Rev 0 to Procedure QI-QP-11.0-12, Insp of Pressure Grouted Base Plates
ML20137H963
Person / Time
Site: Comanche Peak  
Issue date: 05/14/1980
From:
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML17198A292 List: ... further results
References
FOIA-85-59 QI-QP-11.0-12, NUDOCS 8512020521
Download: ML20137H963 (2)


Text

,

I e

' INSTRUCTION ISSUE f

TEXAS UTILITIES GENERATING CO.

NUMBER REVISION

'DATE l

PAGE i

CPSES w/-.

I Ql-CP-11.0-12 0

5-14-80 1 of 2 l

lNSPECTION OF PRESSURE PREPARED BY:

('

[ ('t I'i.

J~/N/

GROUTED BASE PLATES DATE APPROVED BY:

MS

[de g

DATE l

1.0 REFERENCES

i 1-A CEl-25,

" Grouting Pipe Support Wall and Ceiling Plates" l

i 1-B CP-CPM-6.9F Supplement II i

i

, -,.. - pa

,,.,, ~..

2.0 GENERAL

, f:

6

{

2.1 PURPOSE D. 'F

,. bi

bte, I

V.'.

'?

~

I 5- -

n

,Jr l

This instruction provides the QC I n,s p e c t o r with the criteria to be used when inspecting Expoy Adhesive 8

Pressure Grout on "Q" support base plates as required by Reference I-B.

i 2.2 SCOPE l

This instruction is to be used when inspecting the I

pressure grout used on ASME S e c,t i o n til "NF" supports.

3.o INSTRUCTION 3.1 INSPECTION VERIFICATION l

Prior ts the application of the epoxy pressure grout l

the QC Inspector shall verify the area (or surrounding i

area) is free from oil, grease, and is clean and dry.

i The mixing of the epoxy resin and resin converter shall i

be as per the manufacturer's instructions and Reference l

i 1-A.

i I

0512020521 G51106 U

PDR FOIA CARDE85-59 PDR i

I TUGCO OA i

I i

Form pec. 4 L

I J

l i

f INSTRUCTION i

ISSUE REVISION PAGE

{

NUMBER DATE

l. O, TEXAS UTILITIES GENERATING CO.

l CPSES i

I l

Ql-QP-11.0-12 0

5-14-80 i 2 or :

i i

Hole size for the pressure grout application shall be as specified in Reference 1-A and shall be in a suitable location to grout the void area.

[

Escoweld 7502 will cure in 24-48 hours at ambient temp-eratures above 60*F.

If the temperature is below 60 F,

the area to be grouted shall be heated to 60 F or higher until curing has taken place.

The heating prior to grouting, if required, should be verified prior to grout j

placement.

I j

Grout dams shall be used when placing the' pressure grout.

3.2 DOCUMENTATION I

i Grouting activitles shalI be documented as per CCP-16 Section 4.6.

i I

l, 5

I 5

s l.

i i

i e

s l

l i

1

,i t

l l