_.....oo....

......o........,

DIESEL GEt4ERAf0R kULL OlL IR<GSEER PUMP SURVEILLANCE PROCEDURE 6.3.12.8 FLOW TEST s

a I.

PURPOSE A.

To provide a detailed instruction for station personnel to perform a flow test of the diesel generator fuel oil transfer pumps.

l II.

DISCUSSION A.

Diesel fuel oil is stored in two underground tanks. Diesel generator 4

fuel oil transfer pumps A and B transfer fuel to day tanks in the Diesel Rooms. Either pump can feed the day tank in DG-1 Room, or DG-2 Room, or both.

III. REFERENCES A.

USAR.

~

1.

Volume IV,Section VIII, Subsection 5.

B.

Flow Diagrams.

1.

B & R Drawing 2011. Sheet 1.

~

2.

B & R Drawing 2077.

)

C.

Electrical Diagrams.

1.

B & R Drawing 3045.

D.

Vendor Manuals.

1.

Gould Pumps Model 3171 E71-5.

IV.

PREREQUISITES A.

Obtain permission and signature from the Shift Supervisor before starting the test.

B.

Schedule this test to follow a monthly diesel operability test. This will provide a means for lowering the day tank to a level necessary to assure full transfer pump flow.

C.

Coordinate testing with the Control Room Operator.

V.

LIMITATIONS A.

Surveillance Requirements - Technical Specifications.

1.

None.

hp D CK O

8 P

A Rsvised By/Date Reviewed By/ Data s prot d By/Date Rev Procedure Page 1 Of n 0---4/%6 T. Smith 5/8/86 R. Brungardt 6/4/86 3

6.3.12.8 3

Pages 1

m

4

?

1 k

}'

B.

Administrative Limits.

I' 1.

Attachment "A" shall be used to record the test and filed as part l

of the station records.

4 2.

All testing shall be coordinated with the Control Room Operator.

3.

Test is to be run once per cycle.

VI.

PRECAUTIONS

(

A.

No smoking or open flame in the Day Tank Room.

t

}.

B.

Clean up any spilled fuel.

VII. TEST EQUIPMENT I

A.

Stopwatch.

j B.

Flow meter (stored in the tool crib).

i i

VII

I. PROCEDURE

4 A.

Diesel Generator Fuel Oil Transfer Pu'ap Flow Test.

I 1.

Obtain the Shif t Supervisor's signature.

l 2.

Record the levels in diesel oil storage tanks A and B.

3.

Place the switches for both fuel oil transfer pumps A and B in off l

prior to starting the diesel generators for the monthly operability test when this procedure is to be performed.

}

Note: Both switches must be in the OFF position since either pump j.

will start on a low level in either day tank.

)

)

4.

Close valve DCDO-11 (DGDO-15) and return the broken seal to -the Shift Supervisor.

[

i 5.

Close valve DGDO-19 (DGDO-19) and return the broken seal to the

[

Shift Supervisor.

6.

Install the flow meter in the fill line near the top of the day tank.

t I

7.

To assure maximum transfer pump flow rates can be measured, verify t

that the day tank levels are < 40" prior to starting and record the level in day tank 1 (2).

i l

8.

Record the flow meter indication.

)

9.'

Open valve DGDO-ll (DCDo-15).

1 1

i i

i j

Procedure Number 6.3.12.8 Date

4. CSI Revision 3

Page. 2 Of 3

Pages,

f i.

l

10.

Start fuel oil transfer pump A (B) and operate it for 5 minutes.

During operation record transfer pump A (B) discharge pressures as indicated on DGDO-PI-634A (DGDO-PI-634B) and DGDO-PI-636A (DGDO-PI-636B).

11.

Stop transfer pump A (B) and record the flow meter indicatibn.

12. Close valve DGDO-11 (DGDO-15).

r 13.

Remove the flow meter and return the fill line back to normal.

14. Open valve DGDO-11 (DGDO-15) and install the new seal as issued by the Shift Supervisor.

15.

Open valve DGDO-19 (DGDO-19) and install the new seal as issued by the Shift Supervisor.

~

16.

Perform independent (Licensed Operator) verification that the valves closed in Steps 4. and 5. have been reopened and sealed.,

i 17.

Place one transfer pump control switch in AUTO and the other in AUTO ALTERNATE.

i 18.

Return the flow meter to the tool c' rib.

1

19. Notify the Shift Supervisor thnt the test is completed.

IX.

ATTACHMENTS A.

Diesel Generator Fuel Oil Transfer Pump Flow Test Data Sheets.

L 4

.i 4

a 4

IProcedure Number 6.3.12.8 Date A. 6 9b Revision 3

Page _ 3 Of 3

Pages

s~m un.. v u o,..

.,an.

ua urr.nnituna nanunu DIESEL GENERMOR FUEL oil 'IRANSI ER PUMP -

ATTACHMENT "A" SURVEILLANCE PROCEDURE 6.3.12.8 FLOW TEST DIESEL CENERATOR FUEL OIL TRANSFER PUMP. FLOW TEST DG-1 DG-2 1.

Obtained Shift Supervisor's signature.

2.

Recorded levels in diesel oil storage tanks A and B; HH XXH Tank A:

Tank B

3.

Placed both fuel oil transfer pumps A and B switches in XXXX XXXX off prior to starting diesel operability test.

4 Closed valve DCD0-11 (DGD0-15) and returned broken seal --------------

XXXX XX,U to Shift Supervisor.

5.

Closed valve DGD0-19 (DGD0-19) and returned broken seal XXXX XXXX c d S h i f t S u p e rv i s o r. -----------------------------

6.

Installed flow meter in fill line near top of day tank.

7.

Verified day tank levels are < 40" prior to starting XXXX XXXX and recorded levels; Tank 1:

Tank 2

8.

Recorded flow meter indication.

9.

Opened valve DGDO-11 (DGDO-15).

10.

Started fuel oil transfer pump A (B), operated it f or ----------------

XXXX XXXX 5 minutes, and recorded discharge pressures below.

11.

Stopped transfer pump A (B) and recorded flow n.eter XXXX XXXX 4

indication.

12. Closed valve DGDO-11 (DGDO-15).

13.

Removed flow meter and returned fill line back to normal.

14. Opened valve DGDO-11 (DGD0-15) and installed new seal as -----

XXXX XXXX issued by Shif t Supervisor.

15. Opened valve DCDO-19 (DGDO-19) and installed new seal as XXXX XXXX is s u e d b y S hi f t S u p e rvis o r. ------------------
16. Performed independent (Licensed Operator) verification XXXX XXXX that valves closed in Steps 4. and 5 have been reo XXXX XXXX and se a led. ------------------------pe ne d
17. Placed one transfer pump control switch in AUTO and the XXXX XXXX other in AUTO ALTERNATE.

18.

Returned flow meter to tool crib. --------------

19.

Notified Shift Supervisor that test is completed.

FLOW METER DATA DAY TANK 1 DAY TANK 2 Final Initial Calculated

  • DISCHARGE PRESSURE DATA TRANSFER PUMP A TRANSFER PUMP B PI-634A psig PI-634B psig PI-636A psig PI-636B psis
  • Minimum flow is 5 gallons / minute; diesel consumption at full low is 270 gallons /

hour or 4.5 gallons / minute.

Test Instrument Number:

Prec: dure Number 6.3.12.8 Date

4. CM Revision 3

Page 1

Of 2

Pages

ooo. u

..o o o...... n. au.. o r r.nn t tuns nnnenu f

DIESEL GENERATOR FUEL OLL TRAESFER PLHP

'ATTACllMENT "A" SURVEILLANCE PROCEDURE

'6.3.12.8 FLOW TEST DIESEL GENERATOR FUEL OIL TRANSFER PUMP FLOW TEST Discrepancies:

4 e

l G

Operator

/

Date Shift Supervisor _

/

Permission To Start Date Shift Supervisor

/

Test Complete And Reviewed Date Shift Supervisor

/

NCR Written If Required Date Work Item (s) Initiated If Required R; viewed By

/

Date Pr:c: dure Number 6.1.12.8 Date r'.' // -

Revision 3

Fage 1 Of 2

Pages

.