MONTHYEARML20149G9741977-11-10010 November 1977 Summary of 771025 Meeting W/Util in Silver Spring,Md Re Storage of Oconee Nuclear Station Spent Fuel at McGuire Nuclear Station.List of Attendees Encl Project stage: Meeting ML20149H7251977-12-29029 December 1977 Forwards Request for Addl Info Re Rev 24 to FSAR Re Storage of Oconee Fuel at McGuire Facility Project stage: RAI ML20149H7111978-01-0404 January 1978 Forwards Request for Addl Info Re Rev 24 to FSAR Concerning Storage of Oconee Spent Fuel at McGuire Facility Project stage: RAI ML20149H5791978-03-0909 March 1978 Application for Amend to License SNM-1773,authorizing Storage of Oconee Spent Fuel at McGuire Facility Prior to Issuance of McGuire OL Project stage: Request ML20147B9001978-04-19019 April 1978 Confirms 780418 Conversation Re Site Visit on 780425-27 by NRC & Contractor Personnel.Areas of Interest to Be Reviewed for Both McGuire & Oconee Sites Are Listed Project stage: Other ML20147B7951978-05-0808 May 1978 Discusses 780425-27 Site Visit Made to Familiarize Proj Manager & Contractors W/Spent Fuel Facil Project stage: Other ML20149H1011978-05-19019 May 1978 Forwards Request for Addl Info Re Application for Amend to License SNM-1773,including Licensing of Spent Fuel Pool as Isfsi.Meeting W/Util Requested to Resolve Matter.Response to Encl Questions Needed by 780605 Project stage: RAI ML20147C7361978-05-23023 May 1978 Notification of 780602 Meeting Re Proposed Transport of 120 Day Old Vice 1 Year Old Spent Fuel from Oconee Nuc Station to McGuire Nuc Station for Interim Storage Project stage: Meeting ML20149H8721978-07-21021 July 1978 Forwards Request for Addl Info Re Application for Amend to License SNM-1773 Re Storage of Oconee Spent Fuel at McGuire Facility.Response Requested within 30 Days of Receipt of Ltr Project stage: RAI ML20149H3071978-08-0202 August 1978 Forwards Schedule Used by NRC to Insure Timely Review Process.Dates Shown Reflect Best Practical Estimate Which Can Be Made at This Time.Date of Completion & Final Decision on Licensing Action Will Depend on Result of Hearings Held Project stage: Other ML20150A6631978-09-26026 September 1978 Forwards Review of Draft EIS for Transshipment & Storage of Irradiated Oconee Fuel at Subj Facil.Requests Review for Consistency W/Nrr Review of McGuire Appl.Meeting W/Pacific Nw Lab 781002 ML19259A9131978-12-31031 December 1978 Eia Re Spent Fuel Storage of Oconee Spent Fuel at McGuire Station-Unit 1 Spent Fuel Pool. Concludes There Will Be No Significant Environ Impact & That No EIS Need Be Prepared Project stage: Other ML20032B7461981-10-27027 October 1981 Amend 8 to License NPF-9,revising Tech Specs to Authorize Receipt,Possession & Storage of 300 Irradiated Fuel Assemblies Project stage: Other ML20080P8411984-02-17017 February 1984 Application for Amend to Licenses NPF-9 & NPF-17,allowing Spent Fuel Pool Storage Capacity Expansion from 500 to 1,463 Spaces for Each Spent Fuel Pool.Supporting Documentation Encl Project stage: Request ML20093E1041984-09-24024 September 1984 Amend 35 & 16 to Licenses NPF-9 & NPF-17,respectively, Changing Tech Specs to Permit Expansion of Spent Fuel Pool Storage Capacity Project stage: Other ML20093E1171984-09-24024 September 1984 Safety Evaluation Supporting Amends 35 & 16 to Licenses NPF-9 & NPF-17,respectively Project stage: Approval ML20100G4641985-04-0303 April 1985 Application for Amends to Licenses NPF-9 & NPF-17, Incorporating Into Unit 2 License Authority to Receive, Possess & Store Irradiated Oconee Fuel Assemblies Under Same Conditions as Presently Authorized by Unit 1.Fee Paid Project stage: Request ML20100G4881985-04-0303 April 1985 Proposed Tech Specs Re Possession & Storage of Irradiated Oconee Fuel Assemblies Containing SNM Project stage: Other ML20127H6421985-05-14014 May 1985 Application for Amend to Licenses NPF-9 & NPF-17, Incorporating Into Unit 2 License Authority to Receive, Possess & Store Irradiated Oconee Fuel Assemblies Under Conditions Authorized by Unit 1 License Project stage: Request ML20127J0351985-05-14014 May 1985 Proposed Tech Specs,Incorporating Into Unit 2 License Authority to Receive,Possess & Store Irradiated Oconee Fuel Assemblies Under Conditions Authorized by Unit 1 License Project stage: Other ML20128L4771985-05-16016 May 1985 Notice of Consideration of Issuance of Amend to Licenses NPF-9 & NPF-17 & Proposed NSHC Determination & Opportunity for Hearing Re Util 850403 Request to Store Oconee Spent Fuel at Unit 2 Project stage: Other ML20128L4561985-05-20020 May 1985 Forwards Notice of Consideration of Issuance of Amend to Licenses NPF-9 & NPF-17 & Proposed NSHC Determination & Opportunity for Hearing Re Util 850403 Request to Store Oconee Spent Fuel at Unit 2 Project stage: Other ML20126K5011985-06-12012 June 1985 Submits Addl Info Further Clarifying Util Position on Receiving,Possessing & Storing Irradiated Oconee Nuclear Station Fuel Assemblies Under Current License NPF-9 Conditions,Per 850403 & 850514 Proposed License Amends Project stage: Other ML20133C2181985-07-26026 July 1985 Safety Evaluation Supporting Amends 44 & 25 to Licenses NPF-9 & NPF-17,respectively Project stage: Approval ML20133A1891985-07-26026 July 1985 Forwards Unexecuted Amend 8 to Indemnity Agreement B-83 for Signature Project stage: Other ML20133C2101985-07-26026 July 1985 Amends 44 & 25 to Licenses NPF-9 & NPF-17,respectively, Incorporating License Authority to Receive,Possess & Store Irradiated Fuel Assemblies from Oconee Nuclear Station Project stage: Other ML17219A6301987-06-12012 June 1987 Proposed Tech Specs,Permitting Replacement of Spent Fuel Racks to Increase Capacity to 1,706 Spent Fuel Assemblies Project stage: Request ML13319A8041987-12-24024 December 1987 Forwards Transshipment of San Onofre Unit 1 Spent Fuel for Review & Approval,Per NRC Request at 870925 Meeting.Proposed Method for Transshipment of Spent Fuel to Units 2 & 3 Will Not Include Air Pallet Sys.Fee Paid Project stage: Meeting ML13319A8061987-12-31031 December 1987 Transshipment of San Onofre Unit 1 Spent Fuel Project stage: Other ML20196H1381988-02-0808 February 1988 Notice of Consideration of Issuance of Amends to Licenses NPF-10 & NPF-15 & Proposed NSHC Determination & Opportunity for Hearing on 871230 Request Re Possession of Byproduct & SNMs Produced by Unit 1 Project stage: Other ML20149L8001988-02-22022 February 1988 Proposed Tech Specs 3/4.7.1.1, Safety Valves, 3.0.4, 3/4.3.2, ESF Actuation Sys Instrumentation, & 3/4.4.4, Steam Generators & Surveillance Requirements 4.0.3 & 4.0.4 Project stage: Other ML17221A6341988-02-22022 February 1988 Environ Assessment & Finding of No Significant Hazard, Supporting Proposed Amend to License NPF-16,permitting Transfer of Unit 1 Spent Fuel Pool to Unit 2 Spent Fuel Pool Project stage: Other ML13303A8341988-02-26026 February 1988 Requests Addl Info Re Util 871231 Proposed Change to Licenses NPF-10 & NPF-15 to Allow Storage of Spent Fuel. Application for Amend to Licenses Must Be Received Before NRC Makes Final Determination on Issue Project stage: Other ML13303B8931988-03-0808 March 1988 Notification of Registration as User of Certificate of Compliance 9001 in Response to 880111 Request Project stage: Other ML13330B2941988-04-25025 April 1988 Forwards Transshipment of San Onofre Unit 1 Spent Fuel, .Rept Supercedes 871224 Rept Transmitted to NRC Project stage: Other ML13331B0391988-04-28028 April 1988 Application for Amend to License DPR-13,consisting of Proposed Change 181 to Amend Application 148,revising License Condition 3.C & Deleting Tech Spec 4.13, Turbine Deck Load Bearing Test & Visual Insp Project stage: Request ML13331B0371988-04-28028 April 1988 Forwards Amend Application 148,consisting of Proposed Change 181 to License DPR-13,revising License Condition 3.C & Deleting Tech Spec 4.13, Turbine Deck Load Bearing Test & Visual Insp Project stage: Request ML13331B0401988-04-28028 April 1988 Tech Spec 4.13 Requiring Performance of Turbine Deck Load Bearing Test Every 4 Yrs W/Use of Air Pallet Sys.Air Pallet Sys Will Not Be Used as Part of Proposed Method for Spent Fuel Shipment.Tech Spec Not Applicable Project stage: Other ML13330B2961988-04-30030 April 1988 Transshipment of San Onofre Unit 1 Spent Fuel Project stage: Other ML20196B7941988-06-22022 June 1988 Safety Evaluation Supporting Amends 63 & 52 to Licenses NPF-10 & NPF-15,respectively Project stage: Approval 1985-04-03
[Table View] |
Text
/
g UNITED STATES
[
p, NUCLEAR REGULATORY COMMISSION L
.j WASHINGTON, D. C. 20555
\\*...+/
DUKE POWER COMPANY DOCKET NO. 50-369 McGUIRE NUCLEAR STATION, UNIT I AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 44 License No. NPF-9 1.
The Nuclear Regulatory Comission (the Comission or the NRCl has #ound that:
A.
The application for amendment to the McGuire Nuclear Station, Unit 1 (the facility) Facility Operating License No. NPF-9 filed by the Duke Power Company (the licensee) dated April 3, 1985, and supplemented May 14 and June 12, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's regulations set forth in 10 CFR Chapter I; 8.
The facility will operate in conformity with the application as amended, the provisions of the Act, and the regulations of the Comission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment'can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, Facility Operating License No. NPF-9 is changed as follows:
A.
Change paragraph 2.K.b. to read:
b.
Irradiated fuel *, hipped to McGuire Nuclear Station, Units 1 and 2, from Oconee shall have been removed from the Oconee reactor no less than 270 days prior to shipment.
B.
Change paragraph 2.K.c. to read:
c.
No more than 300 Oconee irradiated fuel assemblies shall be received for storage at McGuire Nuclear Station.
8508060392 850726 PDR ADOCK 05000369 P
PDR
2 C.
Add paragraph 2.K.o. to read:
g.
Oconee fuel assemblies may not be transferred from one McGuire spent fuel pool to the other.
3.
This amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
. o ugh L. zm,m)mosch, r., Director 3
Division of Licensing Office of Nuclear Reactor Regulation -
Date of Issuance:
July 26, 1985 O
l 4
i
[
UNITE 38TATES i
[
NUCLEAR REGULATORY COMMISSION a
waswenaton.o c.noese
.... e DUKE POWER COMPANY DOCKET NO. 50-370 McGUIRE NUCLEAR STATION, UNIT 2 I'
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No, 25 License No NPF-17 1.
The Nuclear Regulatory Comission (the Comission or the NRC) has found that:
A.
The application for amendment to the McGuire Nuclear Station, Unit 2 (the facility) Facility Operating License No. NPF-17 filed by the Duke Power Company (the Itcensee) dated April 3,1985, and supplemented May 14 and June 12, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confonnity with the application as amended, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance:
(i)thattheactivitiesauthorized i
by this amendment can be conducted without endangering the health I
and safety of the public, and (ii) that such act'vities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter II D.
The issuance of this amendment will not be inimical to the comon defense and security or the health and safety of the publict and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requiraments have been satisfied.
2.
Accordingly, Facility Operating License No. NPF-17 is changed as follows:
A.
Add paragraph 2.J. to read:
1 J.
The licensee is authorized to receive from the Oconee Nuclear i
Station, Units 1, 2 and 3, possess, and store irradiated Oconee fuel assemblies containing special nuclear material, enriched i
to not more than 3.24% by weight U 235 subject to the following i
conditions:
i a.
Oconee fuel assemblies may not be placed in the McGuire l
Nuclear Station, Units 1 and 2, reactors.
i b.
Irradiated fuel shipped to McGuire Nuclear Station, l
Units 1 and 2, from Oconee shall have been removed from the Oconee reactor no less than 270 days prior to shipment.
[
k l
c.
No more than 300 Oconee irradiated fuel assemblies shall be received for storage at McGuire Nuclear
- Station, d.
Burnuo of Oconee fuel shipped shall be no greater than 36,000 W days per metric ton.
e.
Receipt of irradiated Oconee fuel shall be limited by the use of the NFS-4 (NAC-1) or NL!-1/2 spent fuel casks.
f.
The spent fuel pool crane travel shall be restricted by administrative controls to the paths required by Technical Specification 3/4.9.7 whenever a spent fuel cask is being handled.
i g.
Oconee fuel assemblies may not be transferred from one McGuire spent fuel pool to the other.
B.
Change the designation of paragraph 2.J. on page 8 to 2.K.
3.
This amendment is effective as of the date of issuance.
l FOR THE NUCLEAR REGULATORY COMISSION Y&ft Y
G I
Hugh L. d e
Jr., Director K[k Division of icensing Office of Nuclear Reactor Regulation Date of !ssuance: July 26, 1985 l
[