IR 05000327/1988011
ML20148E086 | |
Person / Time | |
---|---|
Site: | Sequoyah |
Issue date: | 03/03/1988 |
From: | Ennis J, Masnyk O, Mcguire D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
To: | |
Shared Package | |
ML20148E061 | List: |
References | |
50-327-88-11, 50-328-88-11, NUDOCS 8803240453 | |
Download: ML20148E086 (1) | |
Similar Documents at Sequoyah | |
---|---|
Category:INSPECTION REPORT
MONTHYEARIR 05000327/20240102024-12-19019 December 2024
[Table view]Design Basis Assurance Inspection (Programs) Inspection Report 05000327/2024010 and 05000328/2024010 IR 05000327/20240032024-11-0606 November 2024 Integrated Inspection Report 05000327/2024003 and 05000328/2024003 IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 IR 05000327/20240902024-03-19019 March 2024 NRC Inspection Report 05000327-2024090 and 05000328-2024090 and Preliminary Greater than Green Finding and Apparent Violation IR 05000327/20244012024-03-12012 March 2024 – Security Baseline Inspection Report 05000327/2024401 and 05000328/2024401 IR 05000259/20230062024-02-28028 February 2024 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1, 2 - Report 05000259/2023006, 05000260/2023006 and 05000296/2023006 IR 05000327/20230042024-02-12012 February 2024 Integrated Inspection Report 05000327/2023004 and 05000328/2023004 and Apparent Violation IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 IR 05000327/20230032023-11-0303 November 2023 – Integrated Inspection Report 05000327/2023003 and 05000328/2023003 IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 IR 05000327/20234032023-09-14014 September 2023 Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter) IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 IR 05000327/20230022023-07-31031 July 2023 Integrated Inspection Report 05000327/2023002 and 05000328/2023002 IR 05000327/20230102023-07-20020 July 2023 – Biennial Problem Identification and Resolution Inspection Report 05000327/2023010 and 05000328/2023010 ML23163A0392023-06-13013 June 2023 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000327/2023011, 05000328/2023011) and Request for Information (RFI) IR 05000327/20233012023-05-15015 May 2023 – NRC Operator License Examination Report 05000327/2023301 and 05000328/2023301 IR 05000327/20230012023-05-0202 May 2023 Integrated Inspection Report 05000327/2023001 and 05000328/2023001 and Exercise of Enforcement Discretion IR 05000327/20234412023-04-20020 April 2023 Final Significance Determination for a Security-Related Greater than Green Finding, Nov & Assessment Followup Letter, 05000327/2023441 & 05000328/2023441 IR 05000327/20234022023-04-13013 April 2023 Security Baseline Inspection Report 05000327/2023402 and 05000328/2023402 IR 05000327/20220062023-03-0101 March 2023 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2022006 and 05000328/2022006 IR 05000327/20234402023-02-13013 February 2023 – NRC Inspection Report 05000327/2023440 and 05000328/2023440; Preliminary Greater than Green and Apparent Violation Cover Letter IR 05000327/20220042023-02-10010 February 2023 Integrated Inspection Report 05000327/2022004 and 05000328/2022004 IR 05000327/20234012023-02-0606 February 2023 – Security Baseline Inspection Report 05000327/2023401 and 05000328/2023401 IR 05000327/20224402023-01-17017 January 2023 – Special Inspection Report 05000327/2022440 and 05000328/2022440 and Apparent Violation - Cover IR 05000327/20220032022-11-0707 November 2022 – Integrated Inspection Report 05000327/2022003 and 05000328/2022003 IR 05000327/20224012022-10-18018 October 2022 Material Control and Accounting Program Inspection Report 05000327/2022401 and 05000328/2022401 IR 05000327/20220052022-08-30030 August 2022 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327 2022005 and 05000328 2022005 - Final IR 05000327/20220022022-08-0101 August 2022 Integrated Inspection Report 05000327 2022002 and 05000328 2022002 IR 05000327/20223012022-07-21021 July 2022 Operator License Examination Report 05000327/2022301 and 05000328/2022301 IR 05000327/20220012022-05-11011 May 2022 Integrated Inspection Report 05000327/2022001, 05000328/2022001 and 07200034/2010002 IR 05000327/20220102022-04-25025 April 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000327/2022010 and 05000328/2022010 IR 05000327/20224022022-03-28028 March 2022 Security Baseline Inspection Report 05000327/2022402 and 05000328/2022402 IR 05000327/20210062022-03-0202 March 2022 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - (Report No. 05000327/2021006 and 05000328/2021006) IR 05000327/20210042022-02-0707 February 2022 Integrated Inspection Report 05000327/2021004 and 05000328/2021004 IR 05000327/20210032021-11-10010 November 2021 Integrated Inspection Report 05000327/2021003 and 05000328/2021003 and Apparent Violation and Exercise of Enforcement Discretion IR 05000327/20210052021-08-18018 August 2021 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2021005 and 05000328/2021005 IR 05000327/20210022021-07-27027 July 2021 Integrated Inspection Report 05000327/2021002 and 05000328/2021002 IR 05000327/20210112021-07-19019 July 2021 Biennial Problem Identification and Resolution Inspection Report 05000327/2021011 and 05000328/2021011 IR 05000327/20210012021-04-27027 April 2021 Integrated Inspection Report 05000327/2021001 and 05000328/2021001 IR 05000327/20214012021-04-21021 April 2021 NRC Inspection Report 05000327/2021401 and 05000328/2021401 (U) IR 05000327/20210102021-04-21021 April 2021 NRC Inspection Report 05000327/2021010 and 05000328/2021010 IR 05000327/20200062021-03-0303 March 2021 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2020006 and 05000328/2020006 IR 05000327/20200042021-01-29029 January 2021 Integrated Inspection Report 05000327/2020004 and 05000328/2020004 IR 05000327/20204202020-11-20020 November 2020 Security Inspection Report 05000327/2020420 and 05000328/2020420 ML20321A2102020-11-20020 November 2020 Security Inspection Report 05000327/2020420 and 05000328/2020420 - Cover Letter 2024-08-26 Category:NRC-GENERATED MONTHYEARIR 05000327/19990051999-09-27027 September 1999
[Table view]Insp Repts 50-327/99-05 & 50-328/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Mitigating Sys IR 05000327/19990041999-08-13013 August 1999 Insp Repts 50-327/99-04 & 50-328/99-04 on 990601-0717.One Potentially Safety Significant Issue Noted.Major Areas Inspected:Licensee Emergency Preparedness IR 05000327/19990031999-06-30030 June 1999 Insp Repts 50-327/99-03 & 50-328/99-03 on 990328-0531.Non- Cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19990021999-04-23023 April 1999 Insp Repts 50-327/99-02 & 50-328/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000327/19990011999-03-15015 March 1999 Insp Repts 50-327/99-01 & 50-328/99-01 on 990103-0213. Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19980111999-02-0101 February 1999 Insp Repts 50-327/98-11 & 50-328/98-11 on 981122-990102. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000327/19980101998-12-0707 December 1998 Insp Repts 50-327/98-10 & 50-328/98-10 on 981011-1121.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000327/19980141998-12-0404 December 1998 Insp Repts 50-327/98-14 & 50-328/98-14 on 981102-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Sequoyah Nuclear Plan IR 05000327/19980131998-11-24024 November 1998 Insp Repts 50-327/98-13 & 50-328/98-13 on 980914-1016. Violations Noted.Major Areas Inspected:Aspects of Licensee maint,testing,engineering,self-assessment & Problem Evaluations of Licensee Ice Condenser Sys IR 05000327/19980091998-11-0909 November 1998 Insp Repts 50-327/98-09 & 50-328/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19980081998-09-18018 September 1998 Insp Repts 50-327/98-08 & 50-328/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Licensee Conducted Radiological Emergency Plan Drill IR 05000327/19980071998-08-0404 August 1998 Insp Repts 50-327/98-07 & 50-328/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Aspects of Licensee Operation,Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Preventing Problems IR 05000327/19980061998-06-26026 June 1998 Insp Repts 50-327/98-06 & 50-328/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000327/19980051998-06-12012 June 1998 Insp Repts 50-327/98-05 & 50-328/98-05 on 980504-08.No Violations Noted.Major Areas Inspected:Maint Procedure.Insp Team Comprised Region II & Headquarters Personnel.Switchgear & Surrounding Areas Found in Good Matl Condition IR 05000327/19980031998-04-10010 April 1998 Insp Repts 50-327/98-03 & 50-328/98-03 on 980201-0314. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000327/19980011998-03-30030 March 1998 Insp Repts 50-327/98-01 & 50-328/98-01 on 980126-0213.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000327/19980021998-03-0505 March 1998 Insp Repts 50-327/98-02 & 50-328/98-02 on 980202-06.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations & Maint.Review of Initial & Requalification Training Programs Were Also Conducted IR 05000327/19970181998-02-19019 February 1998 Insp Repts 50-327/97-18 & 50-328/97-18 on 971221-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Resolving Problems IR 05000327/19970171998-01-16016 January 1998 Insp Repts 50-327/97-17 & 50-328/97-17 on 971109-1220.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970141997-12-0808 December 1997 Insp Repts 50-327/97-14 & 50-328/97-14 on 970928-1108.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support,Effectiveness of License Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970161997-12-0505 December 1997 Insp Repts 50-327/97-16 & 50-328/97-16 on 971103-06.No Violations Noted.Major Areas Inspected:Evaluation of 971017 Wire Damage Event at Electrical Penetration 22 IR 05000327/19970121997-10-24024 October 1997 Insp Repts 50-327/97-12 & 50-328/97-12 on 970824-0927.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support & Operator Requalification Program IR 05000327/19970151997-10-23023 October 1997 Insp Repts 50-327/97-15 & 50-328/97-15 on 970922-29.No Violations Noted.Major Areas Inspected:Emergency Preparedness ML20198H7911997-09-11011 September 1997 Insp Repts 50-327/97-13 & 50-328/97-13 on 970725-0904. Violations Noted.Major Areas Inspected:Insp Scope,Event Synopsis & Observations & Findings IR 05000327/19970061997-07-28028 July 1997 Insp Repts 50-327/97-06 & 50-328/97-06 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000327/19970071997-07-24024 July 1997 Insp Repts 50-327/97-07 & 50-328/97-07 on 970623-27. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support ML20141G0441997-06-20020 June 1997 Insp Repts 50-327/97-04 & 50-328/97-04 on 970413-0524. Violations Noted.Major Areas Inspected:Operations Re Physics Testing,Maint,Engineering & Plant Support ML20148F9631997-05-27027 May 1997 Special Insp Repts 50-327/97-05 & 50-328/97-05 on 970324-0522.Violations Noted.Major Areas Inspected:Events Associated W/Unit 1 Inadvertent RCS Drain Down on 970324 ML20141C9881997-05-12012 May 1997 Insp Repts 50-327/97-03 & 50-328/97-03 on 970302-0412. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000327/19970021997-03-24024 March 1997 Insp Repts 50-327/97-02 & 50-328/97-02 on 970203-14.No Violations Noted.Major Areas Inspected:Detailed Reviews of Corrective Actions 14-1,14-2,14-3,15 & 16 ML20137F7081997-03-18018 March 1997 Insp Repts 50-327/97-01 & 50-328/97-01 on 970119-0301. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Preventing Problems IR 05000327/19960171997-02-14014 February 1997 Insp Repts 50-327/96-17 & 50-328/96-17 on 961208-970118.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering,Plant Support & Plant Status ML20134G1851997-01-13013 January 1997 Insp Repts 50-327/96-16 & 50-328/96-16 on 960923-1219. Violations Noted.Major Areas Inspected:Review of Corrective Actions Implemented for Problem Evaluation Repts IR 05000327/19960141996-12-31031 December 1996 Insp Repts 50-327/96-14 & 50-328/96-14 on 961027-1207.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000327/19960151996-12-23023 December 1996 Insp Repts 50-327/96-15 & 50-328/96-15 on 961104-08.No Violations Noted.Major Areas Inspected:Control Room Simulator,Tsc,Osc,Cecc & Joint Info Ctr of Biennial Emergency Preparedness Exercise ML20134Q1721996-11-25025 November 1996 Insp Repts 50-327/96-13 & 50-328/96-13 on 960919-1102. Violations Noted.Major Areas Inspected:Events Associated W/Reactor Shutdown & Subsequent Manual Tripping of Unit 2 on 961011 IR 05000327/19960111996-11-19019 November 1996 Insp Repts 50-327/96-11 & 50-328/96-11 on 960915-1026. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support, & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems ML20129A2141996-10-10010 October 1996 Insp Repts 50-327/96-09 & 50-328/96-09 on 960728-0914. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H8021996-09-27027 September 1996 Insp Repts 50-327/96-10 & 50-328/96-10 on 960708,10-12 & 0819-22.Non Cited Violations Noted.Major Areas Inspected: Plant FP Program & Action Taken of Insp Findings Previously Identified IR 05000328/20060151995-06-15015 June 1995 Insp Repts 50-387/95-08 & 50-388/95-08 on 950328-0615. Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Engineering & Plant Support.Initiatives Selected for Insp Plant Mgt Walkdowns IR 05000327/19940091994-05-0202 May 1994 Resident Insp Repts 50-327/94-09 & 50-328/94-09 on 940306- 0402.Violations Noted.Major Areas Inspected:Plant Operations,Plant Maint,Plant Surveillance,Evaluation of Licensee self-assessment Capability & LER Closeout IR 05000327/19940111994-04-29029 April 1994 Partially Withheld Insp Repts 50-327/94-11 & 50-328/94-11 on 940328-0401,per 10CFR73.21.No Violations Identified.Major Areas Inspected:Physical Security Program for Power Reactors,Alarm Stations,Assessment Aids & Testing & Maint IR 05000327/19930521993-12-23023 December 1993 Insp Repts 50-327/93-52 & 50-328/93-52 on 931107-1204. Violations Noted.Major Areas Inspected:Plant Operations, Maint,Plant Surveillance,Evaluation of Licensee self-assessment Capability & LER Closeout IR 05000327/19930371993-12-17017 December 1993 Insp Repts 50-327/93-37 & 50-328/93-37 on 931115-19. Violations Noted.Major Areas Inspected:Operator Requalification Program,Exam Development & Administration & Training Staff Qualifications & Training IR 05000327/19930531993-12-17017 December 1993 Insp Repts 50-327/93-53 & 50-328/93-53 on 931115-19.No Violations Noted.Major Areas Inspected:Meteorological Monitoring,Control Room Emergency Ventilation,Audits & Secondary Water Chemistry IR 05000327/19930511993-12-13013 December 1993 Partially Withheld Insp Repts 50-327/93-51 & 50-328/93-51 on 931115-19 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Implementing Procedures & Security Program Audit IR 05000327/19930501993-11-24024 November 1993 Insp Repts 50-327/93-50 & 50-328/93-50 on 931011-1106. Violations Noted.Major Areas Inspected:Plant Operations, Plant Maintenance,Plant Surveillance,Evaluation of Licensee self-assessment Capability & LER Closeout IR 05000327/19930421993-11-0909 November 1993 Insp Repts 50-327/93-42 & 50-328/93-42 on 930904-1010. Violations Noted.Major Areas Inspected:Plant Operations, Maint & Surveillance,Evaluation of Licensee self-assessment Capability & Licensee Event Rept Closeout IR 05000327/19930481993-11-0909 November 1993 Insp Repts 50-327/93-48 & 50-328/93-48 on 931006-08. Violation Noted.Major Areas Inspected:Qualifications of Acting Lab Supervisor,Use of Expired Stds in Alcohol breath-analysis Equipment & Testing Lab Procedures IR 05000327/19930491993-11-0202 November 1993 Insp Repts 50-327/93-49 & 50-328/93-49 on 930929-1004.No Violations Noted.Major Areas Inspected:Civil/Structural Items Which Will Remain Open After Restart 1999-09-27 Category:INSPECTION REPORT MONTHYEARIR 05000327/20240102024-12-19019 December 2024
[Table view]Design Basis Assurance Inspection (Programs) Inspection Report 05000327/2024010 and 05000328/2024010 IR 05000327/20240032024-11-0606 November 2024 Integrated Inspection Report 05000327/2024003 and 05000328/2024003 IR 05000327/20250102024-10-29029 October 2024 Notification of Sequoyah, Units 1 and 2 - Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000327/2025010 and 05000328/2025010 IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 IR 05000327/20240902024-03-19019 March 2024 NRC Inspection Report 05000327-2024090 and 05000328-2024090 and Preliminary Greater than Green Finding and Apparent Violation IR 05000327/20244012024-03-12012 March 2024 – Security Baseline Inspection Report 05000327/2024401 and 05000328/2024401 IR 05000259/20230062024-02-28028 February 2024 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1, 2 - Report 05000259/2023006, 05000260/2023006 and 05000296/2023006 IR 05000327/20230042024-02-12012 February 2024 Integrated Inspection Report 05000327/2023004 and 05000328/2023004 and Apparent Violation IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 IR 05000327/20230032023-11-0303 November 2023 – Integrated Inspection Report 05000327/2023003 and 05000328/2023003 IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 IR 05000327/20234032023-09-14014 September 2023 Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter) IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 IR 05000327/20230022023-07-31031 July 2023 Integrated Inspection Report 05000327/2023002 and 05000328/2023002 IR 05000327/20230102023-07-20020 July 2023 – Biennial Problem Identification and Resolution Inspection Report 05000327/2023010 and 05000328/2023010 ML23163A0392023-06-13013 June 2023 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000327/2023011, 05000328/2023011) and Request for Information (RFI) IR 05000327/20233012023-05-15015 May 2023 – NRC Operator License Examination Report 05000327/2023301 and 05000328/2023301 IR 05000327/20230012023-05-0202 May 2023 Integrated Inspection Report 05000327/2023001 and 05000328/2023001 and Exercise of Enforcement Discretion IR 05000327/20234412023-04-20020 April 2023 Final Significance Determination for a Security-Related Greater than Green Finding, Nov & Assessment Followup Letter, 05000327/2023441 & 05000328/2023441 IR 05000327/20234022023-04-13013 April 2023 Security Baseline Inspection Report 05000327/2023402 and 05000328/2023402 IR 05000327/20220062023-03-0101 March 2023 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2022006 and 05000328/2022006 IR 05000327/20234402023-02-13013 February 2023 – NRC Inspection Report 05000327/2023440 and 05000328/2023440; Preliminary Greater than Green and Apparent Violation Cover Letter IR 05000327/20220042023-02-10010 February 2023 Integrated Inspection Report 05000327/2022004 and 05000328/2022004 IR 05000327/20234012023-02-0606 February 2023 – Security Baseline Inspection Report 05000327/2023401 and 05000328/2023401 IR 05000327/20224402023-01-17017 January 2023 – Special Inspection Report 05000327/2022440 and 05000328/2022440 and Apparent Violation - Cover IR 05000327/20220032022-11-0707 November 2022 – Integrated Inspection Report 05000327/2022003 and 05000328/2022003 IR 05000327/20224012022-10-18018 October 2022 Material Control and Accounting Program Inspection Report 05000327/2022401 and 05000328/2022401 IR 05000327/20220052022-08-30030 August 2022 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327 2022005 and 05000328 2022005 - Final IR 05000327/20220022022-08-0101 August 2022 Integrated Inspection Report 05000327 2022002 and 05000328 2022002 IR 05000327/20223012022-07-21021 July 2022 Operator License Examination Report 05000327/2022301 and 05000328/2022301 IR 05000327/20220012022-05-11011 May 2022 Integrated Inspection Report 05000327/2022001, 05000328/2022001 and 07200034/2010002 IR 05000327/20220102022-04-25025 April 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000327/2022010 and 05000328/2022010 IR 05000327/20224022022-03-28028 March 2022 Security Baseline Inspection Report 05000327/2022402 and 05000328/2022402 IR 05000327/20210062022-03-0202 March 2022 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - (Report No. 05000327/2021006 and 05000328/2021006) IR 05000327/20210042022-02-0707 February 2022 Integrated Inspection Report 05000327/2021004 and 05000328/2021004 IR 05000327/20210032021-11-10010 November 2021 Integrated Inspection Report 05000327/2021003 and 05000328/2021003 and Apparent Violation and Exercise of Enforcement Discretion IR 05000327/20210052021-08-18018 August 2021 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2021005 and 05000328/2021005 IR 05000327/20210022021-07-27027 July 2021 Integrated Inspection Report 05000327/2021002 and 05000328/2021002 IR 05000327/20210112021-07-19019 July 2021 Biennial Problem Identification and Resolution Inspection Report 05000327/2021011 and 05000328/2021011 IR 05000327/20210012021-04-27027 April 2021 Integrated Inspection Report 05000327/2021001 and 05000328/2021001 IR 05000327/20214012021-04-21021 April 2021 NRC Inspection Report 05000327/2021401 and 05000328/2021401 (U) IR 05000327/20210102021-04-21021 April 2021 NRC Inspection Report 05000327/2021010 and 05000328/2021010 IR 05000327/20200062021-03-0303 March 2021 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2020006 and 05000328/2020006 IR 05000327/20200042021-01-29029 January 2021 Integrated Inspection Report 05000327/2020004 and 05000328/2020004 IR 05000327/20204202020-11-20020 November 2020 Security Inspection Report 05000327/2020420 and 05000328/2020420 ML20321A2102020-11-20020 November 2020 Security Inspection Report 05000327/2020420 and 05000328/2020420 - Cover Letter 2024-08-26 Category:UTILITY MONTHYEARIR 05000327/19900341990-11-16016 November 1990
[Table view]Insp Repts 50-327/90-34 & 50-328/90-34 on 901006-1105.One Violation & One Apparent Violation Noted.Major Areas Inspected:Operational Safety Verification Including Control Room Observations & Sys Lineups IR 05000327/19900361990-11-0909 November 1990 Augmented Insp Team Repts 50-327/90-36 & 50-328/90-36 on 901011-19.Insp Included Review of Events That Led to Discovery of Multiple Failures of Main Steam Check Valves on 901008 IR 05000327/19900321990-11-0101 November 1990 Insp Repts 50-327/90-32 & 50-328/90-32 on 900906-1005. Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Control Room Observations,Operations Performance,Sys Lineups & Radiation Protection IR 05000327/19900331990-10-31031 October 1990 Insp Repts 50-327/90-33 & 50-328/90-33 on 901009-12.No Violations or Deviations Identified.Major Areas Inspected: Emergency Preparedness Program:Emergency Detection & Classification,Protective Action decision-making IR 05000327/19900291990-10-0505 October 1990 Insp Repts 50-327/90-29 & 50-328/90-29 on 900827-31. Violation Noted.Major Areas Inspected:Measurement of Incore Power Distributions,Calibr of Nuclear Instruments, Measurement of Thermal Power & Followup of LERs IR 05000327/19900311990-09-26026 September 1990 Insp Repts 50-327/90-31 & 50-328/90-31 on 900910-14.No Violations or Deviations Noted.Major Areas Inspected: Occupational Exposure During Extended Outages & Licensee Actions to Correct Previously Identified Weaknesses IR 05000327/19900261990-08-30030 August 1990 Insp Repts 50-327/90-26 & 50-328/90-26 on 900706-0805. Violations Noted But Not Cited.Major Areas Inspected:Control Room Observations,Operations Performance,Sys Lineups, Radiation Protection & Safeguards ML20059H0431990-08-21021 August 1990 Insp Repts 50-327/90-23 & 50-328/90-23 on 900625-29.No Violations or Deviations Noted.Weaknesses in Program Implementation Noted.Major Areas Inspected:Plant Program to Maintain Occupational Dose to Workers ALARA IR 05000327/19900211990-07-31031 July 1990 Insp Repts 50-327/90-21 & 50-328/90-21 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Response Exercise IR 05000327/19900201990-06-29029 June 1990 Insp Repts 50-327/90-20 & 50-328/90-20 on 900506-0605.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety Verification,Including Control Room Observations,Operations Performance & Sys Lineups IR 05000327/19900191990-05-21021 May 1990 Insp Repts 50-327/90-19 & 50-328/90-19 on 900423-27.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Activities,Including Review of Licensee Organization & Mgt Controls & Training IR 05000327/19900131990-05-21021 May 1990 Insp Repts 50-327/90-13 & 50-328/90-13 on 900423-27.No Violations or Deviations Noted.Major Areas Inspected: Emergency Facilities,Equipment,Instrumentation,Supplies, Organization & Mgt Control & Independent Review/Audits ML20043A5271990-05-16016 May 1990 Insp Repts 50-327/90-17 & 50-328/90-17 on 900406-0505. Violations Noted.Major Areas Inspected:Control Room Observations,Sys Lineups,Radiation Protection,Safeguards, Surveillance Testing & Followup to Generic Ltr 88-17 IR 05000327/19900141990-05-0303 May 1990 Insp Repts 50-327/90-14 & 50-328/90-14 on 900326-30 & 0409-13.Violations Noted.Major Areas Inspected:Inservice Testing,Containment Integrity & Followup on Previous Insp Findings IR 05000327/19900111990-04-25025 April 1990 Insp Repts 50-327/90-11 & 50-328/90-11 on 900306-0405. Violations Noted.Major Areas Inspected:Control Room Observations,Operations Performance,Sys Lineups,Radiation Protection,Safeguards & Housekeeping Insps ML20034C4651990-04-25025 April 1990 Partially Withheld Insp Repts 50-327/90-15 & 50-328/90-15 on 900326-30 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Physical Security Program Including, Inspector Reviewed Barriers & Detection Aids IR 05000327/19900161990-04-12012 April 1990 Partially Withheld Insp Repts 50-327/90-16 & 50-328/90-16 on 900326-30.No Violations or Deviations Noted.Major Areas Inspected:Review of Procedures,Records,Operations & Physical Inventory,Control & Accountability of SNM IR 05000327/19900121990-04-10010 April 1990 Insp Repts 50-327/90-12 & 50-328/90-12 on 900326-30.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp (Isi),Including Review of NDE Procedures,Isi Plan for Outage & Observations of in Progress NDE Exams IR 05000327/19900081990-04-0404 April 1990 Insp Repts 50-327/90-08 & 50-328/90-08 on 900226-0302.No Violations Noted.Several Examples of Corrective Action Procedure Ambiguities Noted.Major Areas Inspected: Operational Events & Employee Concerns Program IR 05000327/19900071990-04-0303 April 1990 Insp Repts 50-327/90-07 & 50-328/90-07 on 900226-0302.No Violations or Deviations Noted.Major Areas Inspected: Radiological Effluents & Waste Treatment,Radiological Environ Monitoring & Primary & Secondary Water Chemistry IR 05000327/19900031990-03-14014 March 1990 Insp Repts 50-327/90-03 & 50-328/90-03 on 900105-0205.No Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observations,Surveillance Testing Observations,Review of Insp Findings & Followup of Events IR 05000327/19900021990-03-0909 March 1990 Insp Repts 50-327/90-02 & 50-328/90-02 on 900122-26. Violations Noted.Major Areas Inspected:Design Changes & Mods,Procurement & Licensee Action on Previously Identified Findings ML20033F3361990-02-22022 February 1990 Partially Withheld Insp Repts 50-327/90-05 & 50-328/90-05 on 900130-0202.Violations Noted.Major Areas Inspected: Routine,Unannounced Insp of Licensee Physical Security Program of Power Reactors Including,Plans,Audits & Maint IR 05000327/19900041990-02-14014 February 1990 Insp Repts 50-327/90-04 & 50-328/90-04 on 900122-26.No Violations Noted.Major Areas Inspected:Radiation Protection Program & pre-outage Activities for Radiation Protection Program.Licensee Identified Violation Cited IR 05000327/19890291990-01-31031 January 1990 Insp Repts 50-327/89-29 & 50-328/89-29 on 891205-900109. Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Control Room Observations,Safeguards, Radiation Protection & Sys Lineups IR 05000327/19890281990-01-26026 January 1990 Insp Repts 50-327/89-28 & 50-328/89-28 on 891113-17. Violation Noted Re Failure to Source Check Effluent Gas Monitors Per Tech Specs.Major Areas Inspected:Radiological Effluents & Waste Treatment,Water Chemistry & QA IR 05000327/19890271990-01-0202 January 1990 Insp Repts 50-327/89-27 & 50-328/89-27 on 891106-1205. Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Control Room Observations,Operations Performance,Sys Lineups,Radiation Protection & Safeguards IR 05000327/19890251989-12-0505 December 1989 Insp Repts 50-327/89-25 & 50-328/89-25 on 891006-1108. Violations Noted.Major Areas Inspected:Operational Safety Verification Including Control Room Observations,Operations Performance,Sys Lineups,Radiation Protection & Safeguards IR 05000327/19890261989-11-0909 November 1989 Insp Repts 50-327/89-26 & 50-328/89-26 on 891023-27.No Violations or Deviations Noted.Major Areas Inspected: Allegation Followup to Establish Validity & to Verify Corrective Actions Implemented for Invalid Allegations IR 05000327/19890231989-11-0808 November 1989 Insp Repts 50-327/89-23 & 50-328/89-23 on 891002-06.No Violations or Deviations Noted.Major Areas Inspected:Fire Prevention/Fire Protection IR 05000327/19890221989-11-0707 November 1989 Insp Repts 50-327/89-22 & 50-328/89-22 on 890906-1005.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety Verification Including Control Room Observations,Operations Performance & Sys Lineups IR 05000327/19890241989-10-25025 October 1989 Insp Repts 50-327/89-24 & 50-328/89-24 on 890927-29.No Violations Noted.Major Areas Inspected:Radiation Protection Program,Followup on Previous Inspector Identified Items & Employee Safety Concerns IR 05000327/19890201989-08-29029 August 1989 Insp Repts 50-327/89-20 & 50-328/89-20 on 890717-20.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Exercise,Including Staffing & Response of Emergency Organizations in Control Room & Support Ctrs IR 05000327/19890141989-08-28028 August 1989 Insp Repts 50-327/89-14 & 50-328/89-14 on 890424-28. Violations Noted.Major Areas Inspected:Surveillance & Operational Records & Procedures.Discussions Held W/ Operations,Engineering & Transmissions Personnel IR 05000327/19890191989-08-25025 August 1989 Insp Repts 50-327/89-19 & 50-328/89-19 on 890706-0805. Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Control Room Observations,Operations Performance,Sys Lineups & Radiation Protection ML20245L3191989-08-0101 August 1989 Insp Repts 50-327/89-11 & 50-328/89-11 on 890626-30. Violations Noted.Major Areas Inspected:Radiation Protection Program,Follow Up on Previous Inspector Identified Items & IE Info Notices IR 05000327/19890171989-07-28028 July 1989 Partially Withheld Safeguards Insp Repts 50-327/89-17 & 50-328/89-17 on 890522-26 (Ref 10CFR2.790(d) & 73.21)). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Protected Area Alarms ML20246B6511989-06-26026 June 1989 Insp Repts 50-327/89-15 & 50-328/89-15 on 890506-0605. Violations Noted.Major Areas Inspected:Operational Safety Verification,Operations Performance,Sys Lineups,Radiation Protection,Safeguards & Housekeeping Insps ML20245D4191989-06-14014 June 1989 Insp Repts 50-327/89-16 & 50-328/89-16 on 890508-12. Violation Noted.Major Areas Inspected:Review of Completed Unit 2,Cycle 4 Initial Criticality & Post Refueling Start Up Tests & Evaluation of Thermal Power Measurements for Unit 1 IR 05000327/19890121989-05-24024 May 1989 Insp Repts 50-327/89-12 & 50-328/89-12 on 890406-0505. Violation Noted.Major Areas Inspected:Radiation Protection, Safeguards & Operational Safety Verification,Including Control Room Observations & Operational Performance IR 05000327/19890131989-05-16016 May 1989 Insp Repts 50-327/89-13 & 50-328/89-13 on 890417-21.No Violations or Deviations Noted.Major Areas Inspected: Emergency Preparedness,Including Review of Programmatic Elements & Radiological Emergency Plan & Training IR 05000327/19890101989-05-0404 May 1989 Insp Repts 50-327/89-10 & 50-328/89-10 on 890316-20.No Violations or Deviations Noted.Major Areas Inspected: Containment Integrated Leak Rate Testing,Review of Test Procedures & Evaluation of Test Results ML20246K0751989-05-0303 May 1989 Insp Repts 50-327/89-09 & 50-328/89-09 on 890305-0405. Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Operations Performance,Sys Lineups, Radiation Protection,Safeguards & Housekeeping Insps IR 05000327/19890071989-04-13013 April 1989 Insp Repts 50-327/89-07 & 50-328/89-07 on 890205-0304. Violations Noted.Major Areas Inspected:Operational Safety Verification,Including Operations Performance,Sys Lineups, Radiation Protection,Safeguards & Housekeeping ML20244C3911989-04-0404 April 1989 Insp Repts 50-327/88-50 & 50-328/88-50 on 881212-890126. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance & Sys Outage Control,Corrective Action Program, Maint Activities & Qualified Reviewer Process IR 05000327/19890051989-03-13013 March 1989 Special Team Insp Repts 50-327/89-05 & 50-328/89-05 on 890131-0209.Violations Noted.Major Areas Inspected:Radwaste, Radiological Controls,Corporate QA Audits & Site Chemistry ML20247F3461989-03-13013 March 1989 Special Team Insp Repts 50-327/89-05 & 50-328/89-05 on 890131-0209.Violations Noted.Major Areas Inspected:Radwaste, Radiological Controls,Corporate QA Audits & Site Chemistry IR 05000327/19890061989-03-10010 March 1989 Partially Withheld Insp Repts 50-327/89-06 & 50-328/89-06 on 890123-27 (Ref 10CFR2.790(d) & 73.21).Violation Noted.Major Areas Inspected:Physical Security Program for Reactors, Including Security Mgt,Audit,Barriers,Alarms & Maint IR 05000327/19890021989-03-0909 March 1989 Insp Repts 50-327/89-02 & 50-328/89-02 on 890105-0204.No Violations or Deviations Noted.Major Areas Inspected: Operational Safety Verification Including,Operations Performance,Sys Lineups & Radiation Protection IR 05000327/19890081989-03-0303 March 1989 Insp Repts 50-327/89-08 & 50-328/89-08 on 890213-17. Violations Noted.Major Areas Inspected:Inservice Insp, Including Eddy Current Exam of Unit 2 Steam Generator Tubing,Reviews of NDE Exams Procedures & Exam Verifications 1990-09-26 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000327/19990051999-09-27027 September 1999
[Table view]Insp Repts 50-327/99-05 & 50-328/99-05 on 990718-0828. Violations Noted.Major Areas Inspected:Mitigating Sys IR 05000327/19990041999-08-13013 August 1999 Insp Repts 50-327/99-04 & 50-328/99-04 on 990601-0717.One Potentially Safety Significant Issue Noted.Major Areas Inspected:Licensee Emergency Preparedness IR 05000327/19990031999-06-30030 June 1999 Insp Repts 50-327/99-03 & 50-328/99-03 on 990328-0531.Non- Cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19990021999-04-23023 April 1999 Insp Repts 50-327/99-02 & 50-328/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering IR 05000327/19990011999-03-15015 March 1999 Insp Repts 50-327/99-01 & 50-328/99-01 on 990103-0213. Violations Noted & Being Treated as non-cited Violations. Major Areas Inspected:Aspects of Licensee Operations,Maint & Engineering IR 05000327/19983021999-03-12012 March 1999 NRC Operator Licensing Exam Repts 50-327/98-302 & 50-328/98-302 (Including Completed & Graded Tests) for Test Administered on 980928-1001 IR 05000327/19980111999-02-0101 February 1999 Insp Repts 50-327/98-11 & 50-328/98-11 on 981122-990102. Violations Noted.Major Areas Inspected:Licensee Operations, Maint & Engineering ML20202J5471999-02-0101 February 1999 Notice of Violation from Insp on 981122-990102.Violation Noted:Following Unit 1 RT on 981109,procedural Requirements of EOP ES0.1 Were Not Properly Implemented,In That RCS Temperatures Were Not Monitored & Steam Not Dumped IR 05000327/19980101998-12-0707 December 1998 Insp Repts 50-327/98-10 & 50-328/98-10 on 981011-1121.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000327/19980141998-12-0404 December 1998 Insp Repts 50-327/98-14 & 50-328/98-14 on 981102-06.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise for Sequoyah Nuclear Plan ML20196D6081998-11-24024 November 1998 Notice of Violation from Insp on 980914-1016.Violation Noted:As of 980916,requirements of 0-MI-MXX-061-001 Not Implemented IR 05000327/19980131998-11-24024 November 1998 Insp Repts 50-327/98-13 & 50-328/98-13 on 980914-1016. Violations Noted.Major Areas Inspected:Aspects of Licensee maint,testing,engineering,self-assessment & Problem Evaluations of Licensee Ice Condenser Sys ML20195G5521998-11-0909 November 1998 Notice of Violation from Insp on 980830-1010.Violation Noted:Licensee Failed to Assure That All Testing Required to Demonstrate That Safety Related Circuit Breakers Would Perform Satisfactorily in Svc IR 05000327/19980091998-11-0909 November 1998 Insp Repts 50-327/98-09 & 50-328/98-09 on 980830-1010. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19980081998-09-18018 September 1998 Insp Repts 50-327/98-08 & 50-328/98-08 on 980719-0829.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Licensee Conducted Radiological Emergency Plan Drill ML20237B1851998-08-0404 August 1998 Notice of Violation from Insp on 980606-0718.Violations Noted:On or Before 971103,conditions Adverse to Qualify Were Not Promptly Identified & Corrected,In That Licensee Failed to Correct &/Or Initiate Problem Evaluation Rept IR 05000327/19980071998-08-0404 August 1998 Insp Repts 50-327/98-07 & 50-328/98-07 on 980607-0718. Violations Noted.Major Areas Inspected:Aspects of Licensee Operation,Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Preventing Problems IR 05000327/19980061998-06-26026 June 1998 Insp Repts 50-327/98-06 & 50-328/98-06 on 980426-0606. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20236J6591998-06-26026 June 1998 Notice of Violation from Insp on 980426-0606.Violation Noted:Inservice Testing of Valves Not in Accordance with Section XI of ASME Boiler & Pressure Vessel Code & Applicable Addenda as Required by 10CFR50.55a IR 05000327/19983001998-06-25025 June 1998 NRC Operator Licensing Exam Repts 50-327/98-300 & 50-328/98-300 (Including Completed & Graded Tests) for Tests Administered on 980601-02 IR 05000327/19980051998-06-12012 June 1998 Insp Repts 50-327/98-05 & 50-328/98-05 on 980504-08.No Violations Noted.Major Areas Inspected:Maint Procedure.Insp Team Comprised Region II & Headquarters Personnel.Switchgear & Surrounding Areas Found in Good Matl Condition ML20247L5781998-05-15015 May 1998 Notice of Violation from Insp on 980315-0425.Violation Noted:Licensee Failed to Perform Surveillance Requirement 4.8.1.1.1.a,within 1 H & at Least Once Per 8 H Thereafter ML20216H7701998-04-10010 April 1998 Notice of Violation from Insp on 980201-0314.Violation Noted:License Failed to Rept an Adverse Condition on Work Request/Work Order &/Or Problem Evaluation Rept IR 05000327/19980031998-04-10010 April 1998 Insp Repts 50-327/98-03 & 50-328/98-03 on 980201-0314. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000327/19980991998-04-0101 April 1998 SALP Repts 50-327/98-99 & 50-328/98-99 for Period 960728- 980221 IR 05000327/19980011998-03-30030 March 1998 Insp Repts 50-327/98-01 & 50-328/98-01 on 980126-0213.No Violations Noted.Major Areas Inspected:Operations,Maint & Engineering ML20217K3751998-03-30030 March 1998 Notice of Violation from Insp on 980126-0213.Violation Noted:On Listed Dates,Licensee Made Changes to Facility as Described in FSAR W/O Adequate Written SE Which Provides Bases for Determination That Changes Did Not Involve USQ IR 05000327/19980021998-03-0505 March 1998 Insp Repts 50-327/98-02 & 50-328/98-02 on 980202-06.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations & Maint.Review of Initial & Requalification Training Programs Were Also Conducted IR 05000327/19970181998-02-19019 February 1998 Insp Repts 50-327/97-18 & 50-328/97-18 on 971221-980131. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying & Resolving Problems ML20203J5411998-02-19019 February 1998 Notice of Violation from Insp on 971231-980131.Violation Noted:On 980126 Individuals Failed to Monitor Themselves in Whole Body Contamination Monitor or W/Hand & Foot Frisk Monitor ML20216D8431998-02-0606 February 1998 EN-97-109A:on 980206,informs of Withdrawal of Proposed Civil Penalty of $55,000 Issued to Licensee.Credit for Identification Appropriate to Recognize Diligence of TVA Training Instructor Who Discovered Vital Battery Problem IR 05000327/19970171998-01-16016 January 1998 Insp Repts 50-327/97-17 & 50-328/97-17 on 971109-1220.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems IR 05000327/19970141997-12-0808 December 1997 Insp Repts 50-327/97-14 & 50-328/97-14 on 970928-1108.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support,Effectiveness of License Controls in Identifying,Resolving & Preventing Problems ML20197F5541997-12-0808 December 1997 Notice of Violation from Insp on 970725-0704 & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Sro Failed to Implement Step 8.4.8 of Soi 0-S0-250-1. Predecisional EC Agenda & Documentation Encl IR 05000327/19970161997-12-0505 December 1997 Insp Repts 50-327/97-16 & 50-328/97-16 on 971103-06.No Violations Noted.Major Areas Inspected:Evaluation of 971017 Wire Damage Event at Electrical Penetration 22 ML20197F6971997-12-0303 December 1997 EN-97-109:on 971208,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Problem Re Failure to Maintain Direct Current Vital Battery Channel Energized & Operable IR 05000327/19973001997-11-0606 November 1997 Exam Repts 50-327/97-300 & 50-328/97-300 on 970919-1007. Exam Results:Four Out of Seven Candidates Passed Exam.One Candidate Was Marginal Performer IR 05000327/19970121997-10-24024 October 1997 Insp Repts 50-327/97-12 & 50-328/97-12 on 970824-0927.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support & Operator Requalification Program IR 05000327/19970151997-10-23023 October 1997 Insp Repts 50-327/97-15 & 50-328/97-15 on 970922-29.No Violations Noted.Major Areas Inspected:Emergency Preparedness PNO-II-97-057, on 971017,discovered 12 of 14 Instrument Cables Damaged in Unit 2 Containment Electrical Penetration. Sequoyah Unit 2 in Outage & All Fuel Removed from Reactor Vessel.Licensee Continues to Investigate Event1997-10-17017 October 1997 PNO-II-97-057:on 971017,discovered 12 of 14 Instrument Cables Damaged in Unit 2 Containment Electrical Penetration. Sequoyah Unit 2 in Outage & All Fuel Removed from Reactor Vessel.Licensee Continues to Investigate Event PNO-II-97-055, on 971006,contaminated Person Transported from Sequoyah Nuclear Plant to Offsite Medical Facility,Following Apparent Heart Attack.Victim Pronounced Dead at Hosp,Due to Apparent Heart Attack.Licensee Responded to Media Inquirie1997-10-0606 October 1997 PNO-II-97-055:on 971006,contaminated Person Transported from Sequoyah Nuclear Plant to Offsite Medical Facility,Following Apparent Heart Attack.Victim Pronounced Dead at Hosp,Due to Apparent Heart Attack.Licensee Responded to Media Inquirie ML20211E2531997-09-22022 September 1997 Notice of Violation from Insp on 970706-0823.Violation Noted:On 970714,containment Isolation Valve 1-FCV-31C-229 Failed to Exhibit Required Change of Obturator Position & Was Not Repaired or Replaced & Data Not Analyzed ML20198H7911997-09-11011 September 1997 Insp Repts 50-327/97-13 & 50-328/97-13 on 970725-0904. Violations Noted.Major Areas Inspected:Insp Scope,Event Synopsis & Observations & Findings IR 05000327/19970061997-07-28028 July 1997 Insp Repts 50-327/97-06 & 50-328/97-06 on 970525-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141H9531997-07-28028 July 1997 Notice of Violation from Insp on 970525-0705.Violation Noted:Licensee Failed to Implement Prompt Corrective Actions to Resolve Condition Adverse to Quality IR 05000327/19970071997-07-24024 July 1997 Insp Repts 50-327/97-07 & 50-328/97-07 on 970623-27. Violations Noted.Major Areas Inspected:Aspects of Licensee Plant Support ML20149L5671997-07-24024 July 1997 Notice of Violation from Insp on 970623-27.Violation Noted: on 960627,licensee Had Loss of Security Electronic Equipment & Failed to Post Officers in Position to Provide Surveillance of Entire Protected Area Perimeter ML20149G8681997-07-10010 July 1997 Notice of Violation from Insp on 970324-0522.Violation Noted:Licensee Failed to Esatblish Measures to Assure That Significant Condition Adverse to Quality Was Promptly Identified & Corrected & C/A Taken to Preclude Repetition ML20141G0361997-06-20020 June 1997 Notice of Violation from Insp on 970413-0524.Violation Noted:Each Intermediate & Power Range Channel Was Not Subj to Channel Function Test within 12 H Prior to Initiating Physics Test ML20141G0441997-06-20020 June 1997 Insp Repts 50-327/97-04 & 50-328/97-04 on 970413-0524. Violations Noted.Major Areas Inspected:Operations Re Physics Testing,Maint,Engineering & Plant Support 1999-09-27 |
Inspection Report - Sequoyah - 1988011 | |
---|---|
Assessments |
Text
-
9^ *I I AESJNFORMATION
"
-
-e s'o
.
NUCLEAR REGULATORY COMMISSION
.:
. ] I REGloN il
~
o
$
j 1o1 MARIETTA STREET, N.W.
- '
t ATLANTA GEORGIA 30323
%,,.../
MAR O 31988
,
Report Nos.:
50-327/88-11 and 50-328/88-11 Licensee:
Tennessee Valley Authority 6N38 A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
'
Docket Nos.:
50-327 and 50-328 License Nos.:
DPR-77 and OPR-79 Facility Name:
Sequoyah 1 and 2 Inspection Condycte January 5-29, 1988 Inspector -
/M/Kb MMf4 f
Qerry Enn M P ysical Security Inspector D' ate Signed M_
sMu hDr9slaMa'
k,~PhysijlT'SecurityInspector Date Signed
~
Approved by:
k,.
29 88
.m
'D. ~R.~ McGuire, Chief,. Physical Security Section Dat.e figned Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards
!
SUMMARY l
Scope:
This routine, unannounced physical security i n's pec ti on examined:
Management Effectiveness - Security Program, Security Program Audit, Physical Barriers - Protected and Vital Areas, Access Control - Personnel and Packages, Detection Aids - Protected and Vital Areas, and Alarm Stations.
,.
Results:
No violations of regulatory requirements were identified.
l
!
,
ENCLORURE CONTAINS "
" * " "" "" """
"*"
SAFEGU ARDS IN FORMATION "PAGE IS DECONTROLL 8803240453 880303 PDR ADOCK 05000327 O