ML20137D951
Text
- 4 W. 7 -4d 9 I
[ 'i
- e. [%
UNITED STATES 3."T[(f. 8 T
g NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, D. C. 20555 4, s,9 January 22, 1979 TO:
James P. Knight, Assistant Director for Engineering, DSS FROM:
Raymond F. Fraley, Executive Director, Advisory Committee on Reactor Safeguards
SUBJECT:
ACRS COMME?RS ON GUIDELINES FOR DETERMINING SEISMIC MARGINS AT DAVIS-BESSE NUCLEAR POWER ' STATION LNIT NO.1
'Ihe attached comments en the guidelines forwarded with your letter of November 17, 1978 to Dr. David Okrent have been provided by members of the ACRS in response to your request.
"y%
-l Ra rxl F. Fraley Executive Director
Attachment:
As stated cc:
H. Denton, NRR R. Savio, ACRS R. Wright, ACRS D. Okrent FILE:
EEP-2 8508230095 850722 PDR FOIA DELL 85-363 PDR d
M
(
COMMENTS ON PROPOSED GUIDELINES FOR DETERMINING SEISMIC MARGINS AT DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 I
1.
It is not clear as to the extent to which safety related instruments and the control room (as related to safe shutdown and residual heat removal) are considered in this analysis.
2.
It is not clear as to the extent to which failures of non-safety graded equipment which might compromise safe shutdown and residual heat removal will be considered in this analysis.
3.
The tabulation in Item 7-A of Attachment 2 should be expanded to in-clude the parameter:
(Stress Allowable) - (Total Stress) l Seismic Stress O
.-----2,--
--.----.4,_
_~m.
- -, - - - - - - -,,,_, e