ML20155K135

From kanterella
Jump to navigation Jump to search
EN-88-052:on 880616,notice of Proposed Imposition of Civil Penalty in Amount of $200,000 Will Be Issued to Licensee. Violation Based on Poor Corrective Actions & Poor Prior Performance in Area of Engineering & Technical Support
ML20155K135
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/13/1988
From: Lieberman J, Luehman J
NRC OFFICE OF ENFORCEMENT (OE)
To:
References
EA-88-104, EN-88-052, EN-88-52, NUDOCS 8806210119
Download: ML20155K135 (1)


Text

,

y .* . .D cs June 13, 1988 EN 88-52 0FFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Detroit Edison Company (EA 88-104)

(Fermi Unit 2)

Docket No. 50-341 Subject __: PROPOSED IMPOSITION OF CIVIL PENALTIES - $200,000 This is to inform the Commission that a Notice of Violation and Proposed Imposition of Civil Penalties in the amount of Two Hundred Thousand Dollars

($200,000) will be issued on or about June 16, 1988 to Detroit Edison Company.

This action is based on two problems, for each of which a $100,000 civil penalty is proposed. First, it was discovered that the licensee's containment isolation provisions for the primary containment radiation monitoring system was not consistent with the requirements of 10 CFR Part 50, Appendix A, General Design Criterion 56. Second, the licensee operated the Noninterruptable Air System in a degraded mode which led to the violation of two Technical Specifications. The escalation and mitigation factors of the Enforcement Policy were considered and in each case the civil penalty was escalated 100 percent. For the first problem the civil penalty was escalated 50 percent for poor corrective actions and 50 percent for poor prior performance in the area of engineering and technical support.

For the second problem the full amount of escalation was applied for poor prior performance in (1) the handling of out of service equipment required by Technical Specifications and (2) engineerircg and technical support.

It should be noted that the licensee has not been specifically informed of the enforcement action. The schedule of issuance and notification is:

Mailing of Notice June 16, 1988 Telephone Notification of Licensee June 16, 1988 The State of Michigan will be notified.

The licensee has thirty days from tc;e date of the Notice in which to respond.

Following NRC evaluation of the restonse, the civil penalty may be remitted, mitigated, or imposed by Order.  !

\

Contact:

J. Luehman, OE, 23280

  • J. Lieberman, OE, 20741 Distribution 0WFN // O o OWFN lOO MNBB CO Chairman Zech ED0 RM Comm. Roberts DEDRO AE00 Com. Carr NRR Comm. Rogers OE NMSS SECY OGC ACRS 01 CA SP Regignal Offices MAIL l

RI Vroo RIV V 00 ADM: Doc. Mgt. Br.

8806210119 880613 RII W o e RV y i o o PDR OIA 88N2 DCD Igo RES l PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL PUBLICLY ANNOUNCED 0,\

(

lE: 33