I e
' INSTRUCTION ISSUE f
TEXAS UTILITIES GENERATING CO.
NUMBER REVISION
'DATE l
PAGE i
CPSES w/-.
I Ql-CP-11.0-12 0
5-14-80 1 of 2 l
lNSPECTION OF PRESSURE PREPARED BY:
('
[ ('t I'i.
J~/N/
GROUTED BASE PLATES DATE APPROVED BY:
MS
[de g
DATE l
1.0 REFERENCES
i 1-A CEl-25,
" Grouting Pipe Support Wall and Ceiling Plates" l
i 1-B CP-CPM-6.9F Supplement II i
i
, -,.. - pa
,,.,, ~..
2.0 GENERAL
, f:
6
{
2.1 PURPOSE D. 'F
,. bi
- bte, I
V.'.
'?
~
I 5- -
n
,Jr l
This instruction provides the QC I n,s p e c t o r with the criteria to be used when inspecting Expoy Adhesive 8
Pressure Grout on "Q" support base plates as required by Reference I-B.
i 2.2 SCOPE l
This instruction is to be used when inspecting the I
pressure grout used on ASME S e c,t i o n til "NF" supports.
3.o INSTRUCTION 3.1 INSPECTION VERIFICATION l
Prior ts the application of the epoxy pressure grout l
the QC Inspector shall verify the area (or surrounding i
area) is free from oil, grease, and is clean and dry.
i The mixing of the epoxy resin and resin converter shall i
be as per the manufacturer's instructions and Reference l
i 1-A.
i I
0512020521 G51106 U
I TUGCO OA i
I i
Form pec. 4 L
I J
l i
f INSTRUCTION i
ISSUE REVISION PAGE
{
NUMBER DATE
- l. O, TEXAS UTILITIES GENERATING CO.
l CPSES i
I l
Ql-QP-11.0-12 0
5-14-80 i 2 or :
i i
Hole size for the pressure grout application shall be as specified in Reference 1-A and shall be in a suitable location to grout the void area.
[
Escoweld 7502 will cure in 24-48 hours at ambient temp-eratures above 60*F.
If the temperature is below 60 F,
the area to be grouted shall be heated to 60 F or higher until curing has taken place.
The heating prior to grouting, if required, should be verified prior to grout j
placement.
I j
Grout dams shall be used when placing the' pressure grout.
3.2 DOCUMENTATION I
i Grouting activitles shalI be documented as per CCP-16 Section 4.6.