Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20205B611 | 26 March 1999 | Notification of 990419 Meeting with Util in Rockville,Md to Discuss Licensing Issues at Plant,Including Racking of Cask Pit for Storage of Spent Fuel | |
ML20153F798 | 23 September 1998 | Forwards NRC Operator Licensing Exam Rept 50-346/98-301OL, (Including Completed & Graded Tests) for Tests Administered on 980803-07 | |
ML20153F829 | 23 September 1998 | Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered During Wk of 980803 | Shutdown Margin Job Performance Measure |
ML20236F358 | 26 June 1998 | Forwards NRC Insp Mc 0350, Staff Guidelines for Restart Approval, for Oversight Activities for Davis Besse Station | |
ML20236N864 | 11 June 1998 | Discusses TS Interpretation on Application of Davis Besse TS 3.6.5.1 & 3.6.5.2.TB Branch Recommends That Davis Besse Consider Converting TS to Improved Standard TS | |
ML20216F329 | 13 April 1998 | Accepts 980406 Licensee Request for Approval to Install machine-welded SG Tube Plugs in Accordance W/Provisions of Paragraph IWB-4230, Tube or Tubesheet Hole Plugging by Fusion Welding, of Section XI | |
ML20202E624 | 26 November 1997 | Notification of 971215 Meeting W/Util in Rockville,Md to Discuss Quality Assurance Program at Davis-Besse | |
ML20211Q471 | 16 October 1997 | Notification of 971113 Meeting W/Toledo Edison Co in Rockville,Md to Discuss Ultimate Heat Sink at Davis-Besse | Ultimate heat sink |
ML20211B556 | 23 September 1997 | Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970707-11 | Safe Shutdown Boric Acid Fitness for Duty Shutdown Margin Post Accident Monitoring Job Performance Measure Fuel cladding Continuous fire watch Fire Watch |
ML20211C509 | 23 September 1997 | Forwards NRC Operator Licensing Exam Rept 50-346/97-308OL (Including as-given Writtem Exam) for Tests Administered on 970707-10 | |
ML20149E741 | 16 July 1997 | Notification of 970821 Meeting W/Util in Rockville,Md to Discuss Instrument Drift Study | |
ML20137U205 | 14 April 1997 | Informs That Davis-Besse Nuclear Power Station Nuclear Assurance Dept Will Be Reorganized Into Two Separate Dept; DB Nuclear Assurance & DB Nuclear Support Svc,Effective, 970414 | |
ML20136F949 | 13 March 1997 | Notification of 970403 Meeting W/Util in Rockville,Md to Discuss Progress on Thermo-Lag Issue Resolution | |
ML20138J767 | 5 February 1997 | Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel | Generic Fundamentals Examination |
ML20134P901 | 26 November 1996 | Notification of 961204 Meeting W/Clei & Teco in Rockville,Md to Discuss Potential Submittals Concerning Proposed Merger of Centerior Energy Co & Oec | |
ML20149E816 | 2 August 1994 | Forwards Fr Notice of License Amend Requests Proposed Merger of Toledo Edison Co & Cleveland Electric Illumianting Co Antitrust Determination | |
ML20059H836 | 19 January 1994 | Notification of 940201 Meeting W/Util in Rockville,Md to Discuss Pending Davis-Besse Licensing Actions | |
ML20057F131 | 7 October 1993 | Notification of 931020 Meeting W/Util in Rockville,Md to Discuss Davis-Besse Implementation of Reg Guide 1.97 for Steam Generator Pressure Instruments | |
ML20127N612 | 25 January 1993 | Notification of 920205 Meeting W/Util in Rockville,Md to Discuss Emergency Action Levels Proposed Rev,Submitted 930112 | |
ML20127C041 | 8 January 1993 | Notification of 930112 Meeting W/B&W Owners Group in Clearwater Beach,Fl to Discuss Generic Program Plan for License Renewal Initiative | License Renewal |
ML20127F546 | 7 January 1993 | Notification of 930115 Meeting W/Util in Rockville,Md to Discuss Plant Containment Penetration Bellows Tests.Draft Agenda Encl | |
ML20126F554 | 8 December 1992 | Notification of 921215 Meeting W/Util in Rockville,Md to Discuss Proposed License Amend to Change from Automatic to Manual Closure of Containment Purge & Exhaust Valves in Mode 6 | |
ML20128C207 | 6 November 1992 | Notification of 921202 Meeting W/Util in Rockville,Md to Discuss Upcoming Refueling Outage Plans & Recent Plant Performance | |
ML20127C413 | 24 July 1992 | Responds to 910322 Memo Requesting Assistance on Whether 10CFR50.59 Review Should Have Been Performed for Broken Pipe in Station Drainage & Discharge Sys Releasing low-level Radioactivity Onsite | |
ML20059D271 | 6 August 1990 | Discusses Review of State of Oh & Local Radiological Emergency Response Plans.Determined That No Issues Identified During 890809-09 Exercise to Prevent Finding of Reasonable Assurance for Site | Earthquake Chernobyl |
ML20148T189 | 10 April 1990 | Responds to Request for Info Re Congressional Inquiries on Tracking & Closeout of Issues Raised Re Incident Investigation Team (IIT) Investigations of Plants.Actions Assigned by EDO in Response to Plant IITs Addressed | |
ML20055C352 | 26 February 1990 | Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility | |
ML20248E939 | 29 September 1989 | Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed | |
ML20248C831 | 20 September 1989 | Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action | |
ML20247H926 | 9 September 1989 | Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 | Systematic Assessment of Licensee Performance |
ML20246N809 | 30 August 1989 | Notification of 890907 Meeting W/Util in Rockville,Md to Discuss Exemption from App R to 10CFR50 for Specific Configuration of Pressurizer Instrumentation | |
ML20245E850 | 7 August 1989 | Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate | |
ML20245H645 | 4 August 1989 | Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR | |
ML20248D143 | 27 July 1989 | Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants | |
ML20247B754 | 19 July 1989 | Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete | |
ML20247E672 | 17 July 1989 | Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List | |
ML20246K599 | 12 July 1989 | Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl | |
ML20246L680 | 10 July 1989 | Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization | |
ML20247A956 | 6 July 1989 | Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS | |
ML20246D884 | 19 June 1989 | Staff Requirements Memo Re 890601 Briefing on Operating Reactors & Fuel Facilities in Rockville,Md.Commission Expressed Disappointment in Long Term Operating Performance of Turkey Point Nuclear Power Plant | |
ML20244A461 | 6 June 1989 | Notification of 890615 Meeting W/Util & Westinghouse Owners Group in Rockville,Md to Discuss Reactor Vessel Support Embrittlement | |
ML20246H377 | 12 May 1989 | ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 | |
ML20246P960 | 10 May 1989 | Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl | |
NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 | 2 May 1989 | Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 | High Radiation Area Tornado Missile Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment Design basis earthquake Earthquake Control of Heavy Loads Chernobyl Turbine Missile Fuel cladding Backfit Fatality |
ML20245E978 | 17 April 1989 | Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) | |
ML20245B642 | 15 April 1989 | Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart | |
ML20245B619 | 15 April 1989 | Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both | |
ML20245B653 | 15 April 1989 | Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys | |
ML20245B750 | 15 April 1989 | Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart | |
ML20244E268 | 12 April 1989 | Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl | Reverse polarity |