05000498/LER-1998-003, Forwards LER 98-003-00,re Failure to Fully Meet Requirements of TSs Due to Inoperable CR Makeup & Cleanup Filtration Sys Exceeding Aot.Corrective Action Listed in Encl Is Only Licensee Commitment in Rept

From kanterella
Jump to navigation Jump to search
Forwards LER 98-003-00,re Failure to Fully Meet Requirements of TSs Due to Inoperable CR Makeup & Cleanup Filtration Sys Exceeding Aot.Corrective Action Listed in Encl Is Only Licensee Commitment in Rept
ML20237A005
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 08/05/1998
From: Parkey G
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20237A007 List:
References
NOC-AE-000244, NOC-AE-244, NUDOCS 9808130008
Download: ML20237A005 (2)


LER-2098-003, Forwards LER 98-003-00,re Failure to Fully Meet Requirements of TSs Due to Inoperable CR Makeup & Cleanup Filtration Sys Exceeding Aot.Corrective Action Listed in Encl Is Only Licensee Commitment in Rept
Event date:
Report date:
4982098003R00 - NRC Website

text

t

, .N pe

N south reasrwarecaecermungstarm na sum usatr icas77m l m August 5,1998 NOC-AE-000244 l File No.: G26 10CFR50.73 STI: 30675814 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington,DC 20555 South Texas Project Unit 1 Docket No. STN 50-498 Licensee Event Report 98-003 Failure to Fully Meet the Requirements of Technical Specifications Due to An Inopeiable Control Room Makeup and Cleanup Filtration System Exceeding An Allowed Outage Time Pursuant to 10CFR50.73, the STP Nuclear Operating Company submits the attached Unit 1 Licensee Event Report 98-003 regarding a failure to fully meet the requirements of Technical Specifications due to an inoperable Control Rcom Makeup and Cleanup Filtration System exceeding an allowed outage time. This event did not have an adverse effect on the health and safety of the public.

The corrective action listed in the attachment to this letter is the only licensee commitment in this report. If you should have any questions on this matter, please contact Mr.S.M. Head at (512) 972-7136 or me at (512) 972-7800.

e m-tn. G. L. Parkey Plant Manager, Unit i KJT/

I

Attachment:

LER 98-003 (South Texas, Unit 1)

1 9808130008 900805 PDR ADOCK 05000498 S PDR c:\wp\nl\nrc-wWer-980244. doc b0

9 NOC-AE-000244 File No.: G26 Page 2

. Ellis W. Merschoff Jon C. Wood Regional Administrator, Region IV Matthews & Branscomb U. S. Nuclear Regulatory Commission One Alamo Center 611 Ryan Plaza Drive, Suite 400 106 S. St. Mary's Street, Suite 700

Arlington,TX 7601i-8064 San Antonio,TX 78205-3692 Thomas W. Alexion Institute of Nuclear Power Project Manager, Mail Code 13H3 Operations - Records Center U. S. Nuclear Regulatory Commission 700 Galleria Parkway Washington, DC 20555-0001 Atlanta, GA 30339-5957 David P. Loveless Richard A. Ratiiff Sr. Resident Inspector Bureau of Radiation Control c/o U. S. Nuclear Regulatory Commission Texas Department of Health P. O. Box 910 - 1100 West 49th Street Bay City,TX 77404-0910 Austin, TX 78756-3189 J. R. Newman, Esquire D. G. Tees /R. L. Balcom Morgan, Lewis & Bockius Houston Lighting & Power Co.

1800 M. Street, N.W. P. O. Box 1700 Washington, DC 20036-5869 Houston,TX 77251 M. T. Hardt/W. C. Gunst Central Power and Light Company City Public Service ATTN: G. E. Vaughn/C. A. Johnson P. O. Box 1771 P. O. Box 289, Mail Code: N5012 San Antonio,TX 78296 Wadsworth,TX 77483 A. Ramirez/C. M. Canady U. S. Nuclear Regulatory Commission City of Austin Attention: Document Control Desk Electric Utility Department Washington, D.C. 20555-0001 721 Barton Springs Road Austin, TX ^ 78704 1

l-l

_. _ ._. . _ _ .