Rev 1 to Procedure QI-QP-11.0-12, Insp of Pressure Grouted Base Plates
ML20137H951
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/28/1980
From:
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML17198A292 List: ... further results
References
FOIA-85-59 QI-QP-11.0-12, NUDOCS 8512020517
Download: ML20137H951 (1)


Text

!

TEXAS UTILITIES GENERATING CO.

NU E

REVISION D

E PAGE O,

j

'v' 01-CP-11.0- 12 l 1

I 10/28/P 1 of 1 i

i PREPARED SV-ffj k ;!.<3 INSPECT!0: OF PRESSURE l

l GPOUTED BASE PLATES l

APPROVED BY:

M[4'8/60

(/

DATE~ '

l I

I

1.0 REFERENCES

I I;

CEI-25, " Grouting Pipe Support Wall and Ceiling Plates" 2.0 GENEPAL i

2.1 PURPOSE This instruction provides the OC Inspector with the cri ia to be used when inspecting Epoxy Adhesiv,e P essure %i!

~, support 6

base plates.

hSf"h j.5ID h'ki,A R

68 1 b

l

.j

- 2. 2 SCOPE jf@

s This instruction 5

be used when inspecting the pressure arout used on ASME Section III Subsection NF,and Class 5 supports.

3.0 INSTRUCTION j

I 3.1 INSPECTION VERIFICATION i

I Prior to application of the epoxy, as much as possible, verify l

that the grouting surface and surroundi.ng area is clean and dry.

j Verify grout dans are provided along plate edge.

The mixing of the epoxy resin and resin converter shall be as per l

the manufacturer's instructions and Reference 1-A.

i l

Hole size shall be as specified in Reference 1-A and ' located in i

void area.

j If required, heating should be verified prior to grout placement, i

i Acceptable temperatures shall be naf ntained until curing has taken place.

Escoweld 7502 will cure in 24-48 hours at ambient i

i temperatures above 60*F.

l l

j 3.2 DOCUMENTATION f

Grouting activities shall be documented as per Reference 1-A.

9512020517 851106 PDR FOIA i

,;,, CARDE8 5-59 PDR

- macooA l

.