANY PROCEDURE REV 0 GENERAL OFFICE RESPONSE TEAM (GORT)

1. Mutual assistance from The Detroit Edison Company, Toledo Edison Company, Clevaland Electric Illuminating Company or Indiana &

Michigan Electric Company.

2. Institute for Nuclear Power Operations (INPO).
3. Nuclear Safety Analysis Center (NSAC).
4. Atomic Industrial Forum (AIF).

5.2.3 Emergency Planning Representative

a. Report to the GORT area.
b. Provide resource assistance requested by Senior Management and/or

, the Director.

c. Ensure that additional support personnel requested to report to the GORT area or the EOF by the Director are mobilized. (Refer to Appendix G, Augmentation List for internal notifications, and Non-Company Support for external notifications.)

5.2.4 Radiological Advisor

a. Report to the CORT area,
b. Interpret and advise the Director of radiological conditions resulting from the emergency, if any.

5.2.5 Logistics

a. Report to the GORT area.

GORT-1

CONSUMERS GENERAL OFFICE PROC NO GORT-1 POWER EMERGENCY PLANNING PAGE 4 0F 5 COMPANY PROCEDURE REV 0 GENERAL OFFICE RESPONSE TEAM (GORT)

b. Ensure that the GORT area is properly sat up.
c. Ensure that all phone lines are functional.
d. Secure and set up additional supplies and equipment requested by the Director.

5.2.6 Public Affairs Representative

a. Report to the GORT area.
b. Prepare press releases, if required.
c. Upon approval by the Director send press releases to the GOIC.

5.3 ACTIVATION (SITE AREA EMERGENCY OR GENERAL EMERGENCY) 5.3.1 Director

a. If the emergency is classified as a Site Area Emergency or General Emergency when initially notified:

- Contact the SED and determine.the extent of the emergency and which support personnel are required at the EOF.

Report to the GORT area.

Brief Senior Management and GORT.

b. Instruct the Emergency Planning Representative to notify support personnel to supplement plant EOF staff, and Logistics to initiate I

GORT-1

CONSUMERS GENERAL OFFICE PROC NO GORT-1 POWER EMERGENCY PLANNING PAGE 5 0F 5 COMPANY PROCEDURE REV 0 GENERAL OFFICE RESPONSE TEAM (GORT) actions to activate the EOF and make flight arrangements for General Office EOF management personnel.

c. Report to the EOF, and assume the responsibilities of EOF Director.

5.3.2 Senior Management, Emergency Planning Reoresentative, Public Aff airs Representative & Radiological Advisor

a. If.the emergency is classified as a Site Area Emergency or General Emergency when initially notified, report to the GORT area.

NOTE: The Emergency Planning Representative should ensure 1) additional support personnel are mobilized to report to the EOF, and 2) computers for dose assessment are packaged and shipped to the EOF. (Refer to Appendix G.

Augmentation List for internal notifications, and Non-Company Support for' external notifications.)

b. Report to the EOF as instructed by the Director, and assume the following responsibilities:

Senior Management - Emergency Officer (EOF-1)

Emergency Planning Representative - Emergency Planning (EOF-9)

Public Affairs Representative - Public Affairs (EOF-8)

Radiological Advisor - Health Physics Support Team Leader (EOF-7) 5.3.3 Logistics

a. If the emergency is classified as a Site Area Emergency or General Emergency, when initially notified, report to the GORT area.
b. Initiate actions to activate the EOF.
c. Secure the CORT area and return all equipment to original locations.

GORT-1

GENERAL OFFICE EMERGENCY PLANNING PROC NO EOF-1 Revision 2 APPROVAL SLTfARY TITLE: EMERGENCY OFFICER

.: w; :~ u -

ark Quality Assdrance Support - Concurrence ' Date

~

/M $/ fd General 6ffice Emergency Planning - Approval ITate

^

/ As MLW Y z?

Nuclear Operations Department - Approval / Date APPROVAL SLMfARY i

- ..- - - , - , - , - - . . - . = -.--- - - . - - - . - - . . . , - - . , . - , - - . . . . - . . . , , - - - - - ,

CONSUMERS GENERAL OFFICE PROC NO EOF-1 POWER EMERGENCY PLANNING PAGE 10F 6 COMPANY PROCEDURE REV 2 EMERGENCY OFFICER 1.0 PURPOSE The purpose of this procedure is to describe and define the responsibil-ities of the Emergency Officer during an emergency situation at a Consumers Power Company nuclear facility.

2.0 ATTACHMENTS None 3.0 INITIAL CONDITIONS AND/OR REQUIREMENTS The plant has declared a Site Area Emergency or General Emergency. The EOF may be activated at the Alert stage at the discretion of the Site Emergency Director (SED).

4.0 RESPONSIBILITIES The position of the Emergency Officer is held by:

a. The Vice President - Nuclear Operations, or
b. By one of the following designated alternates:
  • Vice President - Energy Supply Services
  • Executive Director - Nuclear Assurance Department Executive Director - Planning, Training & Administration PR0685-0230A-TP13-NC05 h

, - . . . , - _ , . m.- _ . . _ . ., . , _ _ , . , - - . - . , - ___,-,,y.,. - ..,--._%._. - _ _,.__e., , _ . - . . . . , . - _,

CONSUMERS GENERAL OFFICE PROC NO EOF-1 POWER EMERGENCY PLANNING PAGE 2 0F 6 COMPANY PROCEDURE REV 2 EMERGENCY OFFICER The Emergency Officer assures that the full resources of Consumers Power Company are made available to assist the Site Emergency Director and EOF Director in minimizing the effects of the emergency on plant personnel and on the public.

Other responsibilities of the Emergency Officer include:

  • Overall Executive Management of Consumers Power Company response to the emergency.
  • Briefing and maintaining contact with Consumers Power Company Corporate Management on the emergency situation.
  • Acting as the Corporate contact for executive level Federal, State and industry personnel.
  • Authorizing expenditures.
  • Managing initial reentry and recovery actions.

5.0 REQUIREMENTS 5.1 ACTIVATION Upon arrival at the Emergency Operations Facility, sign in on the " EOF Emergency Response Staff" status board and review the extent of the emergency situation with the EOF Director,

a. Act as a resource person for the EOF Director who has overall respon-sibility for the functional operation of the EOF.

PR0685-0230A-TP13-TP01

. s CONSUMERS GENERAL OFFICE PROC NO EOF-1 POWER EMERGENCY PLANNING PAGE 3 0F 6 COMPANY PROCEDURE REV 2 9

EMERGENCY OFFICER

b. Resolve any conflicts between the Site Emergency Director and the EOF Director,
c. Perform responsibilities as outlined in Section 4.0 as required.
d. Advise Senior Consumers Power Company Management of the status of the situation. <
e. In consultation with the Site Emergency Director and the EOF Director, determine if the following outside assistance is required.

Instruct the Communications Support Team to obtain the assistance.

1. Members of site emergency teams from the other Consumers Power Company nuclear plant
2. Logistical support from the Region
3. Equipment, tools, radiation detection equipment, anticon-tamination clothing and other contamination control and protection equipment available from the other Company nuclear plant
4. Members of the Travel Repair Crew and their equipment and trailers
5. US Department of Energy (DOE) Radiological Assistance Teams
6. ___ Assistance from The Detroit Edison Company, Toledo Edison Company, Cleveland Electric Illuminating Company or Indiana

& Michigan Electric Company (See Appendix A for agreements.)

PR0685-0230A-TP13-TP01

a o CONSUMERS GENERAL OFFICE PROC NO EOF-1 POWER EMERGENCY PLANNING PAGE 4 0F 6 COMPANY PROCEDURE REV 2

, EMERGENCY OFFICER

7. Institute for Nuclear Power Operations (INFO) (See Appendix B for agreement.)
8. Nuclear Safety Analysis Center (NSAC)
9. Atomic Industrial Forum (AIF)
  • 10. Bechtel Associates
11. Combustion Engineering
12. General Electric
13. Babcock & Wilcox
14. Westinghouse 5.2 OPERATIONAL The Emergency Officer shall function as needed to perform the responsi-bilities outlined in Section 4.0. j 5.3 REENTRY AND RECOVERY ACTIONS NOTE: The Emergency Officer becomes the Recovery Manager until the long-term recovery organization is established and operational at the site. The l Site Emergency Director then assumes responsibility as Recovery Manager.

The EOF can then be deactivated.

PR0685-0230A-TP13-TP01

CONSUMERS GENERAL OFFICE PROC NO EOF-1 POWER -

EMERGENCY PLANNING PAGE 5 0F 6 COMPANY PROCEDURE REV 2 EMERGENCY OFFICER 5.3.1 Initial Conditions and Actions When the following conditions are met, reentry and recovery actions may be initiated:

a. The release of radioactive materials to the environment l is under control or has ceased.
b. Fire, flood, etc, as appropriate, is under control or has ceased.
c. ___ In-plant radiation levels are stable or decreasing,
d. The reactor and associated systems are in a stable, safe condition.
e. The SED, EOF Director, NRC and State agree to terminate.

5.3.2 Termination

a. Instruct the Communicator to inform all agencies involved' that the emergency is terminated and recovery operations are commencing.
b. Instruct the EOF Director and Site Emergency Director to

{ confer and determine: (1) what support the site requires from the EOF, (2) a schedule for the SED to assume the role of Recovery Manager, and (3) any other resources or guidance required for long-term recovery.

PR0685-0230A-TP13-NC05

.-_ -_.,, -___-,,_ , _- _--. ., - ,, _.w , . . , - , _ ,._-.._-,.._r,. ,--._-_,,,m,. . . . . , . . . . , . - __.,,.___,_rm m,m._,, -- - . . , , . , .

CONSUMERS GENERAL OFFICE PROC NO EOF-1 POWER EMERGENCY PLANNING PAGE 6 0F 6 COMPANY PROCEDURE RE7 2 .

EMERGENCY OFFICER

c. Instruct the EOF Director to assemble an Interim Recovery Staff from the EOF personnel, if required.
d. Continue to maintain contacts with Senior Consumers Power Company Management and non-Consumers Power Company

, agencies as appropriate.

e. At the agreement of the Site Emergency Director and EOF Director, the Site Emergency Director assumes responsibility as long-term Recovery Manager and the EOF is to be deactivated.
f. Instruct the EOF Director to deactivate the Emergency Operations Facility.

A i

l t

PR0685-0230A-TP13-NC05

GENERAL OFFICE EMERGENCY PLANNING PROC NO EOF-2 Revision 2 APPROVAL

SUMMARY

TITLE: EMERGENCY OPERATIONS FACILITY DIRECTOR Quality Asstrfance Support - Concurrence

.6

$ff-ff'b

'Date IM l/ Ed d

~ eneral 6f fice Eniergency Planning - Approval Dite 0 /

- /,. ,4

~/i /

/ffs d & &C.&p$ // Q thsO Nuclear Operations Department - App.roval Date i

i a

i .

i 1

APPROVAL SLWARY

CONSUMERS GENERAL OFFICE PROC NO EOF-2

. POWER EMERGENCY PLANNING PAGE 1 0F 5 COMPANY PROCEDURE REV 2 -

EMERGENCY OPERATIONS FACILITY DIRECTOR 1.0 PURPOSE The purpose of this procedure is to describe and define the responsibili-ties of the Emergency Operations Facility (EOF) Director during an emergency situation at a Consumers Power Company nuclear facility.

2.0 ATTACHMENTS None 3.0 INITIAL CONDITIONS AND/OR REQUIREMENTS The plant must be at a Site Area Emergency or General Emergency before

- initiation of this procedure. The EOF may be activated at the Alert l

stage at the discretion of the Site Emergency Director (SED).

4.0 RESPONSIBILITIES The Emergency Operations Facility Director is responsible for the following:

a. Managing overall CP Co emergency response
b. Ensuring coordination of radiological and environmental assessment

! c. Providing protective action recommendations, and

d. Coordinating emergency response activities with Federal and State agencies i

f 1

1 PR0685-0230B-TP13-TP01

CONSUMERS GENERAL OFFICE PROC NO EOF-2 POWER EMERGENCY PLANNING PAGE 2 0F 5 COMPANY PROCEDURE REV 2 EMERGENCY OPERATIONS FACILITY DIRECTOR The Emergency Operations Facility Director is responsible for the opera-tion of the Emergency Operations Facility at all times unless formally relieved of his duties by the Emergency Officer.

5.0 REQUIREMENTS 5.1 ACTIVATION Upon arrival at the EOF, the Emergency Operations Facility Director should initiate the following:

a. Sign in on the " EOF Emergency Response Staff" status board.
b. Establish communications with Site Emergency Director at the affected

. plant.

Determine extent of emergency situation and what actions have been taken to mitigate the emergency.

c. Assign Team Leaders to direct actions of support team personnel.
d. Assemble the Emergency Officer, EOF Administrator and Support Team Leaders and:
1. Conduct a briefing on the emergency situation, plant status and actions taken by the plant to mitigate the emergency.
2. Assure that a sufficient support staff has been or will be summoned to the Emergency Operations Facility.

PR0685-0230B-TP13-TP01

CONSUMERS GENERAL OFFICE PROC NO EOF-2 POWER EMERGENCY PLANNING PAGE 3 0F S COMPANY PROCEDURE REV 2 EMERGENCY OPERATIONS FACILITY DIRECTOR

3. Instruct the Support Team Leaders to assist the plant as teams assemble; however, responsibility will remain at the Technical Support Center (TSC) until authority is transferred to the Emergency Operations Facility.
e. When the appropriate teams are ready and the EOF is judged to be operational request the SED to transfer authority to the EOF.
f. When authority has been transferred to the EOF:
1. Announce to the EOF support staff that the Emergency Operations Facility is operational.
2. Instruct the SED to notify all agencies which the Technical Support Center is currently in communication with that authority has been transferred to the Emergency Operations Facility.

5.2 OPERATIONAL

a. Maintain a line of communication to the Site Emergency Director and brief him frequently of the actions at the Emergency Operations Facility and actions being undertaken by offsite authoritics.
b. Maintain communications with offsite authorities, particularly the State, brief them on actions undertaken at the plant and EOF, and determine action being taken offsite.
c. Provide protective action recommendations to offsite authoricies:

I PR0685-0230B-TP13-TP01

i l

CONSUMERS- GENERAL OFFICE PROC NO E0F-2 POWER EMERGENCY PLANNING PAGE 4 0F 5 COMPANY PROCEDURE REV 2 EMERGENCY OPERATIONS FACILITY DIRECTOR

1. Review and approve, as deemed appropriate, protective action recommendations generated by the Health Physics Support Team.
2. Recommendations shall be personally provided by the EOF Director.
d. Perform emergency classification in accordance with Plant Emergency Plan Implementing Procedures.
1. Upgrade to General Emergency classification shall be personally provided to the State and NRC. A minimum protective action recommendation of shelter from zero to two miles concentric and two to five miles downwind for the affected, and two adjacent sectors must be provided with notification of General Emergency.

Follow-up recommendations should be provided as quickly as possible.

2. All downgrades in emergency classification must be coordinated with the SED, State and NRC.
e. In consultation with the Communication Support Team Leader:
1. Review and approve all information transmitted to offsite autho-rities via the Notification Form. Review may be delegated to an -

assistant.

2. Verify with the Communication Support Team Leader that all outside assistance requested by the Site Emergency Director has been arranged.

PR0685-0230B-TP13-TP01

- , . - , , . --e.- ,,..y--w,,- - --m, , , .%a_,,--

%.., .,_-.r- -y --.,cy- $- ,--,%-_.,---em--w- ,..,,,w%, w ew r w-.v-n-e -rm,---------

l CONSUMERS GENERAL OFFICE PROC NO EOF-2 i POWER EMERGENCY PLANNING PAGE 5 0F 5 COMPANY PROCEDURE REV 2 i

EMERGENCY OPERATIONS FACILITY DIRECTOR

f. Review plant status and the current mitigating actions with the Reactor Engineering / Accident Analysis Support Team and the Plant Support Engineering Support Team. Provide recommendations to the Technical Support Center as appropriate.
g. Review and approve all information to be sent to the Joint Public Information Center by the EOF Public Affairs Representative.

Approval signifies that the information is correct and current and is authorized to be released to the public. This information will be ,

used as the basis for press releases jointly issued by State, local and CP Co representatives.

Assure that the Public Affairs Representative has obtained a technical review from an appropriate Support Team Leader. This review should be documented by the respective Support Team Leader who must sign off on the information.

h. Provide all other assistance requested by the Site Emergency Director or Emergency Officer.

5.3 DEACTIVATION When the situation warrants, the Emergency Operations Facility will be

{ deactivated. Instruct the Support Team Leaders to close out all files

and secure all forms, records and logs as appropriate.

i 1

1 l

1 l'

i PR0685-0230B-TP13-TP01 I

. e GENERAL OFFICE EMERGENCY PLANNING PROC'NO EOF-3 Revision 2 APPROVAL

SUMMARY

t 4

TITLE: EMERGENCY OPERATIONS FACILITY ADMINISTRATOR 1

i

= 9/ . 77 l _ A- fcY7f66E Quality Assurance Support - Concurrence 'Date

- ^ lM f i $

4 eneral Office Emelgency Planning - Approval / Date l /

/

/ 4 &?C4.-t C~ l Nuclear Operations Department ' Approval / Date i

1 l

APPROVAL

SUMMARY

. _ . . . - - - . _ . _ . . . . . _ _ _ _ - - . _ _ _ _ _ . _ - . _ . ~ _ _ . - - . . . _ _ _ _ _ . _ _ _ _ _ . . . . _ _ _-_ . _ ~ . _ . _ . _ ,

r CONSUMERS GENERAL OFFICE PROC NO EOF-3 POWER EMERGENCY PLANNING PAGE 1 0F 3 COMPANY PROCEDURE REV 2 EMERGENCY OPERATIONS FACILITY ADMINISTRATOR 1.0 PURPOSE The purpose of this procedure is to describe and define the responsibili-ties of the Emergency Operations Facility (EOF) Administrator during an i emergency situation at c Consumers Power Company nuclear facility.

I 2.0 ATTACHMENTS None r

i 3.0 INITIAL CONDITIONS AND/OR REQUIREMENTS The plant must be at Alert, Site Area Emergency or General Emergency before initiation of this procedure. The EOF may be activated at the Alert stage at the discretion of the Site Emergency Director (SED). ,

4.0 RESPONSIBILITIES The Emergency Operations Facility Administrator is responsible for the following:

4

a. Managing the EOF and directing actions of plant personnel prior to arrival of the EOF Director, and
b. Coordinating the administrative functions and operation of the Emergency Operations Facility 0

PR0685-0230C-TP13-TP01 ,

I l

  • T- - --- -.. a--.- + -S--- . ,y, .-_m_7# __

.--.w.w._.,,,c-y,w 9 9-7-- ,,gy.,m,,m.,-ywp-,p.,w-----pww. ,f - 9g,,, i,+ww- e g,,

CONSUMERS GENERAL OFFICE PROC NO EOF-3 POWER EMERGENCY PLANNING PAGE 2 0F 3 COMPANY PROCEDURE' REV 2 EMERGENCY OPERATIONS FACILITY ADMINISTRATOR 5.0 REQUIREMENTS 5.1 ACTIVATION Upon arrival at the EOF, the Emergency Operations Facility Administrator should initiate the following actions:

a. Sign in on the " EOF Emergency Response Staff" status board.
b. Determine the extent of the emergency with the Site Emergency Director.

i

c. Verify that personnel have adequate equipment and supplie,s.
d. Coordinate with Logistics upon their arrival if additional equipment or supplies are needed.
e. Establish security to restrict access to the E=crgency Operaticas

-Facility.

f. Verify that support teams have established communication with coun-terparts in the Technical Support Center (TSC).
g. Conduct periodic briefings of EOF staff or make announcements on emergency status,
h. Upon arrival of the EOF Director, brief him on status of the emer-gency and status of EOF activation.
i. Notify the EOF Director as suppers Team Leaders indicate a ready starns on the " EOF Emergency Response Staff" status board.

PR0685-0230C-TP13-TP01 gr w. , #w., , y ,- -

- _ - - --v,-- . - - ,

CONSUMERS GENERAL OFFICE PROC NO EOF-3 POWER EMERGENCY PLANNING PAGE 3 0F 3 COMPANY PROCEDURE REV 2 EMERGENCY OPERATIONS FACILITY ADMINISTRATOR 5.2 OPERATIONAL

a. Throughout the emergency, ensure that:
1. The individual support teams have communications with their counterparts in the Technical Support Center and are carry-ing out their designated duties.
2. Status boards are being updated.
3. Notifications are being made and logged and updates sched-uled by the Communications Support Team.
b. Coordinate scheduling of work shifts to man the Emergency Operations Facility on a 24-hour basis.
c. Coordinate with Logistics to set up food services and lodging for the support staff.
d. Assure that the needs of the Federal and State government personnel located in the Emergency Operations Facility are being addressed.

5.3 DEACTIVATION When the situation warrants, the Emergency Operations Facility will be deactivated. Verify that the Support Team Leaders have closed out all files and secured all forms, records and logs as appropriate.

  • a - gihare emuss- V ,S-.

PR0685-0230C-TP13-TP01

GENERAL OFFICE EMERGENCY PLANNING PROC NO IOF-4 Revision 2 APPROVAL

SUMMARY

TITLE: COMMUNICATION SUPPORT TEAM .

1

~ ~ a) -

Quality Assurance Support - Concurrence JA5% Date

/ cd - .

[ 24 /

eneral Office Emergency Planning - Approval / D' ate

/- /

- b' MW)k f' hs Nuclear Operations Department M pproval / Date N

i APPROVAL

SUMMARY

l -

CONSUMERS GENERAL OFFICE PROC NO EOF-4 POWER EMERGENCY PLANNING PAGE 1 0F 10 COMPANY PROCEDURE REV 2 COMMUNICATION SUPPORT TEAM 1.0 PURPOSE The purpose of this procedure is to describe and define the responsibil-ities of the Communication Support Team in the Emergency Operations Facility (EOF) during an emergency situation at a Consumers Power Company nuclear facility.

2.0 ATTACHMENTS Attachment 1, " EOF Communication Support Team Facilities and Equipment Checklist" l

Attachment 2, " Notification Form" I

Attachment 3. " Additional Emergency Support Request Checklist" 3.0 INITIAL CONDITIONS AND/OR REQUIREMENTS The plant must be at Alert, Site Area Emergency or General Emergency before initiation of this procedure. The EOF may be activated at the l

Alert stage at the discretion of the Site Emergency Director (SED).

4.0 RESPONSIBILITIES The Communication Support Team Leader acts as the official communicator between the Emergency Operations Facility, the affected Plant and outside organizations. He makes and records all official communications from the Emergency Operations Facility. This does not preclude support teams communicating to their counterparts at the Plant on technical matters.

EOF-4

CONSUMERS GENERAL OFFICE PROC NO EOF-4 POWER EMERGENCY PLANNING PAGE 2 0F 10 COMPANY PROCEDURE REV 2 COMMUNICATION SUPPORT TEAM 5.0 REQUIREMENTS 5.1 ACTIVATION 5.1.1 Primary Staffing Upon arrival at the EOF, the Communication 3upport Team members should initiate the following actions:

a. Verify that the facilities and equipment listed in the checklist (Attachment 1) are available and functional,
b. Establish and maintain a communication link to the Technical Support Center Communicator (see Appendix G for telephone numbers) and. review:
1. Plant status
2. All organizations contacted and obtain telephone numbers used to contact each organization
3. All actions initiated by the organizations contacted
4. Schedule to update the appropriate organizations i 5. Any other information pertinent to facilitating transfer of authority
c. Establish communications with those agencies listed in Appendix G, Mandatory Telephone Notifications (if available use telephone numbers obtained from the TSC). Once the EOF assumes responsibility, EOF-4
  • t CONSUMERS GENERAL OFFICE PROC NO EOF-4 POWER EMERGENCY PLANNING PAGE 3 0F 10 COMPANY PROCEDURE REV 2 COMMUNICATION SUPPORT TEAM provide EOF generated information on the Notification Form (Attachment 2) to those agencies. l Note: The State will provide direction for State and local notifications.
d. Perform notifications as directed by the Site Emergency Director and maintain status boards.

1 5.1.2 Secondary Staffing i

Upon arrival at the EOF, the Communication Support Team Leader should 4

initiate the following actions:

a. Sign in on the " EOF Emergency Response Staff" status board.
b. Determine the extent of the emergency and what, if any, initial actions are required.
c. Assign members of the Communication Support Team to complete the Notification Form generated at the EOF, and to update status boards EOF-2, EOF-3, EOF-4, and EOF-5.
d. Determine when the following responsibilities can be adequately addressed, and notify the EOF Administrator that the Communication Support Team is ready to assume responsibility for communication support as soon as:

, 1. Sufficient Communication Support Team members have arrived.

2. All work assignments have been completed.
3. Sufficient equipment has been verified available and func-tional.

EOF-4

CONSUMERS GENERAL OFFICE , PROC NO EOF-4 POWER EMERGENCY PLANNING PAGE 4 0F 10 COMPANY PROCEDURE REV 2 COMMUNICATION SUPFORT TEAM

4. An operable communication line between the Emergency Operations Facility Communication Support Team and the Technical Support Center Communication group has been established.

S. An operable communication link is available to those agen-cies listed in Appendix G, Mandatory Telephone Notifications.

i 4 e. Indicate on the " EOF Emergency Response Staff" status board that the Communication Support Team is ready.

1

, f. As soon as the EOF Director announces that the Emergency Operations Facility is operational, notify the following that the EOF is operational and is assuming responsibility.

1. Plant Technical Support Center l
2. All organizations in Appendix G. Mandatory Telephone Notifications and Non-Company Support that have been contacted by the Technical Support Center.
3. Any other organizations as specified by the Technical Support Center Communicator. ,

5.2 OPERATIONAL

a. For incoming messages, ensure that the Incoming / Outgoing Message

. Forms are being completed by the Plant Communicator and . distributed to the EOF Director, Emergency Officer and appropriate Support Team Leaders.

EOF-4

. . = _ _ _ - . . .. - _ _ . - . . - . _- - - . - -

CONSUMERS GENERAL OFFICE PROC NO EOF-4 POWER EMERGENCY PLANNING '

PAGE 5 0F 10 COMPANY PROCEDURE REV 2 COMMUNICATION SUPPORT TEAM

b. Ensure that a log of incoming messages is being maintained,
c. Ensure that a log of outgoing messages is being maintained.
d. Establish an update schedule to provide information to those agencies listed in Appendix G, Mandatory Telephone Notifications.
1. Messages will consist of items on the Notification Form as available and as changes of status occur.
2. Ensure that the EOF Director has approved the Notification Form prior to release.
3. Ensure that a new Notification Form is used for each update and that the message number, date and time are updated.

NOTE: The EOF Director is responsible for personally notifying the State and NRC of upgrade to a General Emergency classification along with appropriate protective action recommendations,

e. If additional emergency support is required, contact the appropriate group listed in Appendix G Non-Company Support, and provide the information listed in Attachment 3.

l l

f. Continue to inform the EOF Director of actions being taken by the EOF Communication Support Team.
g. Continue to make any communications as directed by the EOF Director or the Emergency Officer.

EOF-4 l

l

CONSUMERS GENERAL OFFICE PROC NO EOF-4 POWER EMERGENCY PLANNING PAGE 6 0F 10 COMPANY PROCEDURE REV 2 COMMUNICATION SUPPORT TEAM

h. If the estimated duration of the incident warrants, arrange a relief rotation schedule with the EOF Administrator.
i. Provide support as requested by the EOF Director and/or Emergency Officer.

5.3 DEACTIVATION When the situation warrants, the EOF will be deactivated. Agencies contacted during the emergency should be informed that the EOF is deactivated. Close out all communications as directed by the EOF Director or Emergency Officer. Close out all files and secure all forms, records and logs as appropriate.

O EOF-4

CONSUMIRS GENERAL OFFICE PROC NO EOF-4 POWER EMERGENCY PLANNING PAGE 7 0F 10 COMPAFY PROCEDURE REV 2 .

COMMUNICATION SUPPORT TEAM ATTACEMENT 1 EOF COMMUNICATION SUPPORT TEAM FACILITIES AND EQUIPMENT CHECKLIST Yes No

1. Pencils and paper available?
2. Incoming / outgoing message forms available?
3. Telephone directories (Company / local) available?
4. Status boards EOF-2, EOF-3, EOF-4 and EOF-5 available?
5. Plant Communicator hot line to the Plant Technical Support Cancer available?

, 6. EOF Director hot line to tLe Plant Technical Support Center available?

7. Hot lines available?
8. Are the telephone extensions listed in the Emergency Telephone Numbers section for the Emergency Officer, EOF Director, EOF Administrator and EOF Communica-tions Support Team available?

EOF-4

CONSUMERS GENERAL OFFICE PROC NO EOF-4 POWER EMERGENCY PLANNING PAGE 8 0F 10 COMPANY PRCCEDURE REV 2 COMMUNICATION SUPPORT TEAM ATTACHMENT 2 3Itt: fM: WPIDE:

flOI: CailE NW_ IE _ SIBi_ [7_. CE3 M TES 15_ !5 4t_ A OtlL' (LC X)

1. !3: C:UnfV_ (CC) WlO IM:

Siti(_

  • C_

L plt! Wif/2.If LA. .T5tAE *MG

  • L CLASS 7 Dr2EC (Ntt X): A. 7J5UL CDf,, I. EL[If_ C. SITI 9tta. O.E(it.

[. TR:5 CLiisif!GTIS X:L40 BY CPC2 Ali IM: DATC

1. ESCIIPi!3 Of CO!/IETIATIE C3CIf!3:
5. PIWe5I5 (CC X): 1. 5!AILI_ L [itui!4_ C. X450Lli!N_3. lIRINRf!M_
i. PUIII CDEDCY ESP 3E E!!35 JeDur:

A JTSI!I ASSISIMI PfCCJ5LY ICEliG: YES $_ L.f:E C. PSLI2 8. 90uLMt

[. 45PITAL f. stil

8. SITE EAC3f13: YE5_ W L2:!U_

N. 35III 81 f[PS 8!5PtiCE2:Y[5_ W_ f:.T

!. YTSITE E 1L95 3!!PRILt2: YU_4.IX

7. ICIA5E INr3191:3:

A PSIDilt f3 ERDSta YC5_ W_ I. ACia ICIASC: YG. g_ C. IM 7 RD.LE:

L AIF00tNE_ [. IATCit0M. f. 5sifACI SP!LL. E. PO!DfM fEIAE 3Alf!3, di;tt 2.3

8. SC213EICL MIA:

L STREIUiY CLA55: 8

5. 'IS J SPED, Pr!i: 1.8 C. li!$ !!t[Cila, CESICIS fl3t: 6.

B. 234:4 SCCf3 (5): 5 SE $31 Pett:P! tai!3:

1. iEIJLD6ICL ttLE 311:

A CII?AfD_ S$3t2 l. CfTLDI POINTS & (I6ht: .00 "IiGS C. TOLE 3A5 atDSC t#II, C:/Stt: .303[+00 6. M19Et MiiY JG): .000 C. [3!3Lui !.IIt ICLIASE thft, CItstt: .000[ 00 f. P9ti:C14 [5, CI/SE :

15. CALCIAi[3 Xft:it :CSC: 815 WI

.500 E 2.300 P.I 5.000 E !O.C 0 E A W4LI IOGY SWA OCSI is!C,501.18 4.1. A.:. A. 3. A.1.

l. ALI llMV 5WA 305[, MCI I.1. 1.L 3.3. I. t.

C. DRO fM 0 00E iAf[, MCW C.t. C.2. C.I. C.4

5. Gill TMCIS 30E, r90t 8.t . 3.2. B.I. L t.

C. $[CT:s! arrt:fD t.t. C.Z. C. I. [. 9.

3. ACCITI:Mt. 314
11. IIES SsfuCY 3!I: 8!SIMI sit [ 131eWY ,,,,,,,,."! __ "I _.,. RI
4. DICLI IOCY SW# CCSC IPi[. "90VW 4.1. A.L 4. I. 4. '.

I. Ch L3 !+I0:8 OCSI I#it, atCted t.t. 8.Z. i.L 3.t. ,

C. !I;*:25 Arrt:'D C.t. C.2. C.L .4 j 1

3. 4GCIT :WL 3f A tL PfGi[!!.T AC!I:n E 7rtct:2: trTIC'O etv5(:!:s! vrf ![2 ai[45E:!:IS i S. et  !

I. :pJICI Shtfli 4 i

C. [EAi!3 2.113:Sil:3ili 3 C. CyE!Wi!3 Catti, T:CO,Ji[Iyat i

f. Sing
11. [5??Att 7 ::nimidi[3 40 (a5 4.1itulLAI) A. :s *J9I G ft) _,,,_1. 35 it >i: ":Ji>

C. Yrilit t!3 P.R[s)

19. Eft:liAL lCasi!3 i

EOF-4

.= . _ - - -

CONSUMERS GENERAL OFFICE PROC NO EOF-4 POWER EMERGENCY PLANNING PAGE 9 0F 10 COMPANY PROCEDURE REV 2 COMMUNICATION SUPPORT TEAM ATTACHMENT 3 ADDITIONAL EMERGENCY SUPPORT REQUEST CHECKLIST

1. Date Time Authorized
2. Name and title of person calling
3. Nature of emergency
4. Plant Location
5. When the help is needed
6. Where the help is wanted
7. Work to be done
8. Where the help should report s
9. The name and title of person to report to
10. Number of personnel requested

, 11. Classification of personnel

12. Estimated time duration for additional support
13. Equipment needed:

1 EOF-4

CONSUMERS GENERAL OFFICE PROC NO EOF-4 POWER EMERGENCY PLANNING PAGE 10 0F 10 COMPANY PROCEDURE REV 2 COMMUNICATION SUPPORT TEAM l

ATTACHMENT 3 (Continued) 14 Material needed.

15. Services needed:
16. Other information:

EOF-4 i

GENERAL OFFICE EMERGENCY PLANNING PROC NO EOF-5 Revision 2 APPROVAL SLMfARY TITLE: REACTOR ENGINEERING / ACCIDENT ANALYSIS SUPPORT TEAM c'W $zW- --

Quality Assurance Support - Concurrence YfEG Date

/W General OfFfice Eli!'ergency Planning - Approval

/

S Date S

c nd

// -

Nuclear Operations Department - Approval scM Date l

l APPROVAL SLWiARY I

CONSUMERS GENERAL OFFICE PROC NO EOF-5 POWER EMERGENCY PLANNING PAGE 1 0F S COMPANY PROCEDURE REV 2 REACTOR ENGINEERING / ACCIDENT ANALYSIS SUPPORT TEAM 1.0 PURPOSE The purpose of this procedure is to describe and define the responsibili-ties of the Reactor Engineering / Accident Analysis Support Team in the Emergency Operations Facility (EOF) during an emergency situation at a Consumers Power Company nuclear facility.

2.0 ATTACHMENTS Attachment 1, " Reactor Engineering / Accident Analysis Support Team Facili-ties and Equipment Checklist" 3.0 INITIAL CONDITIONS AND/OR REQUIREMENTS i The plant must be at Alert, Site Area Emergency or General Emergency before initiation of this procedure. The EOF may be activated at the Alert stage at the discretion of the Site Emergency Director (SED).

4.0 RESPONSIBILITIES The Reactor Engineering / Accident Analysis Support Team Leader is respon-sible for providing the following:

a. Engineering support to the EOF HP Support Team necessary in per-forming source term calculations
b. Reactor engineering and accident analysis interpretation for the Emergency Operations Facility Director
c. Technical analysis for the affected plant as requested l

l PR0184-0004A-RS02-TP01

  1. 0 CONSUMERS GENERAL OFFICE PROC NO EOF-5 POWER EMERGENCY PLANNING PACE 2 0F 5 COMPANY PROCEDURE REV 2 REACTOR ENGINEERING / ACCIDENT ANALYSIS SUPPORT TEAM NOTE: The roles of the Reactor Engineering / Accident Analysis Support Team and Plant Support Engineering Support Team may be combined at the discretion of the EOF Director.

5.0 REQUIREMENTS 5.1 ACTIVATION Upon arrival at the EOF, the Reactor Engineer / Accident Analysis Support Team Leader should initiate the following actions:

a. Sign in on the " EOF Emergency Response Staff" status board.
b. Verify that the equipment, supplies and communication channels listed in Attachment 1 are available and functional for the support team.
c. Establish communications with counterpart group in Technical Support Center (see Emergency Telephone Numbers section for telephone number) and:
1. Review of plant status and critical reactor parameters.
2. ___ Review of recommendations to prevent and/or limit core damage.
3. Actions initiated by the plant to bring it to a safe shutdown.
d. Indicate on the " EOF Emergency Response Staff" status board that the Reactor Engineering / Accident Analysis Support Team is ready.

PR0184-0004A-RS02-TP01

-wx- , .--c,n- x--,,m.wn-nw----- e-- -- - -v -- - - -,- - - - - -- - - -

. . 1 CONSUMERS .

GENERAL OFFICE PROC NO EOF-5 POWER EMERGENCY PLANNING PAGE 3 0F 5 l COMPANY PROCEDURE REV 2 ,

REACTOR ENGINEERING / ACCIDENT ANALYSIS SUPPORT TEAM

e. Brief the EOF Administrator on changes in plant status and mitigating actions as they occur until the EOF Director arrives.
f. As soon as the EOF Director announces that the Emergency Operations Facility is operational, assume responsibility for providing 1) engi-neering support to the E0F HP Support Team, 2) reactor engineering /acci-dent analysis interpretation for the EOF Director, and 3) support for the plant as requested.

5.2 OPERATIONAL

a. Provide engineering support to the EOF HP Support Team as necessary for source term calculations.
b. Continue to review with the Technical Support Center Reactor Engineering group the accident sequence and what Control Room Operator actions are being taken to mitigate the emergency.
c. Provide the Emergency Operations Facility Director with any pertinent changes in plant status or recommendations.
d. Verify that the status board EOF-6 is being maintained with correct and current plant information.
e. Provide the EOF Director with a summary of all plant actions as they pertain to reactor engineering / accident analysis.
f. If the estimated duration of the incident warrants, arrange with the EOF Administrator to have a relief support team assembled.

PR0184-0004A-RS02-TP01

. o CONSUMERS GENERAL OFFICE PROC NO EOF-5 POWER EMERGENCY PIAVNING PAGE 4 0F 5 COMPANY PROCEDURE REV 2 REACTOR ENGINEERING / ACCIDENT ANALYSIS SUPPORT TEAM 5.3 DEACTIVATION k' hen the situation warrants, the EOF will be deactivated. Close out all communications as directed by the EOF Director or Emergency officer.

Close out all files and secure all forms, records and logs as appropriate.

4 PR0184-0004A-RS02-TP01

CONSUMERS GENERAL OFFICE PROC NO EOF-5 POWER EMERGENCY PLANNING PAGE 5 0F 5 COMPANY PROCEDURE REV 2 REACTOR ENGINEERING / ACCIDENT ANALYSIS SUPPORT TEAM ATTACHMENT 1 -

REACTOR ENGINEERING / ACCIDENT ANALYSIS SUPPORT TEAM FACILITIES AND EQUIPMENT CHECKLIST Yes No

1. Pencils and paper available?
2. Telephone directories (Company / local) available?
3. Incoming message forms available?
4. Outgoing message forms available?
5. Status board log sheets available?
6. Status board EOF-6 set up?
7. Plarit parameter display available?
8. Are the telephone extensions listed in the Emergency Telephone Numbers section for the EOF Reactor Engineer-ing/ Accident Analysis Support Team available?

PR0184-0004A-RS02-TP01

e .

GENERAL OFFICE EMERGENCY PLANNING PROC NO EOF-6 Revision 2 APPROVAL

SUMMARY

TITLE: PLANT SUPPORT ENGINEERING SUPPORT TEAM i

_$Wh -

Z [ff'b Quality Assurance Support - Concurrence Date

/W General Office EmWrgency Planning - Approval N

Date JU - ?l Y' Nuclear Operations Department - Approval Date I

APPROVAL

SUMMARY

CONSUMERS GENERAL OFFICE PROC NO EOF-6 POWER EMERGENCY PLANNING PAGE 1 0F 4 COMPANY PROCEDURE REV 2 PLANT SUPPORT ENGINEERING SUPPORT TEAM l 1.0 PURPOSE The purpose of this procedure is to describe and define the responsibili-ties of the Plant Support Engineering Support Team in the Emergency Operations Facility (EOF) during an emergency situation ar a Consumers Pcwer Company nuclear facility.

2.0 ATTACHMENTS Attachment 1, " Plant Support Engineering Support Team Facilities and Equipment Checklist" 3.0 INITIAL CONDITIONS AND/OR REQUIREMENTS The plant must be at Alert, Site Area Emergency or General Emergency before initiation of this procedure. The EOF may be activated at the Alert stage at the discretian of the Site Emergency Director (SEE).

4.0 RESPONSIBILITIES The Plant Support Engineering Support Team Leader is responsible for ,

i providing the following:

i .

a. Engineering support for the EOF HP Support Team necessary in per-forming source term calculations i
b. Technical plant engineering interpretation for the Emergency
Operations Facility Director
c. Technical support for the affected plant l

PR0184-0005A-RS02-TP01

CONSUMERS GENERAL OFFICE PROC NO EOF-6 POWER EMERGENCY PLANNING PAGE 2 0F 4 COMPANY PROCEDURE REV 2 PLANT SUPPORT ENGINEERING SUPPORT TEAM NOTE: The roles of the Plant Support Engineering Team and the Reactor Engi-neering/ Accident Analysis Support Team may be combined at the discretion of the EOF Director.

5.0 REQUIREMENTS 5.1 ACTIVATION Upon arrival at the EOF, the Plant Support Engineering Support Team Leader should initiate the following actions:

a. Sign in on the " EOF Emergency Response Staff" status board.
b. Verify that the equipment, supplies and communication channels listed in Attachment I are available and functional for the support team.
c. Establish communications with counterpart group in the Technical Support Center (see Appendix G, Emergency Telephone Numbers Palisades / Big Ro'ck Point, for the telephone number) and:
1. ___ Review of the plant status.
2. Review of all engineering recommendations and calculations made. *
3. ___ Actions initiated by the plaat as they relate to engineering matters.
d. Indicate on the " EOF Emergency Response Staff" status board that the Plant Support Engineering Support Team is ready.

PR0184-0005A-RS02-TP01

CONSUMERS GENERAL OFFICE PROC NO EOF-6 POWER EMERGENCY PLANNING PAGE 3 0F 4 COMPANY PROCEDURE REV 2 PLANT SUPPORT ENGINEERING SUPPORT TEAM l

e. Brief the EOF Administrator on changes in plant status and mitigating actions as they occur until the EOF Director arrives.
f. As soon as the EOF Director announces that the Emergency Operations Facility is operational, assume responsibility for providing plant engineering interpretation for the EOF Director and support for the plant as requested.

5.2 OPERATIONAL

a. Provide the Emergency Operations Facility Director and affected Plant Technical Support Center Plant Engineering group with engineering interpretation and recommendations.
b. Provide the EOF Director with a summary of all plant actions as they pertain to plant engineering catters.
c. If the estimated duration of the incident warrants, arrange with the EOF Administrator to have a relief support team assembled.

5.3 DEACTIVATION When the situation warrants, the Emergency Operations Facility will be deactivated. Close out all communications as directed by the EOF Director or Emergency Officer. Close out all files and secure all forms, records and logs as appropriate.

e PR0184-0005A-RS02-TP01

CONSUMERS GENERAL OFFICE PROC NO EOF-6 POWER EMERGENCY PLANNING PAGE 4 0F 4 COMPANY PROCEDURE REV 2 .

PLANT SUPPORT ENGINEERING SUPPORT TEAM ATTACHMENT 1 PLANT SUPPORT ENGINEERING SUPORT TEAM FACILITIES AND EQUIPMENT CHECKLIST Yes No

1. Pencils and paper available?
2. Telephone directors (Company / local) available?
3. Incoming message forms available?
4. Outgoing message forms available?
5. Plant parameter display available (Palisades)?
6. Are the telephone extensions listed in the Emergency Telephone Numbers section for the EOF Plant Support Engineering Support Team available?

PR0184-0005A-RS02-TP01

GENERAL OFFICE EMERGENCY PLANNING PROC NO EOF-7 Revision 2 APPROVAL

SUMMARY

TITLE: HEALTH PHYSICS SUPPORT TEAM ,

e- 6 F/r$%

Quality Assurafice Support - Concurrence Gate le_ ~

General Offied Emer M y Planning - Approval /

W/S date G/ '

//ul w/

Nuclear Operations DepartmsHt~ Approval Wn,.-k.r Date APPROVAL

SUMMARY

l

CONSUMERS GENERAL OFFICE PROC NO EOF-7 POWER EMERGENCY PLANNING PAGE 1 0F S COMPANY PROCEDURE REV 2 ,

HEALTH PHYSICS SUPPORT TEAM 1.0 PURPOSE The purpose of this procedure is to describe and define the responsi-bilities of the Health Physics Support Team in the Emergency Operations Facility (EOF) during an emergency situation at a Consumers Power.

Company operated nuclear facility.

2.0 ATTACHMENTS Attachment 1, " Health Physics Support Team Facilities and Equipment Checklist" ,

3.0 INITIAL CONDITIONS AND/OR REQUIREMENTS l t The plant must be Alert, Site Area Emergency or General Emergency before initiation of this procedure. The EOF may be activated at the i Alert stage at the discretior of the Site Emergency Director (SED).

4.0 RESPONSIBILITIES i The Health Physics Support Team Leader is responsible for the following:

a. Interfacing with EOF Director, NRC, State of Michigan.
b. Interfacing with and assuring status updates for the HP Team.
c. Determining PAG recommendation. (BRP EPIP-5B, PAL EI-6.13)
d. Assisting EOF Director in emergency classification. .
e. Assuring HP team actions are consistent with events occurring in the plant. ,

l EOF-7-TP01

O .

CONSUMERS GENERAL OFFICE PROC NO EOF-7 POWER EMERGENCY PLANNING PAGE 2 0F 8 COMPANY PROCEDURE REV 2 HEALTH PHYSICS SUPPORT TEAM 5.0 REQUIREMENTS 5.1 ACTIVATION 5.1.1 Primary Staffing Upon , arrival at the EOF the HP Support Team Leader should initiate the following actions:

1

a. Sign in on the " EOF Emergency Response Staff" status board.
b. Establish communications with the TSC Health Physics group and review:
1. Current plant status.
2. Advised protective actions to the State.
3. Current protective actions initiated by the State.
4. ___ Offsite dose calculations results if a relea.e has occurred or projected dose calculations of a potential radiological release.
5. Actions initiated by the State of Michigan and NRC dose assessment organizations, the telephone numbers currently being used to communicate to these organi-zations and the update schedule established to provide them with current information.

EOF-7-TP01

CONSUMERS GENERAL OFFICE PROC NO E0F-7 POWER EMERGENCY PLANNING PAGE 3 0F 8 COMPANY PROCEDURE REV 2 HEALTH PHYSICS SUPPORT TEAM

c. Brief the EOF Administrator on Health Physics aspects of the emergency until arrival of additional Health Physics Support Team personnel from General Office.
d. Establish the Health Physics Support Team when additional support team members begin to arrive. As available, assign personnel responsibilities defined in Section 5.1.2. . .
e. Determine when the responsibilities defined in Section 5.1.2 can be adequately addressed by the Health Physics Support Team, and notify the EOF Administrator that the team is ready to assume responsibility for providing health physics support.
f. Indicate on the " EOF Emergency Response Staff" status board that the Health Physics Support Team is ready.
g. As soon as the EOF Director announces that the Emergency Operations Facility is operational, assume responsibility for providing health physics support.

5.1.2 Secondary Staffing NOTE: HP Support Team members shall provide the HP Team Administrator the status of equipment, supplies, and communication channels per the appropriate section of Attachment 1.

a. HP TEAM ADMINISTRATION
1. Coordinate HP team actions.
2. Review and approve notification form.

EOF-7-TP01

CONSUMERS GENERAL OFFICE PROC NO EOF-7 POWER EMERGENCY PLANNING PAGE 4 0F 8 COMPANY PROCEDURE REV 2

/

HEALTH PHYSICS SUPPORT TEAM

3. Monitor HP status boards.
4. Provide technical support to team members.
a. Selection of source term calculation approach.
b. Selection of offsite monitoring team aesignments and general sampling areas
5. Use trend graphs to monitor measured offsite doses to palculated doses.
6. Interface with State of Michigan on technical issues.
7. Interface with EOF /TSC HP team.

NOTE: The HP Team Administrator shall review the status of equipment, supplie; and communicast-M. channels as provided by team members, and Leport findings to the HP Sypport Team Leader.

b. OFFSITE DOSE ASSESSMEdT
1. Obtain meteorological and radiological data.
2. Calculate average energy, release rates and dose estimates.
3. Complete notification form for team leader review and approval,
c. SEGMENTED GAUSSIAN DOSE ASSESSMENT
1. Track and define plume using segmented dose model.

(Instructions for use of model are found in Appendix F of these procedures.)

2. Update team leader on latest plume location and magnitude.
3. Obtain meteorological forecast. I I

E0F-7-TP01

I i

CONSUMERS GENERAL OFFICE PROC NO EOF-7 POWER EMERGENCY PLANNING PAGE 5 0F 8 COMPANY PROCEDURE REV 2 HEALTH PHYSICS SUP? ORT TEAM .

d. OFFSITE TEAM COMMUNICATION
1. Communicate instructions to offsite teams.
2. Record offsite monitoring team data on status board.
3. Update offsite teams with:
a. Plant status,
b. Changes in meteorological data,
c. Changes in release information.
4. Track cumulative dose for members of the offsite monitoring teams.
5. Monitor thyroid dose for members of the offsite monitoring teams.
e. DATA RECORDING
1. Record meteorological and radiological data on status board.
2. Issue EOF personnel TLDs if dose assessment is necessary.
3. Monitor airborne radioactivity levels within the EOF if f acility is determined to be within the pathway of a radioactive plume.
4. Trend available projetted and actual dose information.
f. ENGINEERING
1. Provide engineering interfaces between HP team leader and engineering support team.
2. Provide summary of plant status, t
3. Provide summary of action taken by plant.
4. Determine potential release paths.
5. Perform source term calculations if required.

EOF-7-TP01

CONSUMERS GENERAL OFFICE PROC NO EOF-7 POWER EMERGENCY PLANNING PAGE 6 0F 8 COMPANY PROCEDURE REV 2 HEALTH PHYSICS SUPPORT TEAM 5.2 OPERATIONAL The HP Support Team shall function as needed to provide PAG recommendations.

5.3 DEACTIVATION When the situation warrants, the EOF will be deactivated. Close out all communications as directed by the EOF Director or Emergency Officer. Close out all files and secure all forms, records and logs as appropriate.

s EOF-7-TP01

-r- m , - - -----..-r-.. - , _ ._.,,_,.,-,._,-,.,__w_, _ . . _ . . . , - . _ _ _ . . --

. o CONSUMERS GENERAL OFFICE PROC NO EOF-7 POWER ,

EMERGENCY PLANNING PAGE 7 0F 8 COMFANY PROCEDURE REV 2 HEALTH PHYSICS SUPPORT TEAM ATTACHMENT 1 HEALTH PHYSICS SUPPORT TEAM FACILITIES AND EQUIPMENT CHECKLIST Yes No EP Team Administration Appropriate Site Emergency Plan Implementing Procedures available?

GORT/ EOF Emergency Implementing Procedures available?

Are the telephone extensions listed in the Emergency Telephone Numbers section for'the EOF Health Physics Support Team available?

HP status boards available?

Offsite Dose Assessment Meteorological / Radiological parameter display available? (Palisades only)

Health Physics Support Team notification forms available?

Straight-line dose calculation computer and printer operable?

Silent 700 computer terminal available?

Segmented Gaussian Dose Assessment Segmented Gaussian dose calculation computer terminal and printer operable?

Offsite Team Communication Emergency Planning Zone maps available?

Offsite monitoring team base station available?

Offsite monitoring team status board available?

EOF-7-TP01 I

)

CONSUMERS GENERAL OFFICE PROC NO EOF-7 POWER EMERGENCY PLANNING PAGE 8 0F 8 COMPANY PROCEDURE REV 2 -

HEALTH PHYSICS SUPPORT TEAM ATTACHMENT 1 Yes No Data Recording Box of replacement offsite accident TLDs available?

Box of offsite personnel TLDs, including log sheets and offsite personnel TLD instruction forms available?

Airborne radioactivity monitoring equipment available?

Multichannel analyzer available (Big Rock only)?

Meteorological and radiological data status board available?

Status board to trend dose information available?

EOF-7-TP01

.. - . - _ - . - . - . . - . . . . . - . . . . . . ~ . .

4 .f

GENERAL OFFICE EMERGENCY PLANNING PROC NO EOF-8 Revision 2 APPROVAL

SUMMARY

TITLE: PUBLIC AFFAIRS w

. , n&-

Quality Assurance Support - Concurrence s4vn, Date OG n PA I W General Offide Emergency Planning - Approval

$/W

/ Cate ff l

L./

~

% ~_ ' S Vf Nuclear Operations Department - Approval Date APPROVAL

SUMMARY

CONSUMERS GENERAL OFFICE PROC NO EOF-8 i POWER EMERGENCY PLANNING PAGE 1 0F 1 COMPANY PROCEDURE REV 2 ,

PUBLIC AFFAIRS 1.0 PURPOSE The purpose of this procedure is to describe and define responsibilities of the Corporate Public Affairs Department in the Emergency Operations Facility (EOF) .

2.0 ATTACHMENTS Nuclear Plant Emergency Public Information Policies and Procedures (not attached but made a part hereof by reference).

3.0 INITIAL CONDITIONS AND/OR REQUIREMENTS The plant must be at Alert, Site Area Emergency or General Emergency before initiation of this procedure. The EOF may be activated at the Alert stage at the discretion of the Site Emergency Director (SED).

4.0 RESPONSIBILITIES Responsibilities are as defined in the Nuclear Plant Emergency Public Information Policies and Procedures.

5 . 0' REQUIREMENTS Actions are as' defined in the Nuclear Plant Emergency Public Information Policies and Procedures.

PR0685-0230D-TP13-TP01 l

e .

GENERAL OFFICE EMERGENCY PLANNING PROC NO EOF-9 Revision 2 APPROVAL

SUMMARY

TITLE: EMERGENCY PLANNING s

' ~

.m w -

6 ffyC:

Quality Assurance Support - Concurrence D' ate AN I on Genera' Of f" ice EmMgency Planning - Approval

$/ d ll Cate L 7b7iS6 Nuclear Operations Departmen't Approval Date APPROVAL SLWARY

CONSUMERS GENERAL OFFICE PROC NO EOF-9 POWER EMERGENCY PLANNING PAG 10F 2 -

COMPANY PROCEDURE REV 2 EMERGENCY PLANNING 1.0 PURPOSE The purpose of this procedure is to describe and define the responsibili-ties of the General Office Emergency Planning Section in the Emergency Operations Facility during an emergency situation at a Consumers Power CompanyI nuclear facility.

2.0 ATTACHNINTS None 3.0 INITIAL CONDITIONS AND/OR REQUIREMENTS

/ The plant must be at Alert, Site Area Emergency or General Emergency before initiation of this procedure. The EOF may be activated at the Alert stage at the discretion of the Site Emergency Director (SED).

4.0 RESPONSIBILITIES The Emergency Planning Section acts as resource personnel in technical and nontechnical areas for all participants to ensure an efficiently operated facility and interface between participants at all emergency response facilities (botv Company and non-Company).

5.0 REOUIREMENTS 5.1 ACTIVATION Upon arrival at the EOF, the Ecargency Planning Section Leader should initiate the following actions:

PR0685-0230E-TP13-TP01

CONSUMERS GENERAL OFFICE PROC NO EOF-9 POWER EMERGENCY PLANNING PAGE 2 0F 2 COMPANY PROCEDURE REV 2 EMERGENCY PLANNING

a. Sign in on the " EOF Emergency Response Staff" status board and continue to monitor the status of the emergency with the Emergency Officer and EOF Director.
b. Verity the extent of the emergency situation with the EOF Director.

5.2 OPERATIONAL

a. Provide assistance as requested by the EOF Director and/or Emergency Officer.
b. Provide assistance as requested by the Health Physics, Reactor Engineering / Accident Analysis and Plant Support Engineering Support Teams.
c. Provide requested liaison support between Consumers Power Company and non-Consumers Power Company groups.

5.3 DEACTIVATION When the situation warrants, the Emergency Operations Facility will be deactivated. Close out all communications as directed by the EOF Director or Emergency Officer. Close out all files and secure all forms, records and logs as appropriate.

PR0685-0230E-TP13-TP01

GENERAL OFFICE EMERGENCY PLANNING PROC NO EOF-10 Revision 2 .

APPROVAL

SUMMARY

TITLE: PROPERTY PROTECTION N d' $' I '6:

Quality Assurance Support - Concurrence 'Dat e s I on $ 1d S General Office Emailency Planning - Approval / Dat'e

/ 5 Y'$

~-

/ -.

Nuclear Operations Department - Approval '

Date l

APPROVAL

SUMMARY

--, --m-~, -- ,- , ,- r e--, - -r r -, n,-,----,,--,-, ----,. ,- - .-n-,- , n, .,--,------,-,w.--,- ,-m,--- , - - , - - - -

l 1

i l

l

. i CONSUMERS GENERAL OFFICE PROC NO EOF-10 '

POWER EMERGENCY PLANNING PAGE 1 0F 1 COMPANY PROCEDURE REV 2 PROPERTY PROTECTION 1.0 PURPOSE The purpose of this procedure is to describe and define the responsibili-ties of the Property Protection Department Group at the Emergency Operations Facility (EOF) during an emergency at a Consumers Power Company nuclear facility.

2.0 ATTACHMENTS Property Protection Department Operating Procedures Manual (not attached but made a part hereof by reference).

3.0 INITIAL CONDITIONS AND/OR REQUIREMENTS The plant must be at Alert, Site Area Emergency or General Emergency before initiation of this procedure. The EOF may be activated at the Alert stage at the discretion of the Site Emergency Director (SED) .

4.0 RESPONSIBILITIES Responsibilities are as defined in the Property Protection Department Operations Procedure Manual.

5.0 REQUIREMENTS Actions are as defined in the Property Protection Department Operating Procedures Manual.

PR0685-0230F-TP13-TP01 k

GENERAL OFFICE EMERGENCY PLANNING PROC NO EOF-11 Revision 2 APPROVAL SLTfARY TITLE: SECRETARIAL / CLERICAL SUPPORT TEAM

. w , f_d n 4 Quality Assurance Support - Concurrence 6/fr/Ed tate 3 i &h $ N eneral Office Ime?%ency Planning - Approval / Date

/

Je& wk //$ by Nu:: lear Operations Department - Approval Date APPROVAL SLTIARY

CONSUMERS GENERAL OFFICE PROC NO EOF-11 POWER EMERGENCY PLANNING PAGE 1 0F 4 COMPANY PROCEDURE REV 2 SECRETARIAL / CLERICAL SUPPORT TEAM l 1.0 PURPOSE The purpose of this procedure is to describe and define the responsibili-ties of the Secretarial / Clerical Support Team in the Emergency Operations Facility (EOF) during an emergency at a Consumers Power Company nuclear facility.

2.0 ATTACHMENTS Attachment 1, " Secretarial / Clerical Support Team Facilities and Equipment Checklist" 3.0 INITIAL CONDITIONS AND/OR REQUIREMENTS f

, The plant must be at a Alert, Site Area Emergency or General Emergency before initiation of this procedure. The EOF may be fully activated at the Alert stage at the discretion of the Site Emergency Director (SED).

4.0 RESPONSIBILITIES The Secretarial / Clerical Support Team provides secretarial / clerical support to the Emergency Operations Facility emergency response staff.

5.0 REQUIREMENTS 5.1 ACTIVATION Upon arrival at the EOF, the Secretarial / Clerical Support Team Leader should initiate the following actions:

a. Sign in on the " EOF Emergency Response Staff" status board.

PR0184-0010A-RS02-TP01

. b CONSUMERS GENERAL OFFICE PROC NO EOF-11

. POWER EMERGENCY PLANNING PAGE 2 0F 4

  • COMPANY PROCEDURE' REV 2 SECRETARIAL / CLERICAL SUPPORT TEAM
b. Provide support as requested by the EOF Administrator.
c. Verify that the facilities and equipment listed in Attachment 1 are available and functional. If not, contact the Logistics Support Team Leader for assistance.

, d. Assign personnel to:

1. Control and maintain the distribution of documents and engineer-ing records with the EOF.

4

2. Operate telecopy machines.

1

3. Log and distribute received messages to appropriate EOF staff.
4. Assist the EOF Director and Emergency Officer, as requested.

7 5.2 OPERATIONAL

a. Assure that the tasks assigned to the Secretarial / Clerical Support Team members in Section 5.1.d above are being carried out.

I b. If the estimated duration of the incident warrants, arrange with the EOF Administrator for a relief support team and rotation schedule.

c. Provide any additional support as requested from the EOF Administrator.

PR0184-0010A-RS02-TP01 I-

j CONSUMERS GENERAL OFFICE PROC NO EOF-11 POWER EMERGENCY PLANNING PAGE 3 0F 4 COMPANY PROCEDURE REV 2 SECRETARIAL / CLERICAL SUPPORT TEAM 5.3 DEACTIVATION When the situation warrants, the Emergency Operations Facility will be

' deactivated. Close out all files and secure all forms, records and logs as appropriate.

i 6

PR0184-0010A-RS02-TP01

.. - - __ _ _ . . _ _ _ . _ . . _ . . _ _ _ _ _ . - - _ _ . . - _ _ _ _-. . _ - ~_

l CONSUMERS GENERAL OFFICE PROC NO EOF-11 POWER EMERGENCY PLANNING PAGE 4 0F 4 COMPANY PROCEDURE REV 2 SECRETARIAL / CLERICAL SUPPORT TEAM ATTACHMENT 1 SECRETARIAL / CLERICAL SUPPORT TEAM FACILITIES AND EQUIPMENT CHECKLIST Yes No

1. Incoming message forms available?
2. Outgoing message forms available?
3. Message log available?
4. Pencils and paper available?
5. Telephone directories (Company / local) available?
6. Xerox machine available?
7. Typewriter available?
8. Facsimile machine available?
9. Call Director functional?

PR0184-0010A-RS02-TP01

GENERAL OFFICE EMERGENCY PLANNING PROC NO EOF-12 Revision 2 APPROVAL

SUMMARY

TITLE: LOGISTICS SUPPORT TEAM

~ s ~) #

Quality Assurance Support - Concurrence a a'Datec..

f G= -

W neral Offlee Emergency Planning - Approval /

YN D' ate r

/ W&.

Nuclear Operations Department % Approval '

Date 4

APPROVAL

SUMMARY

CONSUMERS GENERAL OFFICE PROC NO EOF-12 POWER EMERGENCY PLANNING PAGE 1 0F G COMPANY PROCEDURE REV 2 LOGISTICS SUPPORT TEAM 1.0 PURPOSE The purpose of this procedure is to describe and define the responsibili-ties of the Logistics Support Team at the Emergency Operations Facility (EOF) during an emergency situation at a Consumers Power Company nuclear facility.

2.0 ATTACHMENTS

" Nuclear Plant Site Emergency Building Services Procedures" (not attached but made a part hereof by reference).

3.0 INITIAL CONDITIONS AND/OR REQUIREMENTS The plant must be at Alert, Site Area Emergency or General Emergency before initiation of this procedure. The EOF may be activated at l the Alert stage at the discretion of the Site Emergency Director (SED).

4.0 RESPONSIBILITIES The Logistics Support Team Leader is responsible for setting up the Emergency Operations Facility (EOF) and coordinating and maintaining all support services required to keep the EOF operating in a reliable and efficient manner.

PR0685-0230G-TP13-TP01

CONSUMERS GENERAL OFFICE PROC NO EOF-12 POWER EMERGENCY PLANNING PAGE 2 0F 3 COMPANY PROCEDURE REV 2 ,

LOGISTICS SUPPORT TEAM 5.0 REOUIREMENTS 5.1 BUILDING SERVICES 5.1.a Activation Upon arrival at the EOF, the Logistics Support Team Leader should initiate the following actions:

1. Sign in on the " EOF Emergency Response Staff" status board.
2. Verify that Phase II of the " Nuclear Plant Site Emergency Building Services Procedure" has been carried out.
3. Verify that all support equipment has been set up and is functioning properly. If not, arrange to have equipment repaired.

5.1.b operational

1. Provide all assistance as requested by the EOF Administrator.
2. If the estimated duration of the incident warrants, arrange a relief rotation schedule utilizing people from the Region.

5.1.c Deactivation When the situation warrants, the Emergency Operations Facility will be deactivated. Return all emergency equipment to its respective storage location.

l PR0685-0230G-TP13-TP01 i

--. . - . . - - , - - _ ,,-- ,_,.a-,c,,-- . . - - - _ _ . - - , - , - . . - -

CONSUMERS GENERAL OFFICE PROC NO EOF-12 POWER EMERGENCY PLANNING . PAGE 3 0F 3 COMPANY PROCEDURE REV 2 LOGISTICS SUPPORT TEAM 5,2 COMMUNICATION SERVICES I

5.2.a Activation

1. Proceed to the Emergency Operations Facility.
2. Check and test all equipment to make sure it is functional.
3. Provide assistance as needed on equipment use.

5.2.b Operational

1. Make arrangements for replacement and/or repairs of equipment as needed.
2. Arrange for additional phones, lines, radios, or other communications equipment and facilities as needed.
3. Provide additional support requested by the EOF Administrator.

! 4. If the estimated duration of the incident warrants, arrange a relief rotation schedule utilizing people from the Technical Support Center facilities support staff.

PR0685-0230G-TP13-TP01

. ()

)

f GENERAL 0FFICE EMERGENCY PLANNING APPENDIX C CANCELLED APPROVAL SLTMARY

! TITLE: REVIEW & CONTROL OF GORT/ EOF EIPs,

! GORT EQUIPMENT & ON-CALL DIRECTORS' SCHEDULE

)

Quality Assurance Support - Concurrence Date i W O h$

General Of& ice Emer}ency Planning - Approval '

Date Nuclear Operations Department - Approval Date This appendix has been replaced by GOEP Administrative Procedure, GOEP-09.

APPROVAL SUFD'.ARY

e .

GENERAL OFFICE EMERGENCY PLANNING APPENDIX E CANCELLED APPROVAL

SUMMARY

TITLE: GENERAL OFFICE RESPONSE TEAM i.

Quality Assurance Support - Concurrence Date General Office EmeYgency Planning - Approval

/A )/ Dat's I Nuclear Operations Department - Approval Date This appendix has been replaced by GORT/ EOF Procedure, GORT-1.

i i.

l l

l APPROVAL

SUMMARY

l

<  :) .

EMERGENCY TELEPHONE NUMBERS Appendix G Revision 0 TABLE OF CONTENTS 1

P,,ag e Augmentation List (GEN-3) 1 Augmentation List (GORT-1) 2 .

Mandatory Telephone Notifications (EOF-4) 4 Non-Company Support (GORT-1 & EOF-4) 5 Emergency Telephone Numbers Palisades (EOF-6) 7 Emergency Telephone Numbers Big Rock Point (EOF-6) 8 9

9 APPENDIX G

u -.

lir L , >

E I EMERGENCY TELEPHONE N1.'MBEh5 Appendix G AUGMENTATION LIST Revision 0

, (GEN-3)* Page 1 of 8 e.

EE

( Area of lelephone

, Responsibility Name Work Home

) ' ' (( , f' .,h,]

h

~

h Vice President J 's ,.0 } j ' -

. . y,t ", ,s 7,,'[;, lhk Nuclear Operations ., _

[g ,.; 7 ,

p i.- . . - 4:g.f ..e. s. - ,,,:.= ,

,s c ,- -

Vice President f.$;,h,:d [ - '

J',~ ag @ {,,,s.j,,Qk

' , . }. .  % [ .; .

y;:, j Energy Supply Services;_; /.

x . y-

&,. .. . . .:. e r m;r -  :: ,' .; , no - ;,_ .

.: . .. p c e.t> f-., . .' ,,' ..->-;,.

',',..'?-

...,4 (- . .; g.i.,g. - r g e,

,7 = .. ,

e ,' .; , , .r ;

. w.,

E Executive Director  : m ' NL

+ a %.'1 ;fgk. ' N. 'i ' '+W e n d= - D.'

,<M  : :.

' N .t,. -. +-~  ; $; K w. .. /* +,v P3 %af e  ;-

p Nuclear Assurance p 7g= ,:;.: m-t ;'s -

6

, ,'.r

. , . .:4.j, ,C :- l; .; J: &. 't W -  : 1 ..f;",e. .;1 vi

, .a%l4s -'

g ,,7.t .k, p' S, #, M; W

. '; 7. "

  • Executive Director
  • b .

4.* o%, .-3. ., . W<> . . ..,9'.-- r. p% 4 ,s

'; 5. .u. in ..T'- t,,4 s .- - .

.:. 3&  : .---

1 Planning, Training 7"' .> a ~- pW . . M.(.J .,. :<,u.. ', . j.2 P y ..Lw ., w D,1. <7.

N.. . k .A. >-, g/p.

g, y [ .

c o .,- G ,...n-

'1

& Administration .%v - (; .

., x  ; -T .n,.- M. -s s.

.. . a

."' _-..-s +m Emergency Planning

.. ??. . l. V.)R-ll.'l;; ? . :kk$s.f.h< iJ..,' f.1.jg f k, + m , . mj:Q. .

_&,(.,c4 ? '.1 3 . ,,.#,*, . - l< ,.; ;,., . . . g.u. ,; g't .y , ' hpO. > ' t_- , -l% . y,

.g6

ki[ .

l .l-} Q -

  • i; ' A . a'.,[' ~

y

  • y ;- lL _ -., .*_

y, f N.e+ - *',y e 9 . , , - s c , i.

p l ,, ), . , ,'[

' ,j-

[-
  • b ', %*i,fi p , l'

^

'q., . .,- h, ,, ,wf

..,.h

~

.gs.n f e,

, , .,.,. . y ,... m y .e.a4.x' ,

',-g '- (r,' '

. ~ . . .+

b'

('; '-

  • f, s..a.y.c4 m, o e,,.

, 3 ,,

3

.. . . ( . ; . " ./  ;' .

Public Affairs e, j'

?

.,',-, r ." . ,1 ,' .

- * ,h i ' [,j .,h

d k, ' ' , -[

._I .$.) ' 'f

's eq A w. *m. *

.. n.. *:- -

O.4,3.W' M, )

.K'"g.a

  1. "g.,_ 'AT; 4 O ./ * .', - s..s

> .g '.'yM : e- .. s-li r Radiological i.-' *  ;: -

r

- , -p'y a, +. 4% , '., , .%.

. il!4W;* :y ... . 4a.,l. .(-yr. y _v.- ' ; Y. ' ,,. . .

Q7 O l ~. g L .) - j , '., ' , 'j , . :. . , . ,'- .

-3.

f Logistics /

Communication

'g -

')..Df. .g'

,,.[,

l g, g Yy & ...

'?{.

{ Services NW t- c. -

g%- -

t g FA1 E

r w .

i m

k 7

L 7

R

  • Augmentattan list used in conjunction with 1RT/ EOF Procedure GEN-J.

m E

r. APPENDIX G

=

V F

e

. '4 EMERGENCY TELEPONE NUMBERS Appendix G AUGMENTATION LIST Revision 0 (GORT-1;* Page 2 of 8 Arm of Telephone Responsibility Name Work Home e..

.; t S.U Adt. _ ais tra to r s p, - h ,y. ,7, . .I . . . . .'l d Y 7 $2/"i.t" p f.y i. .\.'.#[ w _:.~_,..  ; _

[MIl

~[ c

~ h,) i. .7.4[_

g: .~ .

'- 1 (.4 .$. [.

..y z ;- c yk,p , 3..nT' n.]e* y[y ,,' ,_ y

,, . k , [

3 / . ;. A;*: ?2 R ( '. % ?, e . : . aT f. ..~.-

.. . .u

~

/

4 .q*y:.7. L

.W s. r.n

?..  ? 0 0 ~. - .

yqj ;;. 4 .y.v -

  • 9,n.; *>  ;.  ;,., V. y . ,e ,'  ; ._ , .

Communicators NW/ : #y c , i

' ~

k .. - O .h. .. ;e;.. s *. -: D 4" i ."

' J^f

V.'. d.* k *n _1., .;,

x ...

R'y +s ' s .l;. , ., '

7 _

'[:. t

.l-,. g. 3 y

  • C'- . . W D . y y* ,. 3 ,:.. ,J f,1,E ',. P ' ,. l[y -

^

, '., . e 1

,e.,.

- ..:N,ip . - ' ..h .

- 'f.. tY .4, j* - - s ..

I

,- a-n y. . , " y ", . ( !*-. .y: .^ a.c e- zi 3-; , .9 ' , V .>' y. ( y. .3.. . . #;

_4...-

y ;

,.9, ,s .

.,u.

  • .p (_ ; . L n.,x 8 -z.-

- yp..t + 9 y(, .

.,;,.. u.

.s,a. ,

l%%pY.].; . I I j'i.

. $8 . - ~ _ . &. :Y ')wl Oa

2 '

.

  • W :. .. yp} .,y y. y;*,.

e Ln .R.

3 ,

g.3_ 3. ..+. _ . #, f x '; <. ai'.'

', . .'... l;

,',,  ; y 3-1' * ' , . s.' ~$ . ! .. : p , r k.;. M' . ' M ,c 5,.

m S.l . . i 1. r

".r I: :

+ Y '". ,3 ,r Y

/ "'

' .'. k N '

v , ' f, ..,,fIkl'[? f, .s,,.-.' -: y' h .. t - " . A.N 4 ,m

.u;.e

  • J % % ' t 7 n -v .

uM q/ g.,f - JJ:, wg . pgg;

,,' M .  :

Plant Support . t-

. .'. - , ++&n

-1,r.i ":.. Q se,. . q.. , u , f.

(A.:

Engineer , $L ..O 5 . "fi ? *

~$ $ ~l WMM f 3

e .p 3, . ' J2..fw[w.,@,.J'--(.'b -

M ,,yge ,',4. . .: b

  1. - / I::" 4,..r. . o w* , . . .u. c.R:- .n ws: .'.T. hy'; ...J.D, m: xt

.2 p pWA,, .

- n'p:.etr;4 8

i o.th.

~.9. 4

.",}r..Ts y g;A C * .,j% y e-y* i w' 4 ; J , .

Reactor Engineering / W fkhI' 'k ;[

Accident Analysis "b,( c

@kh

/

7M* [#. ' .9 f[5 ,[N. '".V 5 " /. .' i .,. ~. %

e M i. F.m...Nw. d . y : *. x v......,.r t- %

4..8 4 .#. .r. ..

f) h,sM.

>.t.p. e ]. , n(N)ah. . .;4yl. . f.. A.lYp..{$_-l N.-.'h.,'

s -2 . r , ,.

4,y

,}

Secretarial /

p . , ' . . ( f,, y#- . . , , ..(W 0 3 . .

&e s!h.h 7 '.

  • t .7,

}.

.3, , *.,'

4.M P'. " N:'I o '- '.;+M T J W U 'l, +51 . 'M. -t r]s'd

,;p V vy s M "'.i .'s Y.*.'t Clerical

.c -

.  ! 'e-
h. .g. ;b - Y f f..'

gjd.[-:s .Q

$r g-f ;f'.1 G.[:,,y,(, g.g7 f:N%

I ( , [. .

Dose Assessment h r $.. .K;,.,[w[; %?Q q i*a ;- h 3 :.c fJf.'.-? 'j.'r Y pf9 6 Computers , .

) g ?-; s.. .j '

f.pi V # j f h. 3t,y r c,4,1 -r )%.l-

.tL, ' I

. ,., c y. - - Y.w$,.-

  • f. ! ,q'w" ys.*sh N v m - n,. . . , ., . ;.f, . ,v '

.b

-i.(s m.

- #%.n,- . 5 . . b: 3 Property Protection m.

W, Q: m- ,y O.m. '.W q . t.* ,1.4.-n'-

. ;. :+ P . .~.W p.. , , W:,p.. ;

>~

,a. , . , . e, . = p .s /p'h..qn. se.

?.

.. .; ,bg, c,. n .p) . - 1. .'. ' qW, f.g,s -d . e

,, 4. .

5-  : - \ E.. P. . .M

.. t, 9 .r. ,

,e -

, ,J n . n 3- ..< v ~

$_ .$r: 2. # . p ,1.

q. [Y. .y%P kk. Q." wr# r Y-'. P3e Document Control

.S dp  % Q- kv'd. )%id'@,;r ' ,- c n

Y[* 3.. . . " v .. : <,, .;.bg t .

gJ d .[M s.D . .hy '..

2

_.,d,4 _y-t yv.e. E % y.; q.}
ffllf,?, ,

k ;'s&.1.$u

o, y/ ;." ,,(.1

..y 4 y

.,p}-

- :I. (fE -

y,

&Q$4;;

L dc e. 9,.

,9g6t&%&Q Q b%vMW;.92 . f @ $gj,.3

@ . C

.. ,2 ! 4 y:, -3 4h % * * -

?- '+' - '

  • Augmentation list used in conjunction with CORT / EOF Procedure GORT-1 APPEND 3 G m-__---- -

i _

s <a EMERGENCY TELEPONE NUMBERS Appendix G AUGMENTATION LIST Revision 0 (GORT-1)

  • Page 3 of 8 Area of Telephone Responsibility Name Work Home Engineering Records Technical Library (Parnall)
  • Augmentation list used in conjunction with GORT/ EOF Procedure GORT-1.

I APPENDIX G

k 4 EMERGENCY TELEPHONE NUMBFRS Appendix G MANDATORY TELEPHONE NOTIFICATIONS Revision 0 (EOF-4)

  • Page 4 of 8 I. The following agencies must be supplied with information from EOF-4, Attachment 2, and provided updates every 15 ninutes or at a mutually agreed upon schedule:

(1) State of Michigan '

Primary:

Alternate:

(2) US NRC Primary:

Alternate:

Region III (contact only as necessary or requested).

II. Organizations to be notified and to be updated as conditions warrant:

Day Night (1) CP Co Legal Department William Wisner (2) CP Co Insurance Department Director, James Cooper (3) Nuclear Mutual Limited Area Co ,

Telex:

Harold Hayes Building Ear-La-Ville Road Hamilton, Bermuda

  • Mandatory Telephone Notifications used in conjunction with GORT/ EOF Procedure EOF-4 APPENDIX G

, =

6

a EMERGENCY TELEPHONE NUMBERS Appendix G NON-COMPANY SUPPORT Revision 0 =

(CORT-1 & EOF-4)* Page 5 of 8 1 a.

i -

(1) Mutual Assistance (Refer to Appendix A) .

(a) The Detroit Edison Company: a Control Room, Fermi II Nuclear Plant j

r... - .

'['

.8%

h' i [y,k) .g .q. ,

. 5 -; . TM

, . ...,j*, .,,%.g

, _ _.. ic

. : -M

. . . .eA I//i-h'Il~.("

y.tp.. p . .

f "

y (b) Toledo Edison Company:

.c

] ..

3 Davis-Besse Nuclear Power Station, Emergency Coordinator ~'J Nig c:

gl (c) Cleveland Electric Illuminating

}, Company:

.' Perry Nuclear Plant Plant Manager

...,a.....

c t b. 1. . j

..  : .M . 9-T 5,W  ; 4 .tf. f

. _ o .a  :

3 g. -

~

e (d) Indiana & Michigan Electric Company:

- j Plant Manager): .; z: .9f ,-) - : q , q g. -

Day:

  • v-

.. ? . f gL 3g%..;' QJ .* f "# 4 ~ s ,J cy - Qq Night: -

.i . Mg;l, ,.

2 (Assistant Manager): Day: P  ? - [, . .'!./ I:. w ,

i

.'~.

Night: If<rc:4  ? .'^H.i . 'I. r+ ;. =

l U-(.- a Assistant Mant.ger): Day: .Q 2.. s' 's % -k.5 3 ij[ ' M

5. '

Night:

't. bfN'.^.U:

-=. .. ! . y .-.['

4 -- fif / f

=

(2) Department of Energy, Radiological Assistance Team . min i
  • 3 Days a

=

Night i.' js{ % .!N lg & ;f'?

('[?D g.n3.-, - @

a -,

(3) Institute for Nuclear Power Operations --

/ '

Phone: 4-Honr Number) --

Telecopie- -

3

*Non-Company Support used in conjt. action with CORT / EOF Procedures 4 CORT-1 and EOF-4 3 "a

M y

m APPENDIX G --l

-E 9

4 m

Q- . , - ii ii is '

a 1 _

k ~

EMERGENCY TELEPHONE NUMBERS Appendix G NON-COMPANY SUPPORT Revision 0 (GORT-1 & EOF-4)* Page 6 of 8 (4) Nuclear Safety Analysis Center (5) Atomic Industrial Forum (6) Bechtel Associates a

(7) General Electric Co Day Night n  :

(8) Combustion Engineering, Inc (9) Babcock & Wilcox 24-Hour Maintenance Number:

(10) Westinghouse Electric

, Day Night

.11) Other

Reference:

INPO Emergency Resources Manual

[

  • Non-Company Support used in conjunction with GORT/ EOF Procedures GORT-1 and EOF-4.

APPENDIX G

. _.M_m ..

]

i e 4 EMERGENCY TEli PONE NUMBERS

  • Appendix p  :

PALISADES Revision 0 I (EOF-6)*** Page 7 of 8 p CokT EOF TSC Director Director Site Emer Dir Senior Management Emergency Officer Operations l Radiological Advisor Administrator Administrative Emergency Planning Ilealth Physics Facstalle Facsimile Technical i

Public Af fairs Reactor Engineer Haintenance ,

logistics Support Engineer Communications Radio Communicator Chemistry All numbers are rea code.

Emergency Planning llealth Physics JPIC

~ Secretarial / Clerical Command Center Facsielle Facsimile Public Affairs County f  :

LogistJcs (Bldg) NRC S

State (Comm)

Palisades All numbers ar ca code. Public Af fairs Control Room SS Office NRC Hanager Health Physics All numbers are e.

Engineering e

' Communications Public Affairs 1

State of Hichl n

ea cod . ,; -

All numbers are

  • Additional lines can be added by request of the logistics Support Team.
    • Power failure only.
      • Palisades emergency telepone numbers used in conjunction with CORT / EOF Procedure EOF-6. l

{

APPENDIX C l

w--n---u-------.-i----

i' .. (,[ '} },j-p j',{ O h pf , f. ' I . } ,g 7.[],7,,c l h.s. ;. g.'

  • z. g '..~,j ,$,[ ,- 3. f' v, .: [ s.

,y%P:

, . ' 7..:q p 4..._;_

_ ,,y)fi,-)

). "- ., } '4+_ %f }.f , " ...,. _ ' ,-:.;. 4 ~...:

p _ !,.A. ' ' , %y. .,-

, ;.+ ,';

s. v. - %.a ; Jy . ..>.b

, . - <,  ? - -

. _ ; y '.

, .. -:.s~

e EMERGENCY TELErdONE riUMBERS* Appendix t. l Revision 0 BIG ROCK POINT (EOF-6)*** Page 8 of 8 g

I CORT EOF . .

. .. TSC ,

Emergency Officer Director Director Senior Management Director Communications Radiological Advisor Engineering Emergency Planning Administrator Ifealth Physics Facsimile llealth Physics Data Recorder Public Affairs Facsimile All numbers ar rea code.

Logistics Reactor Physics and Plant Support Radio All numbers ar rea code. Communications JPlc Command Center Public Affairs Logistics State and Local Govt Emergency Planning Secretarial / Clerical Facsimile Conference Room FEMA and NRC State of Michigan

, NRC Hanager All numbers are rea code, liealth Physics Engineering Communications Public Affairs All numbers are area code. -

  • Additional lines can be added by request of the Logistics Support Team.
    • Power failure phone.
      • Big Rock Point emergency telepone numbers used in conjunction with CORT / EOF Procedure EOF-6.

APPENDIX C u = - :== m ,

s .(,

GENERAL OFFICE E:ERGE: ICY PLA TNI:IG Appendix H Revision O Page 1 of 1 4,

e: e l o, ll. s1 f 'S oy '

f~ f f '

Mfff o u ~u

.o n Ej 8, e

s e 5 5 #$  !, c'R :E u i

L V 4 4 ,n %o

~

e%c* E&U

~ E ~I j JCel e

' :CEE: : E g: 44 :o # c,*G :

g E Y' EOF TRAINING MATRIX e fffJx

?!?

  • bal ce rtii o 33 ,

.,F: ,g3e 5ee 4 Adel tre  ? ~~ a t2 er 4. . yg .e O 8r & a f & a t '5 4 4 EOF Director R R R O EOF Administrator R O Emergency Officer R R 0 Health Physics R R R R R O EOF Engineer R R O EOF Comunicator R R O Logistics R O Secretary R O Controller R O_

BRP EOF Engineer R R O BRP EOF Comunicator R R O Offsite RMT Driver O O EOF Technical Advisor R O JPIC Team Advisor - Ops R O Chief Spokesman R O i

R - Required annually 0 - Optional

  • - Following initial completion may be fulfilled by drill / exercise participation.

UNITED STATES 8 0*h NUCLEAR REGULATORY COMMISSION g I WASHINGTON, D. C. 205S5

% . . . . . ,o July 30,1986 50-155/255 Big Rock Point / Palisades MEMORANDUM FOR: Chief, Document Management Branch, TIDC FROM: Director, Division of Rules and Records, ADM

SUBJECT:

REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed the attached document and has detemined that it may now be made publicly available.

/fg # Y ~Y)

Donnie H. Grimsley, Director Division of Rules and Records Office of Administration p

Attachment:

As stated l

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 985ff59199 DOC.DATE: 86/07/21 NOTARIZED: NO DOCKET t)

FACIL:50-OOO Generic Docket 05000000 50-155 Big Rock Point Nuclear Plant, Consumers Power Co. 05000155 50-255 Palisades Nuclear Plant, Consumers Power Co. 05000255 AUTH.NAME AUTHOR AFFILIATION CARLEY,A. Consumers Power Co.

RECIP.NAME RECIPIENT AFFILIATION Record Services Branch (Document Control Desk)

SUBJECT:

Forwards Central Files version of emergency implementing procedures, including Rev 0 to GORT-1, " General Ofc Response Team (GDRT)," Rev 2 to EOF-1, "Emargency Officer" & Rev 2 to EOF-3, " Emergency Operations Facility...." Withheld. ,

DISTRIBUTION CODE: XOO5D COPIES RECEIVED: LTR _h ENCL TITLE: Emerg Plan (CF Avail) u SI ZE:

dL $)

NOTES:Lic ense Exp date in accordance with 10CFR2,2.109(3/1/74). 05000255 RECIPIENT COPIES RECIPIENT COPIES ID CODE /NAME LTTR ENCL ID CODE /NAME LTTR ENCL BWR PD1 LA 1 0 PWR-B PD8 LA 1 O BWR PD1 PD 1 0 PWR-B PDS PD 1 O ROTELLA,T k 1 1 WAMBACH,T gf 1 1 INTERNAL ADM/DRR 1 1 IE/DEPER/EPB 2 2 DEP RB 1 1 REG EILES 1 1 i

TOTAL NUMBER OF COPIES REGUIRED: LTTR 11 ENCL 7