3F0198-35, Forwards Complete Updated TS & Bases Pages to TS Change Request Notice 210 Submitted on 970614.Updated Pages Reflect Changes Identified in Licensee ,Correction of Typo & Addition of Footnotes

From kanterella
(Redirected from ML20198S908)
Jump to navigation Jump to search

Forwards Complete Updated TS & Bases Pages to TS Change Request Notice 210 Submitted on 970614.Updated Pages Reflect Changes Identified in Licensee ,Correction of Typo & Addition of Footnotes
ML20198S908
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/22/1998
From: Grazio R
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198S913 List:
References
3F0198-35, 3F198-35, TAC-M98991, NUDOCS 9801260341
Download: ML20198S908 (2)


Text

, , -

l.

Florida Power

_ CORPORATION c,, i=., o,* : -

o.a mam Operseens Ucense 8so IM-72 January 22,1998 3F0198-35 U.S. Nuclear Regulatory Commission

, Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Technical Specification Change Request Notice 210, Updater! Technical Specification and Bases Pages (TAC No. M98991)

References:

1. FPC letter dated June 14,1997 (3F0697-10) ' Technical Specification Change Request Notice 210"
2. FPC letter dated November 21,1997 (3F1197-45) " Technical Specification Change Request Notice 210, Revision 1"

Dear Sir:

Florida Power Corporation (FPC) hereby submits complete updated Technical Specification and Bases pr.ges to Technical Specification Change Request Notice (TSCRN) 210, submitted to the l NRC in Reference 1. These updated pages rellect:

  • - the changes identified in Revision 1 of TSCRN 210 submitted to the NRC in Reference 2. g e the correction of a typographical error on page B 3.7-87 submitted k Reference 2. The reference to " Condition C"is corrected to " Condition D" in the Bases of Actions A.1 and A.2 , gt))

-(see page B 3.7 87), consistent with the associatea Technical Specification proposed in i i

Reference 2.

'e the addition of footnotes steting " Note - Valid until Cycle 12 Only." The footnotes indicate those portions of the proposed Technical Specifications and Bases that are to be issued on .a interim basis, ' consistent with the' Redline / Strikeout pages provided to the NRC in 1 References I and 2.

  • The update of these pages involves additional restrictions and a typographical correction, which do not aller any conclusion, or the basis for any conclusions, made and submitted in TSCRN 210. ,

, s $ 16  !

l

. ,1 W t . ss CRYSTAL RIVER ENERGY COMPLEX 15750 W. Power Line Street Crvstal River, Florida 34428-6708 . (352) 795-6486 A Florlds Progress Company 30 I

P' PDR l /kffk,yj!ffhfll

U

_ -j, _:-.

L U. S. Nuclear Regulatory Commission . '

' 3F0198 35 -

Page 2

. ..There are no new commitments made in this letter. .j 1f you-have any questions concerning this submittal, please_ contact Mr. David Kunsemiller,  :

Manager, Nuclear Licensing at (352) 563-4566.'  ;

Sincerely,L

{

1 R. E.' Graz Director Nuclear Regulatory Affairs

" REG / mal Attachment cc: . Regional Administrator, Region 11 Senior Resident Inspector

. NRR Project Manager T

4 r-

+ .y' .q s-h , .

p r

(4: .

s

^

f.

jg-' ]/1' -'

^

3 2;.

cr; _

- s r