Text
COOPER NUCLEAR STATION OPERAT10MS MANUAL e
SERVICE WATER MOTOR OPERATED VALVE
- URVEILLANCE PROCEDURE 6.3.18.2 OPERABILITY TEST I.
PURPOSE A.
To provide a detailed instruction for station personnel to test operability of motor operated valves in the service water system.
II.
DISCUSSION
~
A.
This procedure covers the actions necessary to assure proper operation of the motor operated valves in the service water system.
III.
REFERENCE MATERIAL A.
USAR.
1.
Volume I,Section I, Subsection 6.2.17.
2.
Volume IV,Section X, Subsection 8.1.
B.
System Operating Procedure 2.2.71; Service Water System.
C.
Flow Diagrams.
1.
B& R Drawing 2006; Circulating, Screen Wash, and Service Water System, Sheets 1 and 3.
2.
B & R Drawing 2036; Reactor Building Service Water System.
IV.
PREREQUISITES A.
Obtain permission and signature from the Shift Supervisor before starting the test.
B.
Establish communications.
V.
LIMITATIONS A.
Surveillance Requirements - Technical Specifications Section 4.12.C.1.b.
1.
Check motor operated valve operability monthly.
B.
Administrative Limits.
1.
All discrepancies shall be recorded in the Shif t Supervisor's Log.
2.
Attachment "A" shall be used to record the test and filed as part of the station records.
3.
All testing shall be coordinated with the Control Room Operator.
f P
R; vised By/Date Reviewed By/Date A proved By/Date Rev Procedure
" M /Ysaw Page 1 Of R. Gardner 11/2/84 K. Wire 12/1/84 g g,, g.jp/
10 6.3.18.2 5
Pages
r VI.
PRECAUTIONS A.
Ensure the service water systen is returned to normal. configuration at completion of the test as per System Operating Procedure 2.2.71.
VII. TEST EQUIPMENT A.
None.
VII
I. PROCEDURE
Note: All steps must be completed for monthly test. Only
- steps need be completed to prove operability for a system component being inop.
A.
Service Water Motor Operated Valve Operability Test.
- 1.
Secure the screen wash and sparger pumps.
- 2.
Close SW-117MV (Turbine Building service water supply) and reopen immediately.
~
Caution: The Operator should stand by to open SW-117MV manually if it fails to open.
3.
Close SW-116MV (screen wash priming and emergency supply) and reopen.
4.
Check SW-36 (service water pump crosstie) open.
- S.
Close SW-37MV (service water pumps crosstie) and reopen.
- 6.
Restart the screen wash.and sparger pumps and check proper screen 4
operation.
7.
Close the valves to the operable gland seal water strainers.
a.
SW-544 (S-403) inlet valve.
b.
SW-556 (S-405) inlet valve.
8.
Check closed SW-551 (S-404) inlet valve.
t 9.
Open SW-2128MV (service water gland seal water backup from service water pumps A and C) and reclose (return the switch to the AUTO position af ter closing the valve).
- 10. Open' SW-2129MV (service water gland seal water backup from service water pumps B and D) and reclose (return the switch to the AUTO
-position after closing the valve).
11.
Open the valves to the operable gland seal water strainers.
a.
SW-544 (S -403) inlet valve.
octdure Number 6.3.18.2 Date /EF-6-f Y Revision 10 Page 2
Of 5
Pages.
b.
SW-556 (S-405) inlet valve.
12.
Cycle SW-650MV (REC heat exchanger IB outlet) through a complete operating cycle.
13.
Cycle SW-651MV (REC heat exchanger. lA outlet) through a complete operating cycle.
- 14.
Crack open the drain valves until a solid flow is observed and then close.
Note: This is to ensure the service water lines are not plugged.
a.
SW-418 (emergency supply to REC north critical loop tell-tale drain).
b.
SW-420 (emergency supply to REC south critical loop tell-tale drain).
SW-422 (emergency return from REC north critical loop tell-tale c.
drain),
d.
SW-424 (emergency return from REC south critical loop tell-tale drain).
- 15.
Close:
SW-417 (emergency supply to REC north critical loop).
a.
l b.
SW-419 (emergency supply to REC south critical loop).
SW-421 (e~ ergency return from REC north critical loop).
c.
m d.
SW-423 (emergency return fr'om REC south critical loop).
- 16.
Open:
SW-418 (emergency supply to REC north critical loop tell-tale a.
drain).
b.
SW-1266 (vent between SW-887MV and SW-417).
I SW-420 (emergency supply to REC south critical loop tell-tale c.
drain).
d.
SW-1265 (vent between SW-886MV and SW-419).
SW-422 (emergency return from REC north critical loop tell-tale e.
drain).
f.
SW-1267 (vent between SW-888MV and SW-421).
h ocsdure Number 6.3.18.2 Date
/d-8 -7 h
. Revision-10 Page 3
Of 5
Pages
E Ar g.
SW-424 (emergency return from REC south critical loop tell-tale drain),
h.
SW-1268 (vent between SW-889MV and SW-423).
- 17.
When the lines are drained, close:
4-a.
SW-418.
b.
SW-1266.
c.
SW-420.
d.
SW-1265.
i e.
SW-422.
f.
SW-1267.
g.
SW-424.
h.
SW-12,68.
- 18.
Place the REC /SW System Intertie switch on VBd-M to OPEN; SW-886MV, SW-887MV, SW-888MV, and SW-889MV open, and REC-697MV and REC-698MV-l
- close, j
Note:. Operation of the switch operates the service ' water -valves
)
and also operates the following REC valves.
1 REC-697MV (north critical loop return).
a.
b.
REC-698MV (south critical loop return).
REC-711MV (south critical loop supply).
c.
d.
REC-714MV (north critical loop supply).
l
- 19.
Place the REC /SW System Intertie switch on VBd-M to CLOSE; SW-886MV, SW-887MV, SW-888MV, and SW-889MV close, and REC-697MV and REC-698MV open.
- 20.
Open:
i a.
SW-417.
i 4
b.
SW-419.
c.
SW-421.
j
.d.
SW-423.
j I
rocedure Number 6.3.18.2 Date
/El-$-8Y Revision __jjL, Page 4
Of 5
Pages t
,_-.-.m_-.
s
- 21.
Verify that the service water system is return to normal or to the AS FOUND condition.
- 22.
Notify the Shift Supervisor that'the test is complete.
IX.
ATTACHMENTS s-A.
Service Water Motor Operated Valve Operability Test Data Sheets.
.~
1:
k e
i i
l' o
9 4
ocedure Number 6.3.18.2 Date ld -la -8Y Revision 10 Page-5 Of 5
Pages
( O U N t k N Ut.,Lt.At< StA1106 UrtKA110Nb tumUAL SERVICE WATER MOTOR OPERATED VALVE TTACHMENT "A" SURVEILLANCE PROCEDURE 6.3.18.2 OPERABILITY TEST 4
PROCEDURE DATA CHECK
- l.
Secured screen wash and sparger pumps.
- 2.
Closed SW-117MV and reopened immediately.
3.
Closed SW-Il6MV and reopened.
=-
4.
Checked SW-36 open.
- 5.
Closed Su-37MV and reopened.
- 6.
Restarted screen wash and sparger pump and checked XXXXXXXXXX proper screen operation.
7.
Closed valves to operable gland seal water strainers:
XXXXXXXXXX-a.
SW-544 (S-403) inlet valve.
b.
SW-556 (S-405) inlet valve.
8.
Checked closed SW-551 (S-404) inlet valve.
9.
Opened SW-2128MV and reclosed. ----
---r 10.
Opened SW-2129MV and reclosed.
11.
Opened valves to operable gland seal water strainers:
XXXXXXXXXX 7
a.
SW-544 (S-403) inlet valve.
b.
SW-556 (S-405) inlet valve.
12.
Cycled SW-650MV.
13.
Cycled SW-651MV. -- -
- 14.
Cracked open drain valves until solid flow and then XXXXXXXXXX closed:
a.
SW-418. -
b.
SW-420.
j c.
SW-422.
d.
SW-424.
- 15.
Closed:
XXXXXXXXXX a.
SW-417.
b.
SW-419. -
c.
SW-421.
d.
SW-423.
- 16.
Opened:
XXXXXXXXXX a.
SW-418.
b.
SW-1266, c.
SW-420. -
d.
SW-1265.
e.
SW-422.
f.
SW-126 7. ------
L g.
SW-424.
h.
SW-1268.
- 17.
When lines are drained, closed:
XXXXXXXXXX a.
SW-418.
b.
SW-1266.
c.
SW-420. -------
d.
SW-1265.
l e.
SW-422.
f.
SW-1267. ----------
g.
FW-424.
h.
ocedure Number 6.3.18.2 Date /d-b-[Y Revision 10 Page 1
Of 2
Pages 1
.n
.n.
COUPt.H NUCLEAR b'l Ai 10N u!'t.ita t 10Nd tiAh0AL 4
SERVICE WATER MOTOR OPERATED VALVE
'.TTACHMENT "A" SURVEILLANCE PROCEDURE 6.3.18.2 OPERABILITY TEST 4
PROCEDURE DATA CHECK
- 18.
Placed REC /SW switch on VBd-M to OPEN.
a.
Following valves opened:
XXXXXXXXXX
- 1) SW-886MV.
- 2) SW-887MV.
- 3) SW-888MV.
-4)
SW-889MV.
b.
Following valves closed:
XXXXXXXXXX
- 1) REC-697MV.
- 2) REC-698MV.
J
- 19.
Placed REC /SW switch on VBd-M to,CLOSE.
a.
Following valves closed:
XXXXXXXXXX 1)
SW-8 8 6MV. --------
2)
SW-887MV.
- 3) SW-888MV.
I'
- 4) SW-889MV.
b.
Following valves opened:
XXXXXXXXXX
- 1) REC-697MV.
- 2) REC-698MV. -
4
- 20.
Opened:
XXXXXXXXXX a.
SW-417.
b.
SW-419.
- c..SW-421.
d.
SW-423.
- 21.
Returned service water system to normal or AS FOUND condition. ---
- 22.
Notified Shift Supervisor that test is completed.
Discrepancies:
1 i
g; j.
Operator
/
Date i
Shift Supervisor
/
Permission To Start
)
Date Shift Supervisor
/
Test Complete And Reviewed Date Shift Supervisor
/
NCR Written If Required Date
. Work Item (s) Initiated If Required I
' Reviewed By
/
Date i
i focedure Number 6.3.18.2 Date /d -b ~h Revision 10 Page 2
Of 2
Pages
-