Rev 3 to Surveillance Procedure 6.3.12.8, Diesel Generator Fuel Oil Transfer Pump Flow Test
ML20206T899
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/05/1986
From: Brungardt R, Tanya Smith
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20206T643 List:
References
6.3.12.8, TAC-54682, NUDOCS 8607080249
Download: ML20206T899 (5)


Text

. _.....oo.... ......o........, . . . . . . .

DIESEL GEt4ERAf0R kULL OlL IR<GSEER PUMP

, SURVEILLANCE PROCEDURE 6.3.12.8 FLOW TEST

, s a

I. PURPOSE

A. To provide a detailed instruction for station personnel to perform a flow test of the diesel generator fuel oil transfer pumps.

l II. DISCUSSION 4

A. Diesel fuel oil is stored in two underground tanks. Diesel generator fuel oil transfer pumps A and B transfer fuel to day tanks in the Diesel Rooms. Either pump can feed the day tank in DG-1 Room, or DG-2 Room, or both.

III. REFERENCES

~

! A. USAR.

1. Volume IV,Section VIII, Subsection 5.

B. Flow Diagrams.

~

1. B & R Drawing 2011. Sheet 1.
2. B & R Drawing 2077.

) C. Electrical Diagrams.

1. B & R Drawing 3045.

D. Vendor Manuals.

! 1. Gould Pumps Model 3171 E71-5.

IV. PREREQUISITES A. Obtain permission and signature from the Shift Supervisor before starting the test.

B. Schedule this test to follow a monthly diesel operability test. This will provide a means for lowering the day tank to a level necessary to assure full transfer pump flow. ,

C. Coordinate testing with the Control Room Operator.

V. LIMITATIONS A. Surveillance Requirements - Technical Specifications.

1. None.

hp D CK O 8 P

A .

Rsvised By/Date Reviewed By/ Data s prot d By/Date Rev Procedure Page 1 Of T. Smith 5/8/86 R. Brungardt 6/4/86 6.3.12.8 Pages 1

n 0---4/%6 3 3 ,

m____ . . _ . _ . _ _ _ . - _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . __ . _ _ _ _ _ . - _ _ . _ . _ _ _ . . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _

'. 4

?

1 k

}' B. Administrative Limits.

I' 1. Attachment "A" shall be used to record the test and filed as part l

4 of the station records.

2. All testing shall be coordinated with the Control Room Operator.
3. Test is to be run once per cycle.

VI. PRECAUTIONS (t

A.

No smoking or open flame in the Day Tank Room. -

}. B. Clean up any spilled fuel.

! VII. TEST EQUIPMENT I

A. Stopwatch.

B. Flow meter (stored in the tool crib).

j i

i VII

I. PROCEDURE

4 A. Diesel Generator Fuel Oil Transfer Pu'ap Flow Test.

I

1. Obtain the Shif t Supervisor's signature.

l

2. Record the levels in diesel oil storage tanks A and B.
3. Place the switches for both fuel oil transfer pumps A and B in off l , prior to starting the diesel generators for the monthly operability  ;

test when this procedure is to be performed.

} Note: Both switches must be in the OFF position since either pump

j. will start on a low level in either day tank. .

)

) 4. Close valve DCDO-11 (DGDO-15) and return the broken seal to -the

! Shift Supervisor.

i [

! 5. Close valve DGDO-19 (DGDO-19) and return the broken seal to the

[ Shift Supervisor.

6. Install the flow meter in the fill line near the top of the day

! tank.

t I 7. To assure maximum transfer pump flow rates can be measured, verify t

that the day tank levels are < 40" prior to starting and record the

level in day tank 1 (2).

i l 8. Record the flow meter indication.

) 9.' Open valve DGDO-ll (DCDo-15).

1 1

, i i

i j Procedure Number 6.3.12.8 Date 4. CSIf Revision 3 Page. 2 Of 3 Pages ,

i.

l

10. Start fuel oil transfer pump A (B) and operate it for 5 minutes.

During operation record transfer pump A (B) discharge pressures as indicated on DGDO-PI-634A (DGDO-PI-634B) and DGDO-PI-636A (DGDO-PI-636B).

11. Stop transfer pump A (B) and record the flow meter indicatibn.

r

12. Close valve DGDO-11 (DGDO-15).
13. Remove the flow meter and return the fill line back to normal.
14. Open valve DGDO-11 (DGDO-15) and install the new seal as issued by

, the Shift Supervisor.

15. Open valve DGDO-19 (DGDO-19) and install the new seal as issued by the Shift Supervisor.

~

16. Perform independent (Licensed Operator) verification that the valves closed in Steps 4. and 5. have been reopened and sealed.,

i 17. Place one transfer pump control switch in AUTO and the other in AUTO ALTERNATE.

i 1 18. Return the flow meter to the tool c' rib.

19. Notify the Shift Supervisor thnt the test is completed.

IX. ATTACHMENTS A. Diesel Generator Fuel Oil Transfer Pump Flow Test Data Sheets.

L 4

.i 4

a 4

IProcedure Number 6.3.12.8 Date A . 6 9b Revision 3 Page _ 3 Of 3 Pages

s~m un .. v u o , .. .,an. ua urr.nnituna nanunu

. DIESEL GENERMOR FUEL oil 'IRANSI ER PUMP -

ATTACHMENT "A" SURVEILLANCE PROCEDURE 6.3.12.8 FLOW TEST DIESEL CENERATOR FUEL OIL TRANSFER PUMP. FLOW TEST DG-1 DG-2

1. Obtained Shift Supervisor's signature.
2. Recorded levels in diesel oil storage tanks A and B; - HH XXH Tank A:  ; Tank B: . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3. Placed both fuel oil transfer pumps A and B switches in XXXX XXXX off prior to starting diesel operability test.

4 Closed valve DCD0-11 (DGD0-15) and returned broken seal -------------- XXXX XX,U to Shift Supervisor.

5. Closed valve DGD0-19 (DGD0-19) and returned broken seal XXXX XXXX c d S h i f t S u p e rv i s o r . ----------------------------- - - - - - - - - -
6. Installed flow meter in fill line near top of day tank.

. 7. Verified day tank levels are < 40" prior to starting XXXX XXXX and recorded levels; Tank 1:  ; Tank 2: . - - - - - - - - - - - ---

8. Recorded flow meter indication.
9. Opened valve DGDO-11 (DGDO-15). *
10. Started fuel oil transfer pump A (B) , operated it f or ---------------- XXXX XXXX 5 minutes, and recorded discharge pressures below. "
11. Stopped transfer pump A (B) and recorded flow n.eter XXXX XXXX 4 indication. ---- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
12. Closed valve DGDO-11 (DGDO-15).
13. Removed flow meter and returned fill line back to normal.
14. Opened valve DGDO-11 (DGD0-15) and installed new seal as ----- --

XXXX XXXX issued by Shif t Supervisor.

15. Opened valve DCDO-19 (DGDO-19) and installed new seal as XXXX XXXX is s u e d b y S hi f t S u p e rvis o r . ------------------ ------ - - - - -
16. Performed independent (Licensed Operator) verification XXXX XXXX that valves closed in Steps 4. and 5 have been reo and se a led . ------------------------pe ne d --- -----

XXXX XXXX

17. Placed one transfer pump control switch in AUTO and the XXXX XXXX other in AUTO ALTERNATE.
18. Returned flow meter to tool crib. -------------- --- ---
19. Notified Shift Supervisor that test is completed.

FLOW METER DATA DAY TANK 1 DAY TANK 2 Final Initial Calculated

  • DISCHARGE PRESSURE DATA TRANSFER PUMP A TRANSFER PUMP B PI-634A psig PI-634B psig PI-636A psig PI-636B psis
  • Minimum flow is 5 gallons / minute; diesel consumption at full low is 270 gallons /

hour or 4.5 gallons / minute.

Test Instrument Number:

Prec: dure Number 6.3.12.8 Date 4. CM Revision 3 Page 1 Of 2 Pages

ooo. u ..o o o . .. .. . n . au.. o r r.nn t tuns nnnenu f

DIESEL GENERATOR FUEL OLL TRAESFER PLHP  ;

'ATTACllMENT "A" SURVEILLANCE PROCEDURE '6.3.12.8 FLOW TEST '

DIESEL GENERATOR FUEL OIL TRANSFER PUMP FLOW TEST Discrepancies: .

4 e

l G

Operator /

Date Shift Supervisor _ / Permission To Start Date Shift Supervisor / Test Complete And Reviewed .

Date Shift Supervisor / NCR Written If Required Date Work Item (s) Initiated If Required R; viewed By /

Date Pr:c: dure Number 6.1.12.8 Date r' .' // - Revision 3 Fage 1 Of 2 Pages