MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0009, Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant1997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0474, Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant1997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0435, Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0375, Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant1997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Ja FitzPatrick Nuclear Plant JAFP-97-0341, Monthly Operating Rept for Aug 1997 for Jfnpp1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Jfnpp JAFP-97-0297, Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0242, Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant1997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0203, Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp1997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Ja FitzPatrick Npp JAFP-97-0178, Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant1997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0126, Monthly Operating Rept for Mar 1997 for JAFNPP1997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for JAFNPP JAFP-97-0093, Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant1997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for James A. FitzPatrick Nuclear Power Plant JAFP-97-0056, Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant1997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant JAFP-97-0012, Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant1996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0476, Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant1996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for James A. FitzPatrick Nuclear Power Plant JAFP-96-0448, Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0401, Monthly Operating Rept for Sept 1996 for Jfnpp1996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Jfnpp JAFP-96-0352, Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0300, Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant1996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0275, Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0240, Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant1996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0196, Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant1996-04-30030 April 1996 Monthly Operating Status Rept for Apr 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0156, Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant1996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0113, Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant1996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Ja FitzPatrick Nuclear Power Plant JAFP-96-0066, Monthly Operating Rept for Jan 1996 for JAFNPP1996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for JAFNPP JAFP-96-0023, Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0535, Monthly Operating Rept for Nov 1995 for Jafnpp1995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Jafnpp JAFP-95-0486, Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant1995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Ja FitzPatrick Nuclear Plant JAFP-95-0444, Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant1995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant JAFP-95-0413, Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Ja Fitzpatrick Nuclear Power Plant JAFP-95-0372, Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant1995-07-31031 July 1995 Monthly Operating Rept for July 1995 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARJAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Jafnpp.With JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with ML20216D9541999-07-28028 July 1999 Safety Evaluation Authorizing Proposed Alternatives for Second 10-year Interval Pursuant to 10CFR50.55a(a)(3)(ii) ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0175, Annual Summary of Changes,Tests & Experiments for 1997/1998. with1999-06-0202 June 1999 Annual Summary of Changes,Tests & Experiments for 1997/1998. with JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Jafnpp.With JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With ML20207E9311999-02-26026 February 1999 Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced ML20202J0891999-02-0303 February 1999 Safety Evaluation Accepting Rev 2 of Third Interval Inservice Testing Program for Pumps & Valves for James a FitzPatrick Nuclear Power Plant ML20199M0891999-01-22022 January 1999 Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20198F9991998-12-0404 December 1998 Assessment of Licensing Basis for Use of Containment Overpressure Credit for Net Positive Suction Head Analyses Power Authority of State of New York,James a Fitzpatrick Nuclear Power Plant ML20196J3501998-12-0404 December 1998 SER Accepting License Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves JAFP-98-0396, Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Ja FitzPatrick Npp. with ML20196F9251998-11-25025 November 1998 Safety Evaluation Re Thrid 10-year Interval Inservice Insp Program Relief Requests for Plant ML20195J7521998-11-18018 November 1998 Rev 7 to Jaf Colr ML20195K4211998-11-17017 November 1998 Safety Evaluation Authorizing Proposed Alternative in Relief Request VRR-05 Per 10CFR50.55a(a)(3)(i) & PRR-01,PRR-02R1, PRR-03,PRR-04,VRR-02,VRR-03 & VRR-04 Per 10CFR50.55a(a)(3)(ii) ML20195E1051998-11-13013 November 1998 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves, Issued 950817 ML20197G6221998-11-0606 November 1998 Non-proprietary Rev 7 to HI-971661, Licensing Rept for Reracking of Ja FitzPatrick Sfp ML20155H5321998-11-0303 November 1998 Safety Evaluation Authorizing Alternative to ASME Code Requirements for CRD Bolting ML20155H5801998-11-0303 November 1998 Safety Evaluation Authorizing Postponement of Beginning of Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) Re ASME Code,Section XI JAFP-98-0360, Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Ja FitzPatrick Nuclear Power Plant.With ML20155C2821998-10-30030 October 1998 Non-proprietary Rev 0 to GENE-187-30-1598 Np, CRD Bolting Flaw Evaluation for Ja FitzPatrick Nuclear Power Plant ML20154L6591998-10-14014 October 1998 Safety Evaluation Accepting Licensee Proposed Alternative to Snubber Visual Inservice Exam Intervals & Sampling Rates Requirements Contained in ASME Code,Section Xi,Subsection Iwf,Article IWF-5000 JAFP-98-0322, Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Ja Fitzpatrick Nuclear Power Plant.With ML20153D2591998-09-21021 September 1998 SER Accepting Proposed Alternative Testing of Containment Following ECCS Suction Strainer Replacement ML20153B5611998-09-0101 September 1998 Rev 1 to JAF-SE-98-013, RHR & Core Spray Suppression Pool Suction Strainer Replacement ML20151X6891998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Ja FitzPatrick Nuclear Power Plant ML20237E8361998-08-25025 August 1998 Rev 6 to Colr ML20237E9471998-08-0808 August 1998 Rev 6 to Colr JAFP-98-0264, Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Ja FitzPatrick Nuclear Plant ML20236X5881998-07-29029 July 1998 Safety Evaluation Supporting Amend 245 to License DPR-59 ML20236V8181998-07-29029 July 1998 Safety Evaluation Accepting Request for Relief from Implementation of Requirements of 10CFR50.55a Related to Containment Repair & Replacement Activities for James a FitzPatrick Nuclear Power Plant ML20153B5781998-07-28028 July 1998 Rev 0 to JAF-SE-98-025, HPCI & RCIC Suppression Pool Suction Strainer Replacement ML20236X3831998-07-14014 July 1998 Rev 2 to JAF-RPT-MULTI-02671, Summary of Detailed Evaluation for NRC Generic Ltr 96-06 ML20154L9201998-07-10010 July 1998 SER Accepting Rev to Reactor Vessel Surveillance Capsule Withdrawal Schedule for James a Fitzpatrick Nuclear Power Plant JAFP-98-0222, Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0193, Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Ja FitzPatrick Nuclear Plant ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted JAFP-98-0168, Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ja FitzPatrick Nuclear Power Plant JAFP-98-0128, Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant1998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Ja FitzPatrick Nuclear Power Plant ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively JAFP-98-0091, Monthly Operating Rept for Feb 1998 for JAFNPP1998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for JAFNPP ML20202G9081998-02-0606 February 1998 Safety Evaluation Re Amend to License DPR-59 to Revise TS Tables 3.2-2 & 4.2-2 JAFP-98-0058, Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Ja FitzPatrick Nuclear Power Plant 1999-09-30
[Table view] |
Text
OPERATING DATA REPORT DOCKET NO. 50-333 DATE Aug 1985 COMPLETED i;Y J. Cook TELEPHONE (315)342-3840 __
OPERATING STATUS
- 1. Unit Name: James A. FitzPatrick : Notes :
- 2. Reporting Period: 850701 - 850731 : :
- 3. Licensed Thermal Power (MWt): 2436 : -
- 4. Nameplate Rating (Cross MWe): 883 : :
- 5. Design Electrical Rating (Net MWe): 821 : :
- 6. Maximum Dependable Capacity (Gross MWe): 831 : :
- 7. Maximum Dependable Capacity (Net MWe): lfl0
- 8. If Changes occur in Capacity Ratings (Items 3 Through 7) Since I.ast Report,Give Reasons:
NONE
- 9. Power Level To Which Restricted, If Any (Net MWe): NONE
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative
- 11. Hours in Reporting Period 744 5087 87768
- 12. Number Of Hours Reactor Was Critical 703.5 z439.9 bzu)3.9
- 13. Reactor Reserve Shutdown Hours 0 0 U 14 Hours Generator On-Line 664.3 zzu9./ OUza/
- 15. Unit Reserve Shutdown Hours 0 U U
- 16. Gross Thermal Energy Generated (MWH) 1585056 3UdVJzu izsuloz/4
- 17. Gross Electrical Energy Generated (MWH) 530300 1/09960 4369Uzbu
- 18. Net Electrical Energy Generated (MWH) 512795 1653055 42051060
- 19. Unit Service Factor 91.9% 45.0% 68.6%
- 20. Unit Availability Factor 91.9% 45.0% 68.6%
- 21. Unit Capacity Factor (Psing MDC Net) 85.1% 40.1% 62.1%
- 22. Unit Capacity Factor (Using DER Net) 83.9% 39.6% 58.4%
- 23. Unit Forced Outage Rate 8% 10% 13.4%
- 24. Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of Each):
WONE
- 25. If Shut Down At End Of Report Period, Estinated Date of Startup:
- 26. linits In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAI. ELECTRICITY COMMERCIAL OPERATION 8508150664 850731 DR ADOCK 050 3 t{ g[
l\
L
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT FITZPATRICK DATE AUGUST 1985 COMPLETED BY J. COOK TELEPHONE (315) 342-3840 MONTH JULY 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 798 17 796 2 702 18 796 3 701 19 483 4 776 20 17 5 793 21 518 6 793 22 625 7 792 23 757 8 794 24 789 9 796 25 788 10 796 26 700 11 795 27 0 12 794 28 414 13 793 29 652 14 794 30 746 15 793 31 746 16 793
SUMMARY
- The FitzPatrick plant operated at near full thermal power j
for this reporting period with one inadvertent shutdown while transferring electrical loads and a unit trip during
'x
~
turbine control valve testing.
/
UNIT SilUTDOWNS AND F0WER REDUCTIONS DOCKET E0. 50-333 f' UNIT NAME FITZPATRICK DATE pyggg7 7995 REPORT MONTH JULY 1985 COMPLETED BY J. COOK TELEPHONE (315) 342-3840 N P z Noo 8G z OUd LICENSEE di $% CAUSE & CORRECTIVE NO. DATE $ "$ @ $$# EVENT $$ $$ ACTION TO
$ $ d 5! $ s REPORT # $" $" PREVENT RECURRENCE ov e ymg o 6 850624 F 34.6 A 3 85.018 AD REACTOR SCRAM ON HIGH FLUX DUE TO FAULTY INPUT DIODE IN RECIRC SCOOP TUBE POSITIONER CIRCUITRY. REPLACED THE DEMODULATOR BOARD AND RETURNED TO SERVICE.
7 850719 F 29.7 G 3 REACTOR SCRAM ON LOW VACUUM DUE TO OPERATOR ERROR WHILE TRANSFERRING ELECTRICAL LOADS.
8 850726 F 30.0 G 3 REACTOR SCRAM DURING TURBINE CONTROL VALVE TESTING DUE TO IMPROPER OPERATOR ACTION.
l 1 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Peparation of Data E-Maintenance of Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File NUREG D-Regulatory Restriction 4-Other(Explain) 0161 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other(Explain)
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE JULY 1985 The FitzPatrick plant operated at near full thermal power for the first eighteen days of the reporting period. On July 19 the unit tripped on low condenser vacuum which was caused by personnel error during electrical load transfers. The plant returned to service on July 20. On July 26 the unit again tripped due to improper operator action during Turbine control valve testing. The plant returned to service on July 28.
At the end of the reporting period the FitzPatrick plant is operating at approximately 783 mw, .
'N
NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MATNTENANCE
SUMMARY
JULY 1985 ACTION TAKEN REPAIR WORK REOUEST NO. HOW CAUSE OF RESULTS OF 10 PRECLUDE TIME DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RErURRENCE HOURS 850708 07 033594 OPS POSSIBLE BAD Y NOT = 0 WHEN WILL NOT BE FIXED- 16 NM-131-2B SOLDER CONNECTION DET. OUT OF CORE OBSOLETE 850717 07 034791 OPS LAGGING SWITCH ON TIP STOPS DURING LOWERED CORE TOP, 40 TIP-C VEED. RT. CNTR. WITHDRAWAL BOTTOM BY ONE 850724 07 034781 OPS APRM COUNT ADJ. TO INOP FROM 3 APRM-F CIRCUIT NEEDS 12 to 11 LPRM ADJST.
850709 11 034763 OPS TRANSMIT. SENS. SLC TANK XMIT/IND BLEW OUT LINE WITH AIR, 8 LT-45 LINE/ZERO ADJUST READS HIGH ADJ. ZERO 850711 12 034810 OPS DEFECT SWITCH, GIVES SPURIOUS THIGHTENED 18 TS-139C LOOSE THERMOCOUPLE ISOLAT. OF RWCU THERMOCOUPLE, FIXED SWITCH 850701 13 034819 OPS COVENOR VALVE TRIPPED TWICE ON ADJ. VALVE STROKE 32 P-1 ADJUSTED WRONG OVERSPEED AND LINKAGE 850708 16 034823 OPS UNKNOWN BULK VALUE IS REPROGRAMMED THE 8 TM-131 INCORRECT COMPUTER 850719 16-1 028577 OPS DRIFT DOESN'T INDICATE REPLACED BATTERY, 40 PR-200 CORRECT PRESSURE PERFORMED CALIBRATION
7 NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
SUMMARY
JULY 1985 ACTION TAKEN REPAIR WORK REOUEST NO. HOW' CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT NO. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 850722 17 040215 OPS DETECTOR MON. READS HI ON CLEANED DETECTOR 16 RIS-458A CONTAMINATION PANEL HV-12 850724 17 034717 OPS DEFECTIVE DOWNSCALE ALARM ORDERED NEW GROMMETS 24 RM-251B MOUNTING COMES IN AND OUT GROMMETS 850710 20 034870 OPS LOOSE CARRIAGE WILL NOT GO TO ADJUSTED CARRIAGE 4 FR-52B ASSEMBLY ZERO ASSEMBLY 850718 20 034851 OPS POSSIBLE LINEUP MOVES SLOWLY WITH ISOLATION TRANS., 6 RQX-530 PROBLEM, AIR LEAK 20A0V95 SHUT VER. FT STOP LEAKAGE 850717 27 040800 OPS BURNED OUT PART., SOURCE REPLACED LAMPS, ADJUSTE ) 4 RM-101A LAMPS DRIVE WOULDN'T CAMS DRIVE CIRC.
850702 27 039521 OPS METER CAN'T PANEL WOULDN'T HAD METER CALIBRATED 3 PCA-101 PROVIDE ENOUGH CALIBRATE IN ADJUSTED ZERO ADJUST. ISP 30-1 850701 76 034718 OPS DOOR MAGNET OUT INDICATES OPEN REPOSITIONED THE MAGNET 18 272-15 0F POSITION AT FPP WHEN NOT 850708 76 034680 OPS LINE NOISE CIR. #1 FAILURE CHECKED LINES WITH 4 MPX-4 WON'T CLEAR 0-SCOPE
NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK HUCLEAR POWER PLANT MAINTENANCE SU1 DIARY JULY 1985 ACTION TAKEN REPAIR WORK REOUEST NO. HOW CAUSE OF RESULTS OF TO PRECLUDE TIME DATE SYSTEM COMPONENT No. DETECTED MALFUNCTION MALFUNCTION RECURRENCE HOURS 850718 76 034865 OPS SWITCH OUT OF COMPR. WON'T TURN CALIBRATED SWITCH 6 0-11 CALIBRATION OFF AT SET POINT 850718 76 040154 OPC POWER SUPPLY LINE 1,2 FAILED REPLACED POWER SUPPLY 4 MPX-3 AND TRANSMITTER GENERATOR SYSTEM AND TRANSMITTER FAILED
NEW YORK F0WER AUI110RITY JAMES A. FITZPATRICK hTCLFAR POWER PIAhT
- SAFEIY REIATED ELECIRICAL & MFEFANICAL PAIhTENANCE SlWARY ,
JULY 1985 REPAIR-kORK REQUEST # TIME DATE SYST&1 CTPONENT 110R DETECTED CAUSE OF MAIJUNCTION ACTION TAKEN 'IO PRFfLUDE RECURRENCE HOURS 6/25 03 22725 OPS Seat Icakage Repaired valve seat 3 HCU 10-23 6/27 01-125 34700 OPS kbrn Fan Belts Replaced tan belts 6 FN 1A 7/2 03 37215 OPS Broken Hand Kheel Replaced hand wheel 2 CRD 75 7/3 71 33764 GPS Indicator Light Eeplaced bulb 2 IBC-2 Burned Out 7/3 76 34686 OPS Alarm Light Bumed Replaced bulb 2 SD-349 Out 7/3 76 34735 OPS Alarm Light Bumed Replaced bulb 2 SD-336 Out 7/4 93 34841 OPS Cmpressor Unloader Replaced unloader 5 AC-2B 7/11 07 36827 OPS Dead Spot in Switch Cleaned switch 2 SW-7A-S2 7/17 70 34818 OPS Seal Irak Replaced mechanical seal 40 P-9A 7/18 27 34675 OPS Limit Switch Out of Adjusted limit switch 3 ,
VB-2 Adjustment 7/19 46 285/1 OPS Breaker Failed to Shindi X relay housing replaced 21 P-2A Close trip paddle 7/24 03 40159 OPS Solenoid Failure Replaced solenoids 8 CRD 34-15
A PO. Etw 41 Lv com.ng. New %k 130'33 315 342 3340
- 5 NewYorkPower 1sf Authority August 7, 1985 JAFP 85-0651 Director, Of fice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION: DOCUMENT CONTROL DESK
REFERENCE:
DOCKET NO. 50-333
Dear Sir:
Enclosed please find the J. A. FitzPatrick Operating Status Report for the month of July, 1985. Refueling information remains the same as previously submitted.
If there are any questions concerning this report, please contact John Cook at (315) 342-3840, Ext. 439.
IAROLD A. GLOVIER HAG :mac Enclosures cc: Distribution 6
\\