Other: ML20137L000, ML20206T655, ML20206T679, ML20206T705, ML20206T726, ML20206T748, ML20206T776, ML20206T792, ML20206T817, ML20206T843, ML20206T847, ML20206T875, ML20206T899, ML20206T913, ML20206T921, ML20206T931, ML20206T937, ML20206T949, ML20206T966, ML20206T981, ML20206T986, ML20206U003, ML20212B914, ML20262E700, ML20262E704, NLS8400108, Forwards Second 10-yr Inservice Insp Plan, NLS8600021, Forwards Addenda to Rev 3 to Inservice Insp Program for ASME Class 1,2 & 3 Components, NLS8600248, Forwards Rev 5 to Inservice Testing Program for ASME Class 1,2 & 3 Components, for Second 10-yr Testing Program. General Pump Testing Procedure 3.9 & General Valve Testing Procedure 3.10 Being Revised to Incorporate Rev 1 Changes
|
MONTHYEARML20206T9131978-10-23023 October 1978 Rev 5 to Surveillance Procedure 6.3.16.1, Reactor Equipment Cooling - Pump Operability Test Project stage: Other ML20206T9861981-08-28028 August 1981 Rev 0 to Surveillance Procedure 6.4.1.8, Control Rod Drive Hydraulic Control Unit Accumulator Leakage Test Project stage: Other NLS8400108, Forwards Second 10-yr Inservice Insp Plan1984-04-0303 April 1984 Forwards Second 10-yr Inservice Insp Plan Project stage: Other ML20206U0031984-07-23023 July 1984 Rev 13 to Nuclear Performance Evaluation Procedure 10.9, Control Rod Scram Time Evaluation Project stage: Other ML20100M8071984-11-28028 November 1984 Draft Rev 9 to QA Policy for Calvert Cliffs Nuclear Power Plant Project stage: Draft Other ML20206T9371984-12-0606 December 1984 Rev 10 to Surveillance Procedure 6.3.18.2, Svc Water Motor Operated Valve Operability Test Project stage: Other ML20206T9311984-12-0606 December 1984 Rev 6 to Surveillance Procedure 6.3.18.1, Svc Water Pump Operability Test Project stage: Other ML20206T8751985-01-0303 January 1985 Rev 11 to Surveillance Procedure 6.3.12.2, Diesel Generator Starting Air Compressor Operability Project stage: Other ML20262E7001985-04-25025 April 1985 Flow Diagram:Circulating,Screen Wash & Service Water Systems. Sheet 1 of 5. Actual Rev STATUS:N14 Project stage: Other ML20262E7041985-04-26026 April 1985 Flow Diagram:Circulating,Screen Wash & Service Water Systems. Sheet 2 of 5. Actual Rev STATUS:N07 Project stage: Other ML20206T9661985-05-0202 May 1985 Rev 13 to Surveillance Procedure 6.3.19.1, Standby Gas Treatment Operability Test Project stage: Other ML20129J6611985-07-12012 July 1985 Submits Revised Inservice Testing Relief Requests RV-03 Re Reactor Recirculation Loops a & B Discharge Bypass Valves, Reflecting Current Pipe Configuration & RP-05 Re HPCI Test Method & Updated Request Index Project stage: Request ML20206T7761985-08-18018 August 1985 Rev 11 to Surveillance Procedure 6.3.8.4, Standby Liquid Control Manual Initiation Test Tank to Reactor Vessel Project stage: Other ML20206T8171985-09-13013 September 1985 Rev 12 to Surveillance Procedure 6.3.10.2, Instrument Line Flow Check Valve Test Project stage: Other ML20137L0001985-10-31031 October 1985 Addenda to Rev 3 to Inservice Insp Program for ASME Class 1,2 & 3 Components Project stage: Other ML20206T7481985-11-21021 November 1985 Rev 15 to Surveillance Procedure 6.3.6.1, RCIC Test Mode Surveillance Operation Project stage: Other ML20206T8431985-12-11011 December 1985 Rev 0 to Surveillance Procedure 6.3.10.16, Check Valves in Cooling Sys of Diesel Generators Integrity Verification Project stage: Other ML20206T9211986-01-16016 January 1986 Rev 12 to Surveillance Procedure 6.3.16.2, Reactor Equipment Cooling Motor Operated Valve Operability Test Project stage: Other NLS8600021, Forwards Addenda to Rev 3 to Inservice Insp Program for ASME Class 1,2 & 3 Components1986-01-17017 January 1986 Forwards Addenda to Rev 3 to Inservice Insp Program for ASME Class 1,2 & 3 Components Project stage: Other ML20206T7051986-01-30030 January 1986 Rev 18 to Surveillance Procedure 6.3.4.1, Core Spray Test Mode Surveillance Operation Project stage: Other ML20154A5251986-02-12012 February 1986 Forwards Request for Addl Info Re Inservice Testing Program, Based on Review of 840615,850522 & 0722 Ltrs Describing Second 10-yr Inservice Testing Program.Response Requested within 45 Days Project stage: RAI ML20206T8471986-03-0606 March 1986 Rev 17 to Surveillance Procedure 6.3.12.1, Diesel Generator Operability Test Project stage: Other ML20206T9491986-03-0606 March 1986 Rev 15 to Surveillance Procedure 6.3.18.3, Svc Water Surveillance Operation Project stage: Other ML20206T7261986-03-13013 March 1986 Rev 21 to Surveillance Procedure 6.3.5.1, RHR Test Mode Surveillance Operation Project stage: Other ML20206T9811986-04-24024 April 1986 Rev 17 to Surveillance Procedure 6.3.20.1, RHR Svc Water Booster Pump Flow Test & Valve Operability Test Project stage: Other ML20211A1361986-04-28028 April 1986 Trip Rept of 860415-16 Site Visit for Pump & Valve Inservice Testing Program Working Meeting Re Questions Resulting from Program Review.List of Attendees,Questions Serving as Agenda for Meeting & Responses to Questions Encl Project stage: Meeting ML20211A0891986-05-30030 May 1986 Forwards Contractor Summary of 860412 & 16 Meetings at Facility Re to Recipient Requesting Addl Info on Second 10-yr Inservice Testing Program.Correction Made on Page 2 of Summary Project stage: Meeting ML20206T8991986-06-0505 June 1986 Rev 3 to Surveillance Procedure 6.3.12.8, Diesel Generator Fuel Oil Transfer Pump Flow Test Project stage: Other ML20206T7921986-06-0505 June 1986 Rev 1 to Surveillance Procedure 6.3.9.1, MSIV Accumulator Functional Test Project stage: Other ML20206T6551986-06-12012 June 1986 Rev 13 to Surveillance Procedure 6.3.2.1, Automatic Depressurization Sys Manual Valve Actuation Project stage: Other ML20206T6791986-06-12012 June 1986 Rev 23 to Surveillance Procedure 6.3.3.1, HPCI Test Mode Surveillance Operation Project stage: Other ML20206T6381986-06-30030 June 1986 Forwards Response to W Long 860212 Request for Addl Info Re Inservice Testing Program & 860415-16 Meetings Re Open Items.Surveillance Procedures,Including Procedure 6.3.2.1, Also Encl Project stage: Meeting NLS8600248, Forwards Rev 5 to Inservice Testing Program for ASME Class 1,2 & 3 Components, for Second 10-yr Testing Program. General Pump Testing Procedure 3.9 & General Valve Testing Procedure 3.10 Being Revised to Incorporate Rev 1 Changes1986-07-30030 July 1986 Forwards Rev 5 to Inservice Testing Program for ASME Class 1,2 & 3 Components, for Second 10-yr Testing Program. General Pump Testing Procedure 3.9 & General Valve Testing Procedure 3.10 Being Revised to Incorporate Rev 1 Changes Project stage: Other ML20212B9141986-07-31031 July 1986 Vols I & II of Rev 5 to Inservice Testing Program for ASME Class 1,2 & 3 Components, for Second 10-yr Testing Program Project stage: Other ML20148C9481988-01-13013 January 1988 Forwards Safety Evaluation of Util Second 10-yr Inservice Testing Program Submitted w/860730 Ltr.Certain Relief Requests Denied Where Proposed Alternative Testing Unacceptable.Technical Evaluation Rept Also Encl Project stage: Approval ML20151H8461988-04-13013 April 1988 Forwards Response to Anomalies Identified in NRC 880113 SER Re Facility Inservice Testing Program.Reactor Equipment Pumps Will Be Tested in Accordance W/Section Xi.Util Evaluating Need for Any Relief Request in Performing Test Project stage: Request ML20151L3111988-07-29029 July 1988 Forwards Revised & New Relief Requests & Program Corrections to Second 10 Yr Inservice Testing Program.Addl Review of Program Identified Need for Further Changes to Program Including Rev of Existing Relief Requests Project stage: Request 1986-01-16
[Table View] |
Text
1 i
January 13, 1988 Docket No. 50-298 i
Mr. George A Trevors, Division Manager - Nuclear Support Nebraska Public Power District P.O. Box 499 Columbus, Nebraska 68601
Dear Mr. Trevors:
SUBJECT:
COOPER NUCLEAR STATION (CNS), INSLRVICE TESTING (IST)
PROGRAM (TAC 54682)
The staff, with technical assistance from EC&G, has completed its review of the CNS second ten year IST program submitted by your letter dated July 30, 1986.
The staff's Safety Evaluation (SE) with its attached EG&G Technical Evaluation Report (TER) is enclosed.
Certain relief requests have been denied where proposed alternative testing is unacceptable or where adequate basis for the request has not been provided.
Also, certain discrepancies and inconsistencies are identified in Appendix C of the TER.
These inconsistencies and discrepancies should be addressed within 90 days by either correcting the IST program or submitting appropriate relief requests.
The District is required to comply with the IST program in accordance with the relief granted in the enclosed SE.
Program changes such as revisions or addi-tional relief requests or deletion of components fron, the IST program may not be implemented withcut our prior review and approval.
Implementation of the approved IST program will be the subject of future inspection activities.
If you have any questions please contact me at (301) 492-4754.
Sincerel,
8801250294 080113
.U PDR ADOCK 05000290 William. Long, Proj.ect Manager P
PDR Project Directorate-IV Division f Reactor Project - III IV, V, and Special Project
Enclosures:
As stated cc w/ enclosures:
See next page DISTRIBUTION Docket File NRC PDR Local POR PD4 Reading OR4A/ Collins J. Calvo P. Noonan W. Long OGC-Bethesda E. Jordan J. Partlow ACRS (10)
PD4 Plan' File T. Marsh 9
- See previous concurrences:
dl PO4/L PD4/PM*
JPIFf/D EMEB*
{-
PNoons JCalvo TMarsh WLong:vh p
01/$/88 01/06/88 01/U/88 01/11/88
l l
Occket No. 50-298
)
Mr. George A Trevors, Division Manager - Nuclear Support Nebraska Public Power Dist*ict P.O. Box 499 Columbus, Nebraska 68601
Dear Mr. Trevors:
SUBJECT:
COOPER NUCLEAR STATION, INSERVICE TESTING (IST)
PROGRAM (TAC 54r The staff, with technical assistance from EG&G, has completed its review of the CNS second ten year IST program submitted by your letter dated July 30, 1986.
The staff's Safety Evaluation Report (SER) with its attached EG&G Technical Evaluation Report (TER) is enclosed.
Certain relief requests have been denied where proposed alternative testing is j
unacceptable or where adequate basis for the request has not been provided.
Also, certain discrepancies and inconsistencies are identified in Appendix C of the TER.
These inconsistencies and discrepancies should be addressed within 90 days by either correcting the IST program or submitting appropriate relief requests.
The District is required to comply with the IST program in accordance with the relief granted in the enclosed Safety Evaluation Report (SER).
Program changes such as revisions or additional relief requests or deletion of components from the IST program may not be implemented without our prior review and approval.
Implementation of the approved IST program will be the subject of future inspection activities.
l If you have any questions please contact me at (301) 492-4754.
Sincerely, William O. Long, Project Manager Project Directorate-IV Division f Reactor Project - III IV, V, and Special Project
Enclosures:
As stated cc w/ enclosure:
See next page DISTRIBUTION Docket File NRC POR Local POR PO4 Reading DR4A/ Collins J. Calvo P. Noonan W. Long OGC-Bethesda E. Jordan J. Partlow ACRS (10)
PO4 Plant File T. Marsh PO4/LA PO4/PM h V PO4/D EMEBb PNoonan WLong:vh JCalvo p TMarsh 12/ /87 12 87 12/ /87 08/11/81 I it O
Mr. George A. Trevors Nebraska Public Power District Cooper Nuclear Station ec:
Mr. G. D. Watson, General Counsel Nebraska Public Power District P. O. Box 499 Columbus, Nebraska 68601 Cooper Nuclear Station ATTN:
Mr. Guy R. Horn, Division Manager of Nuclear Operations P. O. Box 98 Brownville, Nebraska 68321 Director Nebraska Department of Environmental Control P. O. Box 94877 State House Station Lincoln, Nebraska 68509-4877 Mr. William Siebert, Commissioner Nemaha County Board of Commissioners Nemaha County Courthouse Auburn, Nebraska 68305 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 218 Brownville, Nebraska 68321 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Mr. Harold Borchart, Director Division of Radiological Health Department of Health 301 Centennial Mall, South P. O. Box 95007 Lincoln, Nebraska 68509