Other: ML20137L000, ML20206T655, ML20206T679, ML20206T705, ML20206T726, ML20206T748, ML20206T776, ML20206T792, ML20206T817, ML20206T843, ML20206T847, ML20206T875, ML20206T899, ML20206T913, ML20206T921, ML20206T931, ML20206T937, ML20206T949, ML20206T966, ML20206T981, ML20206T986, ML20206U003, ML20212B914, ML20262E700, ML20262E704, NLS8400108, Forwards Second 10-yr Inservice Insp Plan, NLS8600021, Forwards Addenda to Rev 3 to Inservice Insp Program for ASME Class 1,2 & 3 Components, NLS8600248, Forwards Rev 5 to Inservice Testing Program for ASME Class 1,2 & 3 Components, for Second 10-yr Testing Program. General Pump Testing Procedure 3.9 & General Valve Testing Procedure 3.10 Being Revised to Incorporate Rev 1 Changes
|
MONTHYEARML20206T9131978-10-23023 October 1978 Rev 5 to Surveillance Procedure 6.3.16.1, Reactor Equipment Cooling - Pump Operability Test Project stage: Other ML20206T9861981-08-28028 August 1981 Rev 0 to Surveillance Procedure 6.4.1.8, Control Rod Drive Hydraulic Control Unit Accumulator Leakage Test Project stage: Other NLS8400108, Forwards Second 10-yr Inservice Insp Plan1984-04-0303 April 1984 Forwards Second 10-yr Inservice Insp Plan Project stage: Other ML20206U0031984-07-23023 July 1984 Rev 13 to Nuclear Performance Evaluation Procedure 10.9, Control Rod Scram Time Evaluation Project stage: Other ML20100M8071984-11-28028 November 1984 Draft Rev 9 to QA Policy for Calvert Cliffs Nuclear Power Plant Project stage: Draft Other ML20206T9371984-12-0606 December 1984 Rev 10 to Surveillance Procedure 6.3.18.2, Svc Water Motor Operated Valve Operability Test Project stage: Other ML20206T9311984-12-0606 December 1984 Rev 6 to Surveillance Procedure 6.3.18.1, Svc Water Pump Operability Test Project stage: Other ML20206T8751985-01-0303 January 1985 Rev 11 to Surveillance Procedure 6.3.12.2, Diesel Generator Starting Air Compressor Operability Project stage: Other ML20262E7001985-04-25025 April 1985 Flow Diagram:Circulating,Screen Wash & Service Water Systems. Sheet 1 of 5. Actual Rev STATUS:N14 Project stage: Other ML20262E7041985-04-26026 April 1985 Flow Diagram:Circulating,Screen Wash & Service Water Systems. Sheet 2 of 5. Actual Rev STATUS:N07 Project stage: Other ML20206T9661985-05-0202 May 1985 Rev 13 to Surveillance Procedure 6.3.19.1, Standby Gas Treatment Operability Test Project stage: Other ML20129J6611985-07-12012 July 1985 Submits Revised Inservice Testing Relief Requests RV-03 Re Reactor Recirculation Loops a & B Discharge Bypass Valves, Reflecting Current Pipe Configuration & RP-05 Re HPCI Test Method & Updated Request Index Project stage: Request ML20206T7761985-08-18018 August 1985 Rev 11 to Surveillance Procedure 6.3.8.4, Standby Liquid Control Manual Initiation Test Tank to Reactor Vessel Project stage: Other ML20206T8171985-09-13013 September 1985 Rev 12 to Surveillance Procedure 6.3.10.2, Instrument Line Flow Check Valve Test Project stage: Other ML20137L0001985-10-31031 October 1985 Addenda to Rev 3 to Inservice Insp Program for ASME Class 1,2 & 3 Components Project stage: Other ML20206T7481985-11-21021 November 1985 Rev 15 to Surveillance Procedure 6.3.6.1, RCIC Test Mode Surveillance Operation Project stage: Other ML20206T8431985-12-11011 December 1985 Rev 0 to Surveillance Procedure 6.3.10.16, Check Valves in Cooling Sys of Diesel Generators Integrity Verification Project stage: Other ML20206T9211986-01-16016 January 1986 Rev 12 to Surveillance Procedure 6.3.16.2, Reactor Equipment Cooling Motor Operated Valve Operability Test Project stage: Other NLS8600021, Forwards Addenda to Rev 3 to Inservice Insp Program for ASME Class 1,2 & 3 Components1986-01-17017 January 1986 Forwards Addenda to Rev 3 to Inservice Insp Program for ASME Class 1,2 & 3 Components Project stage: Other ML20206T7051986-01-30030 January 1986 Rev 18 to Surveillance Procedure 6.3.4.1, Core Spray Test Mode Surveillance Operation Project stage: Other ML20154A5251986-02-12012 February 1986 Forwards Request for Addl Info Re Inservice Testing Program, Based on Review of 840615,850522 & 0722 Ltrs Describing Second 10-yr Inservice Testing Program.Response Requested within 45 Days Project stage: RAI ML20206T8471986-03-0606 March 1986 Rev 17 to Surveillance Procedure 6.3.12.1, Diesel Generator Operability Test Project stage: Other ML20206T9491986-03-0606 March 1986 Rev 15 to Surveillance Procedure 6.3.18.3, Svc Water Surveillance Operation Project stage: Other ML20206T7261986-03-13013 March 1986 Rev 21 to Surveillance Procedure 6.3.5.1, RHR Test Mode Surveillance Operation Project stage: Other ML20206T9811986-04-24024 April 1986 Rev 17 to Surveillance Procedure 6.3.20.1, RHR Svc Water Booster Pump Flow Test & Valve Operability Test Project stage: Other ML20211A1361986-04-28028 April 1986 Trip Rept of 860415-16 Site Visit for Pump & Valve Inservice Testing Program Working Meeting Re Questions Resulting from Program Review.List of Attendees,Questions Serving as Agenda for Meeting & Responses to Questions Encl Project stage: Meeting ML20211A0891986-05-30030 May 1986 Forwards Contractor Summary of 860412 & 16 Meetings at Facility Re to Recipient Requesting Addl Info on Second 10-yr Inservice Testing Program.Correction Made on Page 2 of Summary Project stage: Meeting ML20206T8991986-06-0505 June 1986 Rev 3 to Surveillance Procedure 6.3.12.8, Diesel Generator Fuel Oil Transfer Pump Flow Test Project stage: Other ML20206T7921986-06-0505 June 1986 Rev 1 to Surveillance Procedure 6.3.9.1, MSIV Accumulator Functional Test Project stage: Other ML20206T6551986-06-12012 June 1986 Rev 13 to Surveillance Procedure 6.3.2.1, Automatic Depressurization Sys Manual Valve Actuation Project stage: Other ML20206T6791986-06-12012 June 1986 Rev 23 to Surveillance Procedure 6.3.3.1, HPCI Test Mode Surveillance Operation Project stage: Other ML20206T6381986-06-30030 June 1986 Forwards Response to W Long 860212 Request for Addl Info Re Inservice Testing Program & 860415-16 Meetings Re Open Items.Surveillance Procedures,Including Procedure 6.3.2.1, Also Encl Project stage: Meeting NLS8600248, Forwards Rev 5 to Inservice Testing Program for ASME Class 1,2 & 3 Components, for Second 10-yr Testing Program. General Pump Testing Procedure 3.9 & General Valve Testing Procedure 3.10 Being Revised to Incorporate Rev 1 Changes1986-07-30030 July 1986 Forwards Rev 5 to Inservice Testing Program for ASME Class 1,2 & 3 Components, for Second 10-yr Testing Program. General Pump Testing Procedure 3.9 & General Valve Testing Procedure 3.10 Being Revised to Incorporate Rev 1 Changes Project stage: Other ML20212B9141986-07-31031 July 1986 Vols I & II of Rev 5 to Inservice Testing Program for ASME Class 1,2 & 3 Components, for Second 10-yr Testing Program Project stage: Other ML20148C9481988-01-13013 January 1988 Forwards Safety Evaluation of Util Second 10-yr Inservice Testing Program Submitted w/860730 Ltr.Certain Relief Requests Denied Where Proposed Alternative Testing Unacceptable.Technical Evaluation Rept Also Encl Project stage: Approval ML20151H8461988-04-13013 April 1988 Forwards Response to Anomalies Identified in NRC 880113 SER Re Facility Inservice Testing Program.Reactor Equipment Pumps Will Be Tested in Accordance W/Section Xi.Util Evaluating Need for Any Relief Request in Performing Test Project stage: Request ML20151L3111988-07-29029 July 1988 Forwards Revised & New Relief Requests & Program Corrections to Second 10 Yr Inservice Testing Program.Addl Review of Program Identified Need for Further Changes to Program Including Rev of Existing Relief Requests Project stage: Request 1986-01-16
[Table View] |
Text
.
_.....oo....
......o........,
DIESEL GEt4ERAf0R kULL OlL IR<GSEER PUMP SURVEILLANCE PROCEDURE 6.3.12.8 FLOW TEST s
a I.
PURPOSE A.
To provide a detailed instruction for station personnel to perform a flow test of the diesel generator fuel oil transfer pumps.
l II.
DISCUSSION A.
Diesel fuel oil is stored in two underground tanks. Diesel generator 4
fuel oil transfer pumps A and B transfer fuel to day tanks in the Diesel Rooms. Either pump can feed the day tank in DG-1 Room, or DG-2 Room, or both.
III. REFERENCES A.
USAR.
~
1.
Volume IV,Section VIII, Subsection 5.
B.
Flow Diagrams.
1.
B & R Drawing 2011. Sheet 1.
~
2.
B & R Drawing 2077.
)
C.
Electrical Diagrams.
1.
B & R Drawing 3045.
D.
Vendor Manuals.
1.
Gould Pumps Model 3171 E71-5.
IV.
PREREQUISITES A.
Obtain permission and signature from the Shift Supervisor before starting the test.
B.
Schedule this test to follow a monthly diesel operability test. This will provide a means for lowering the day tank to a level necessary to assure full transfer pump flow.
C.
Coordinate testing with the Control Room Operator.
V.
LIMITATIONS A.
Surveillance Requirements - Technical Specifications.
1.
None.
hp D CK O
8 P
A Rsvised By/Date Reviewed By/ Data s prot d By/Date Rev Procedure Page 1 Of n 0---4/%6 T. Smith 5/8/86 R. Brungardt 6/4/86 3
6.3.12.8 3
Pages 1
m
4
?
1 k
}'
B.
Administrative Limits.
I' 1.
Attachment "A" shall be used to record the test and filed as part l
of the station records.
4 2.
All testing shall be coordinated with the Control Room Operator.
3.
Test is to be run once per cycle.
VI.
PRECAUTIONS
(
A.
No smoking or open flame in the Day Tank Room.
t
}.
B.
Clean up any spilled fuel.
VII. TEST EQUIPMENT I
A.
Stopwatch.
j B.
Flow meter (stored in the tool crib).
i i
VII
I. PROCEDURE
4 A.
Diesel Generator Fuel Oil Transfer Pu'ap Flow Test.
I 1.
Obtain the Shif t Supervisor's signature.
l 2.
Record the levels in diesel oil storage tanks A and B.
3.
Place the switches for both fuel oil transfer pumps A and B in off l
prior to starting the diesel generators for the monthly operability test when this procedure is to be performed.
}
Note: Both switches must be in the OFF position since either pump j.
will start on a low level in either day tank.
)
)
4.
Close valve DCDO-11 (DGDO-15) and return the broken seal to -the Shift Supervisor.
[
i 5.
Close valve DGDO-19 (DGDO-19) and return the broken seal to the
[
Shift Supervisor.
6.
Install the flow meter in the fill line near the top of the day tank.
t I
7.
To assure maximum transfer pump flow rates can be measured, verify t
that the day tank levels are < 40" prior to starting and record the level in day tank 1 (2).
i l
8.
Record the flow meter indication.
)
9.'
Open valve DGDO-ll (DCDo-15).
1 1
i i
i j
Procedure Number 6.3.12.8 Date
- 4. CSI Revision 3
Page. 2 Of 3
Pages,
f i.
l
10.
Start fuel oil transfer pump A (B) and operate it for 5 minutes.
During operation record transfer pump A (B) discharge pressures as indicated on DGDO-PI-634A (DGDO-PI-634B) and DGDO-PI-636A (DGDO-PI-636B).
11.
Stop transfer pump A (B) and record the flow meter indicatibn.
- 12. Close valve DGDO-11 (DGDO-15).
r 13.
Remove the flow meter and return the fill line back to normal.
- 14. Open valve DGDO-11 (DGDO-15) and install the new seal as issued by the Shift Supervisor.
15.
Open valve DGDO-19 (DGDO-19) and install the new seal as issued by the Shift Supervisor.
~
16.
Perform independent (Licensed Operator) verification that the valves closed in Steps 4. and 5. have been reopened and sealed.,
i 17.
Place one transfer pump control switch in AUTO and the other in AUTO ALTERNATE.
i 18.
Return the flow meter to the tool c' rib.
1
- 19. Notify the Shift Supervisor thnt the test is completed.
IX.
ATTACHMENTS A.
Diesel Generator Fuel Oil Transfer Pump Flow Test Data Sheets.
L 4
.i 4
a 4
IProcedure Number 6.3.12.8 Date A. 6 9b Revision 3
Page _ 3 Of 3
Pages
s~m un.. v u o,..
.,an.
ua urr.nnituna nanunu DIESEL GENERMOR FUEL oil 'IRANSI ER PUMP -
ATTACHMENT "A" SURVEILLANCE PROCEDURE 6.3.12.8 FLOW TEST DIESEL CENERATOR FUEL OIL TRANSFER PUMP. FLOW TEST DG-1 DG-2 1.
Obtained Shift Supervisor's signature.
2.
Recorded levels in diesel oil storage tanks A and B; HH XXH Tank A:
- Tank B
3.
Placed both fuel oil transfer pumps A and B switches in XXXX XXXX off prior to starting diesel operability test.
4 Closed valve DCD0-11 (DGD0-15) and returned broken seal --------------
XXXX XX,U to Shift Supervisor.
5.
Closed valve DGD0-19 (DGD0-19) and returned broken seal XXXX XXXX c d S h i f t S u p e rv i s o r. -----------------------------
6.
Installed flow meter in fill line near top of day tank.
7.
Verified day tank levels are < 40" prior to starting XXXX XXXX and recorded levels; Tank 1:
- Tank 2
8.
Recorded flow meter indication.
9.
Opened valve DGDO-11 (DGDO-15).
10.
Started fuel oil transfer pump A (B), operated it f or ----------------
XXXX XXXX 5 minutes, and recorded discharge pressures below.
11.
Stopped transfer pump A (B) and recorded flow n.eter XXXX XXXX 4
indication.
- 12. Closed valve DGDO-11 (DGDO-15).
13.
Removed flow meter and returned fill line back to normal.
- 14. Opened valve DGDO-11 (DGD0-15) and installed new seal as -----
XXXX XXXX issued by Shif t Supervisor.
- 15. Opened valve DCDO-19 (DGDO-19) and installed new seal as XXXX XXXX is s u e d b y S hi f t S u p e rvis o r. ------------------
- 16. Performed independent (Licensed Operator) verification XXXX XXXX that valves closed in Steps 4. and 5 have been reo XXXX XXXX and se a led. ------------------------pe ne d
- 17. Placed one transfer pump control switch in AUTO and the XXXX XXXX other in AUTO ALTERNATE.
18.
Returned flow meter to tool crib. --------------
19.
Notified Shift Supervisor that test is completed.
FLOW METER DATA DAY TANK 1 DAY TANK 2 Final Initial Calculated
- DISCHARGE PRESSURE DATA TRANSFER PUMP A TRANSFER PUMP B PI-634A psig PI-634B psig PI-636A psig PI-636B psis
- Minimum flow is 5 gallons / minute; diesel consumption at full low is 270 gallons /
hour or 4.5 gallons / minute.
Test Instrument Number:
Prec: dure Number 6.3.12.8 Date
- 4. CM Revision 3
Page 1
Of 2
Pages
ooo. u
..o o o...... n. au.. o r r.nn t tuns nnnenu f
DIESEL GENERATOR FUEL OLL TRAESFER PLHP
'ATTACllMENT "A" SURVEILLANCE PROCEDURE
'6.3.12.8 FLOW TEST DIESEL GENERATOR FUEL OIL TRANSFER PUMP FLOW TEST Discrepancies:
4 e
l G
Operator
/
Date Shift Supervisor _
/
Permission To Start Date Shift Supervisor
/
Test Complete And Reviewed Date Shift Supervisor
/
NCR Written If Required Date Work Item (s) Initiated If Required R; viewed By
/
Date Pr:c: dure Number 6.1.12.8 Date r'.' // -
Revision 3
Fage 1 Of 2
Pages
.