Text

,

touren'autLeak diattua urendtiund narvoat SURVEILLANCE PFOCEDURE 6.3.2.1 ADS MANUAL VALVE ACTUATION

/

I. PURPOSE A. To provide a detailed instruction for station personnel to manually open each relief valve with the reactor at pressure, to confirm the operability of each automatic depressurization system (ADS) relief valve.

II. DISCUSSION A. The ADS utilizes six pressure relief valves to relieve the high pres-sure steam to the suppression pool. This procedure will consist of testing all eight of the nuclear steam system relief valves. Testing of the relief valves will be normally performed at a low power level.

III.

  • REFERENCE MATERIAL A. USAR. - -
1. Volume II,Section IV, Subsection 4.
2. Volume II,Section VI, Subsectich'5.2.3.
3. Volume III,Section VII, Subsection 4.3.3.
4. Volume VII, Appendix H, Page H.4.9.

B. Flow Diagrams.

~

1. B & R Draving 2027; Reactor Recirculation and Suppression Chamber Vent Systems and Connections.
2. B & R Drawing 2028; Reactor Building and Drywell Equipment Drain System.
3. B & R Drawing 2026; Reactor Vessel Instrumentation.

C. Vendor Manuals.

1. G.E. Operations and Maintenance Instruction Volume II, Subgroup Nuclear Boiler System, Sections 3 and 5. , ,

D. Electrical Diagrams.

1. G.E. Drawing 791E253; Elementary Automatic Blowdown System.
2. G.E. Drawing 730E149; FCD Automatic Blowdown System.
3. G.E. Drawing 944E689; Low-Low Set. -

8607080202 860630 PDR ADOCK 05000298 p PDR Rsvised By/Date Reviewed By/Date AhproedBy/Date J Rev Procedure Page 1 0:

R. Gardner 1/6/86 R. Brungarde 6/10/86 /% 13 6.3.2.1 4 Paget

.- _ ,v . ~ .

4. B & R Drawing 3010; Vital One Line Diagram.
5. B & R Drawing 3059; DC Panel Schedules.

IV. PREREQUISITES A. Control air system in service and supplying reliable air to the relief i

' valve accumulators.

B. Reactor pressure

  • 150 psig.

V. LIMITATIONS A. Surveillance Requirements - Technical Specifications Section 4.6.D.5.

1. Once per operating cycle, with the reactor pressure > 100 psig, each relief valve shall .be manually opened until the main turbine i

, bypass valves have closed, to compensate for relief valve opening.

, B. Administrative Limits. - -

1. Attachment "B" shall be used to record the test and filed as . part .

of the station records.

! 2. All testing shall be coordinated with the Control Room Operator.

i VI. PRECAUTIONS

. A. Suppression pool water temperature must be monitored during relief valve operation.

  • B. When manually operating main steam relief valves attempt to alternate

. the use of the valves and avoid prolonged usage (> 5 minutes) of j individual valves to avoid overheating any localized areas.

C. In the event that a relief valve fails:to function as designed, except for pressure setpoint requirements, and the cause of the malfunction is not clearly determined, understood, and therefore corrected, the entire valve shall be removed from service, disassembled, inspected, adjusted, and pressure setpoint tested with steam for proper operation prior to q returning the valve to service.

VII. TEST EQUIPMENT

  • t A. None.

1 VII

I. PROCEDURE

A. ADS Manual Valve Actuation.

1. Obtain permission and signature from the Shif t. Supervisor before starting the test.

i I

l l

l i

Procsdure Number. 6.3.2.1 Date / 13 2l , Revision 13 Page 2 Of. 4 Pages

. . . -- - . , - , . ~ , , . _ .- . . _ , -, , , ,

2. Assure the proper indication for the test condition is displayed on the safety system status panel.
3. The blue indicating light for relief valve position indication on panel 9-3 is lit (indicates the valve has downstream pressure < 30 psig which indicates that the valve should be closed).. ,
4. The green indicating light for the relief valves on panel 9-3 is-lit (indicates the solenoid pilot valve is deenergized).
5. Check that_ annunciators 9-3-4/2-1, SV BLOWDOWN VALVE LEAK, and 9-3-4/3-1, RELIEF VALVE OPEN, are clear. ,,
6. Read and record the relief valve downstream temperature on NB-TR-166 with the relief valves closed. .

Note: The following computer points may also be utilized.

I a. T142; MS Relief Valve A Temperature DEGF.

b. T143; MS Relief Valve B Temperature DEGF.
c. T144; MS Relief Valve C Temperature DEGF.
d. T145; MS Relief Valve D Temperature DEGF.
e. T146; MS Relief Valve E Temperature DEGF. .
f. T147; MS Relief Valve F Temperature DEGF.
g. T148; MS Relief Valve G Temperature DEGF.
h. T149; MS Relief Valve H Temperature DEGF.
7. Read and record the bypass valve position with the relief valves closed.
8. Place the control switch for the desired relief valve (A, B, C, D, E, F, G, H) to OPEN on panel 9-3.
9. Check that the red indicating light comes on and the green and blue indicating lights go out for that relief valve (indicates solenoid pilot valve is energized). ,
10. Read and record the bypass valve position with the relief valve open.

Note: Minimum acceptable level of valve movement is > 2%.

11. Observe the temperature increase indication on recorder NB-TR-166 and record the temperature or computer point for the appropriate relief valve as listed in Step 6.

i

Procedure Number 6.3.2.1 ,

Date I,. il- QG Revision 13 Page- 3 Of 4 Pages:

12. Verify annunciators 9-3-4/2-1, SV BLOWDOWN VALVE LEAK (only if the temperature is > 300*F), and 9-3-4/3-1, RELIEF VALVE OPEN, alarm.
13. Verify computer alarm typer prints MAIN STEAM RELIEF VALVE OPEN for proper valve.
14. Place the control switch for the relief valve to AUTO on panel 9-3.
15. Verify computer alarm typer prints MAIN STEAM RELIEF VALVE CLOSED for proper valve.
16. Check that the red indicating light goes out and the green and blue "'

indicating lights come on for that relief valve.

CAUTION: DO NOT LEAVE THE RELIEF , VALVE OPEN FOR LONGER THAN 5 MINUTES MAXIMUM. MONITOR THE SUPPRESSION POOL TEMPERA-TURE AFTER MANUALLY INITIATING EACH RELIEF VALVE.

17. Read and record the bypas's valve position with the relief valve closed. -
18. Mark the time and relief valve number (of valve just tested) on the torus level recorder.
19. Ensure the ADS system is ready for standby operation as per System Operating Procedure 2.2.1,Section VII.A.
20. Restore the safety system status panel to normal.
21. Notify the Shift Supervisor that the test is complete.

IX. ATTACHMENTS A. Not Applicable.

B. ADS Manual Valve Actuation Functional Test Data Sheets.

Proctdure Number 6.3.2.1- Date /9 I;, J', Revision 13 Page 4 Of 4 Pages

~

COOPER NUCLEAR STATION OPERATIONS MANUAL ATTACHMENT "B" SURVEILLANCE PROCEDURE 6.3.2.1 ADS MANUAL VALVE ACTUATION FUNCTIONAL TEST f

STEP PERFORMED RELIEF VALVES MS-RV-71 PROCEDURE A B C D E F G H

1. Obtained permission to start test.
2. Assured status panel indicates test condition.
3. Verified blue light lit. -- -- -------
4. Verified green light lit.
5. Verified annunciators 9-3-4/2-1 and 9-3-4/3-1 elear.
6. Recorded temperature. --
7. Recorded bypass valve position.
8. Placed control switch to OPEN.
9. Checked red light on, green and blue, lights out. ---
10. Recorded bypass valve position.
11. Recorded temperature. ~
12. Verified annunciators 9-3-4/2-1 (only if temperature ----- X X X X X X X X is > 300*F) and 9-3-4/3-1 alarm.
13. Verified computer prints MAIN STEAM RELIEF VALVE X X X X X X X X OPEN. -
14. Placed control switch to AUTO.
15. Verified computer prints MAIN STENH RELIEF VALVE X X X X X X X X CLOSED. -' --
6. Verified red light out, green and blue lights on.

j

17. Recorded bypass valve position.
18. Marked time and relief valve number on torus level -

X X X X X X X X recorder.

19. Ensured ADS in standby.
20. Restored status panel to normal.
21. Notified Shift Supervisor test complete.

i-TEMPERATURE RECORDER 166 PANEL 9-21 l Relief Valve Downstream Temperature MS-RV- 71A 71B 71C 71D 71E 71F 71G 71H

  • Initial Downstream Temperature Downstream Temperature Following Valve Movement Bypass Valve Position Before Test

,

  • Bypass Valve Position During Test Bypass Valve Position After Test
  • Minimum acceptable level of bypass valve movement is > 2% during valve lif t.

Procedure Number 6.3.2.1 Date /. . c. . ; f.

-Revision 13 Page 1 Of 2 Pager i

[. _

. , . . , , _ _ ~ ,- - - - - - + --, -- " ' - - ~ ~ " " " " ' " ' ' ~ ~ ' ~~~'

COUPER NUCLEAR tiTAT10N UPhKAT10Nts MANUAL TTACHMENT "B" SURVEILLANCE PROCEDURE 6.3.2.1 ADS MANUAL VALVE ACTUATION 4

FUNCTIONAL TEST Discrepancies: .

N Operator /

Date Shift Supervisor / Permission To Start Date Shift Supervisor / Test Complete And Reviewed Date Shift Supervisor / NCR Written If Required Date I

Work Item (s) Initiated If Required Reviewed By /

Date Proc dure Number 6.3.2.1 Date /.. ! !.

. Revision 13 Page 2 Of 2 Pages