ML20134G174

From kanterella
Jump to navigation Jump to search
Requests Assistance in Identifying Any Insp Repts Re Const Activities Affecting Steam Generator Feedwater Pumps & Piping Sys & Hanger Insp Problems,In Connection W/Review of Allegations.Info Due by 841107
ML20134G174
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/06/1984
From: Lankford J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Bemis P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20132C567 List:
References
FOIA-85-173 NUDOCS 8508230127
Download: ML20134G174 (2)


Text

UNITE ~J STATES

. go naso

'o JCLEA'l CEIULATO2Y COMMISSION g

[

CEGION il o

2 101 MARlETTA STREET. N.W.

I ATLANTA, GEORGIA 30303

  • % *** /

NOV 0 8 IIB (

MEMORANDUM FOR:

P. Bemis, Acting Director Division of Reactor Safety FROM:

J. Lankford, Investigation / Allegation Coordinator

SUBJECT:

REQUEST FOR ASSISTANCE CASE NO:

RII-84-A-0143 Reference is made to my memorandum to J. Blake, which provided the results of your review of the alleger's affidavit in this case. The two technical issues identified for followup were identified as:

1) Construction activities affecting steam generator feedwater pumps and piping systems related thereto
2) Hanger inspection problems We have received a request from Mr. Charles Barth, Senior Litigation Attorney, ELD, to determine if there are previous inspection reports dealing with these two con-cerns. Mr. Barth has requested Region II assistance in identifying any such reports.

He has also requested this information be provided to him as soon as possible, but no later than the morning of November 7,1984, as he has a deadline from the ASLB to prepare a response by November 13, 1984.

Your assistance in this matter is appreciated.

AJf

,f.

Jeffrey'B. Lenkford cc:

B. Jones, Regional Counsel C. Barth, ELD 8508230127 850814 FOIA PDR PDR GUILDOS-173 o.,n

UNITE] ST ATES a meeg%

m NUCLEAR REEULATORY COAWISSION

  • /

[

'A C ETION 11 d

101 CARIETTA STZ EET.C. D.

ATLANTA. GEOMGIA 30303

%,*****/

NOVO 8 M(

MEMORANDUM FOR:

P. Bemis, Acting Director Division of Reactor Safety FROM:

J. Lankford, Investigation / Allegation Coordinator

SUBJECT:

REQUEST FOR ASSISTANCE CASE NO:

RII-84-A-0143 Reference is made to my memorandum to J. Blake, which provided the results of your review of the alleger's affidavit in this case. The two technical issues identified for followup were identified as:

1) Construction activities affecting steam generator feedwater pumps and piping systems related thereto
2) Hanger inspection problems We have received a request from Mr. Charles Barth, Senior Litigation Attorney, ELD, to detemine if there are previous inspection reports dealing with these two con-cerns.

Mr. Barth has requested Region II assistance in identifying any such reports.

He has also requested this infomation be provided to him as soon as possible, but no later than the morning of November 7, 1984, as he has a deadline from the ASLB to prepare a response by November 13, 1984.

Your assistance in this matter is appreciated.

)

. '/ -.

Jeffrey B. LAnkford cc:

B. Jones, Regional Counsel C. Barth, ELD C. A LL E O M (l.

6 fa47 5 H si / c [F

  • 1,s s a t2 m s. O wim 1we c.v Titeat 14A m 4 E L.)

,l :) i J > P e c_r i o rJ ;

e ni c rl s v e. c. i ( i c./i e t is 40 0 a.6sse0 1Ms

&c. Lowr FA fu s P f r P e d G, ft% 6 L L n.

T As s a safaR M n W

rd e T,+ e.

M A L i /+ s 6 R o.) E m s ekssocs4560 Lo i r J IMMCA45 w e 's 3

Tg6 $ a 6,\\ 0 C,T-o F-A t/ t n L A "-16.)

td d_i 7 T 6 d 67

d. YD A R IJ d" Of' N M i

d6,,9a n do. 60 6143 / S'a-La G

i.

6M

/

h(,7