Text
_ - _. - _.
l
(
I" I
ISSUE TEXAS UTILITIES GENERATING CO.
REVISION PAGE -
NtNBER DATE CPSES
-(
QI-QP-l l. 0-8 0
7-12-78 1 of 4 CONCRETE INSPECTION
/
7-e n REPARED BY:
wm ;
PRODUCTION DATE APPROVED BY: h n/78 I
DATE 1.O REFERENCES 1-A Specification 2323-SS-9. " Concrete"
,3 fffsllf 2.0 GENERAL FOR INFORMATION ON-J 2.1 PURPOSE AND SCOPE This instruction establishes the inspection criteria utilized during the production of concrete to assure compliance with Ref. 1-A.
2
I R E foy r3. P. C.A F "
P1D P 3.0 INSTRUCTION
.,p,
?
g 3.1 INSPECTIONREQUIREkEhTS 3.1.1 Daily Batch Plant Operations Acceptance criteria for daily batch plant operations. (*)
Designates hold point items checked before comencing batching operations.
- a.
All mix design cards approved and signed by a QC inspector.
- b.
Determination of aggregate moistures.
- c.
Determination of Di for fine aggregate.
- d.
Aggregate moisture determinations compensated for.
- e.
Aggregate gradation testing complete.
- f.
Mix design card used corresponds to mix specified by the field.
- g.
Mix design card has same proportions as original mix design.
h' Concrete Bulk materials stored in accordance with Ref.1-A.
- 1.
Batch plant scales in calibration.
'(
G512O20579 851106 PDR FOIA OAR DE8 5-59 PDR TUGCO QA
S*
e IN TEXAS UTILITIES GENERATING CO.
REVISION PAGE N
~
)I-QP-11.0-8 0
7-12-78 2 of 4 j.
Information on batch tickets is correct.
k.
Batch ticket print-outs within specified tolerances for cement, aggregates, water and admixtures.
1.
Random check of batch tickets for verification of water-cement ratio.
3.1.2 Concrete Mixing and Conveying Acceptance criteria for daily mixing and conveying:
Truck mixers clean and free of concrete build up.
a.
b.
Trucks empty prior to start of loading.
Check of central mixer operating time af ter addition of c.
materials.
d.
Truck mixers loaded at backup plant required to complete 70 revolutions at mixing speed before start of delivery.
Truck revolu, tion counters must function properly.
.e.
-f.
Batch tickets properly filled out for receipt and add-water after delivery.
3.2 DOCUMENTATION The QC Inspector shall verify on th'e Inspection Report (Figure 1) that requirements of this instruction have been met and submit it to the QC Documentation Supervisor.
1 3.3 CONCRETE DESIGN MIX PROPORTION REPORT The Civil QC Supervisor shall verify concrete design mix propor-tions for each mix number on the Concrete Design Mix Proportion Report (Figure 2) when prepared by B&R Construction Engineering.
i The revision will then be approved by the B&R Project Engineer and issued through the Site Document Control Center.
TucCO QA
. m n-
(
INSTRUCTION ISSUE TEXAS UTILITIES GENERATING CO.
ggggg PAGC NtNBER DATE
')
CPSES 7-12-78 3 of 4 QI-9P-11. 0-8 0
FIGURE 1 COMANCHE PE AK STEAM ELECTRIC STATION s-rt Y or INSPECTION REPORT M
i jatSIEM/5f avCTw s C(5:6ha144 a
.itu C&5046Pleom CL h T*F 4a T esh h0 f.
3!
4 5PEc ha R(v AEF QC DOC a Alv 6 Cna=6L mo nei>5v t G4 IE3T [ Quip eOENT.hQ a
l 4
7 9
h 58t C f tO IN ECTIO4 SPt TION g
IN P1 som vte C s 4 ansP RtSukTS O inse CYioa Co sarto, aLL aasiCaste ira s narissacroar C thlMCYNye Countif 0. UNtatistaCTCaf ITf uS LetT10 SELow INSPECTION ATTRIBUTES O
DaTC g g g g g, g s
s
[
I' t/
I 3 -
4 ptM*AES (DWG3,$M C 3, E TC j i
i i"
I"'"'
anatio mCa no lR CLCsco O
8 i
CC tN5PCC Y CR as g
.g a
TUGco QA
l
(
I",
IE TEXAS (JTILITIES GENERATING CO.
REVISION PAGE CPSES
-~s.
/
1 7-12-78 4 of 4
\\ /
JI-QP-11.0-8 0
FIGURE 2 CONCRETE DESIGN MIX PROPORTI'JN F.EPORT TH0 JECT: COMANCHE PE AK JOS NO.
UMT PAGi _ op 111 Ot 880m H I 10ENYtFIC Af TON COMANCHE Pt Ait ME NUMSER OtllGNAft0N 8&HLET10AOt98NAfl0N Dfp0NtfAINGTM MA A. AGG. Se tt enas. lLUMe
_ tyt$ HE UNef ertlGHT PE ACENT A R CDNcef 78 ter PeO80R? IONS APPROV ALS Aoth u f va g t ts tuso 0711 COA R$ t OC '
sta DTE
- SANO, AGGREGAfg WrafER. EbOINE E R' '
EmotNEE R CIMENT it es it ein twsA vwee evn e.,
- u. A.
etesi i= ri Ats cave i=ri A ts eAn ne v. NO. nave n esi i
)
v e
.e-
=m
- i. ene serven a Arten A man NuMesa eNo. Carts A metAnoto set coNCn ve nez.
g L Of fitpTDON OF 4GE TYPit. STANDAR0=eO' MAIsafuM PLACEMENT ffuranA? Vat MA35tvl*70'GAAKlasuas PLACEMENT TEMPSRATVel 4
J"
!v)
TUGCO QA E~
.-