05000498/LER-1998-006, Forwards LER 98-006-01,re Failure to Fully Meet Requirements of TS Surveillance 4.0.5 for Containment Isolation Check Valves.Commitments Made by Util Are in Corrective Actions Section of LER

From kanterella
(Redirected from ML20154N780)
Jump to navigation Jump to search
Forwards LER 98-006-01,re Failure to Fully Meet Requirements of TS Surveillance 4.0.5 for Containment Isolation Check Valves.Commitments Made by Util Are in Corrective Actions Section of LER
ML20154N780
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 10/14/1998
From: Parkey G
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20154N785 List:
References
NOC-AE-000332, NOC-AE-332, NUDOCS 9810220091
Download: ML20154N780 (2)


LER-2098-006, Forwards LER 98-006-01,re Failure to Fully Meet Requirements of TS Surveillance 4.0.5 for Containment Isolation Check Valves.Commitments Made by Util Are in Corrective Actions Section of LER
Event date:
Report date:
4982098006R00 - NRC Website

text

.

.-4 '5,'

N Operat.ng ompany 3 saax:enpazas cauens.una naraw asmer raurrm m i October 14 1998 NOC-AE-00033,2 File No.: G26  ;

10CFR50.73 U. S. Nuclear Regulatory Commission

. Attention: Document ControlDesk Washingtot,DC 20555 l

J SouthTexas Project Unit 1 l

1 t Docket No. STN 50-498 l Licensee Event Report 98-006, Revision 1 Failure to Fully Meet the Requirements of Technical Specification

~ Surveillance 4.0.5 for Containment Isolation Check Valves 3

~

Pursuant to 10CFR50.73, the STP Nuclear Operating Company submits the attached revision to Unit 1

- Licensee Event Report 98-006 regarding a failure to fully meet the requirements of Technical Specification Surveillance'4.0.5 for contamment isolation check valves. Additional containment I isolation check valves have been identified in Unit 1 which had not been tested in the required safety {

function position within the required testing cycle. Revised sections are indicated by change bars. This i eveat did not have an adverse effect on the health and safety of the public.

. Licensee commitments are found in the corrective action section of tie attachment to this letter. If there are any questions on this matter, please contact Mr. S. M. Head at (512) 972-7136 or me at (512) 972-7800.

G. L. Parkey  :

Plant Manager Unit 1  !

ry l c<mn=n Q PLW/ .. 'i5 v 1 h, l

Attachment:

LER 98-006, Revision 1 (South Texas, Unit 1)

  • a 22gg gaaggg. , j s 1

. -amx.rxn L 1

i

<+

y,- ; .

NOC-AE-000332 File No.: G26 4 ' Page 2

~ c: Jon C. Wood. ~

JEllis W. Merschoff Matthews & Branscomb Regional Administrator, Region IV- .One. Alamo Center U. S. Nuclear Regulatory Commission 106 S. St. Mary's Street, Suite.700 1.611 Ryan Plaza Drive, Suite 400 San Antonio, TX .78205-3692

- Arlin'gton, TX 76011-8064 Institute of Nuclear Power Thomas'W. Alexion Operations - Records Center.

Project Manager, Mail Code 13H3. 700 Galleria Parkway U- L U. S. Nuclear Regulatory Commission Atlanta, GA 30339-5957 Washington, DC 20555-0001 Richard A. Ratliff Cornelius F. O'Keefe - Bureau of Radiation Control Sr. Resident Inspector Texas Department of Health .

' c/o U. S. Nuclear Regulatory Commission . I100 West 49th Street P. O, Box 910 '

Austin, TX 78756-3189 Bay City;TX 77404-0910 D. G. Tees /R. L. Balcom

- J. R. Newman, Esquire Houston Lighting & Power Co.

. Morgan, Lewis & Bockius- .P. O. Box 1700

' 1800 M. Street, N.W. Houston,TX 77251 Washington, DC 20036-5869-Central Power and Light Company M. T. Hardt/W. C. Gunst ATTN: G. E. Vaughn/C. A. Johnson

. City Public Service P, O. Box 289, Mail Code: N5012 P. O. Box 1771 Wadsworth,TX 77483

San Antonio,TX 78296

{

-- A. Ramirez/C. M. Canady Attention: Document Control Desk City of Austin Washington, D.C. 20555-0001 Electric' Utility Department

721 Barton Springs Road

' Austin,TX 78704  ;

l 1

1 l