Lists Subjs of Civil/Structural Open Issues Identified During Resolution of Allegations Re Facility,Including Reinforcing Steel Omitted in Reactor Cavity
ML20137J318
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/11/1984
From: Jeng D
Office of Nuclear Reactor Regulation
To: Lear G
Office of Nuclear Reactor Regulation
Shared Package
ML17198A292 List: ... further results
References
FOIA-85-59 NUDOCS 8512020584
Download: ML20137J318 (2)


Text

..

OCT 111984 4

HEMORANDLC F0P.: George Lear. Chief Structural and Geotechnical Engineering Branch Division of Engineering FRON:

David C. Jeng. Section Leader Structural Engineering Section A Structural and Geotechnical Engineering Branch Division of Engineering

SUBJECT:

STATUS ON RESOLUTION OF COMANCHE PEAK CIVIL / STRUCTURAL ALLEGATI0!is Over a period of three months since July 1984. I have assisted Mr. L. C.

Shao. Deputy Director. DET/RES in managing a tear.; of civil and structural experts at the Comanche Peak piant site and engaged in resolving some 56 allegations. I also assisted Mr. Shao in making presentations to H.

Denton and E. Case on Septer:ber 17, 1984 and the Texas Utilities Electric Corrpeny on September 18, 1984 on civil / structural open issues identified by the civil / structural team. The open issues mean items that may have potential safety significance and require action on the part of the u tility. The following are the subjects of the civil / structural open m

issues. Also enclosed are the descriptions of the issues and the viewgraphs used by Mr. Shao in the meetings on September 17 and Septecber 18. 1984.

(1) Reinforcing steel omitted in the reactor cavity.

(2) Falsification of concrete compression strength test results (3) Maintenance of air gap between concrete structures.

(4) Seismic Design of Control Room Ceiling Elernents.

(5) Unauthorized cutting of rebar in the fuel handling building.

The group is presently working at the Nicholson Lane RES office to finalize seventeen (17) SSERs. The SSER preparation effort is estimated c sp Opt 20205M W ppH FOIA PDR c/\\HDEO S-59 s

l

  • j...

me moau na nosomacu eno OFFICIAL RECORD COPY

~

OCT II 1934 C. Lear to continue until October 31,19G4.

It is prot.able that the Comanche Peak ASLB will hold future hearings on sorne or all of the above identified open issues.

If the ASLB hearings are held, cy active participation addressing the issues will be recuired. Also r.y continued effort, on a part-time basis, in cor'pleting the subject task will be needed. The entire effort is esticated to last until the end of 1904.

David C. Jeng, Section Leadcr Structural Engineering Section A Structural and Geotechnical Engineering Branch Division of Engineering Enclosurcs:

1.

Detailed Description of Civil Structural Open Issues 2.

Viewgraphs Used in Septenter 17-18 rectings cc:

R. Vollrer L. Shao J. Knight T. Sullivan DISTRIBUTION:

SGEB RD SGEB SUBJ DJeng a

c='c ' >

..gEB.:.pg.....'.".94...

~=>

ecn >

10/ti/84

,cero..n..

..*'"c" OFFICIAL RECORD COPY

....