Letter Sequence Other |
---|
|
|
MONTHYEARML20100G4881985-04-0303 April 1985 Proposed Tech Specs Re Possession & Storage of Irradiated Oconee Fuel Assemblies Containing SNM Project stage: Other ML20100G4641985-04-0303 April 1985 Application for Amends to Licenses NPF-9 & NPF-17, Incorporating Into Unit 2 License Authority to Receive, Possess & Store Irradiated Oconee Fuel Assemblies Under Same Conditions as Presently Authorized by Unit 1.Fee Paid Project stage: Request ML20127J0351985-05-14014 May 1985 Proposed Tech Specs,Incorporating Into Unit 2 License Authority to Receive,Possess & Store Irradiated Oconee Fuel Assemblies Under Conditions Authorized by Unit 1 License Project stage: Other ML20127H6421985-05-14014 May 1985 Application for Amend to Licenses NPF-9 & NPF-17, Incorporating Into Unit 2 License Authority to Receive, Possess & Store Irradiated Oconee Fuel Assemblies Under Conditions Authorized by Unit 1 License Project stage: Request ML20128L4771985-05-16016 May 1985 Notice of Consideration of Issuance of Amend to Licenses NPF-9 & NPF-17 & Proposed NSHC Determination & Opportunity for Hearing Re Util 850403 Request to Store Oconee Spent Fuel at Unit 2 Project stage: Other ML20128L4561985-05-20020 May 1985 Forwards Notice of Consideration of Issuance of Amend to Licenses NPF-9 & NPF-17 & Proposed NSHC Determination & Opportunity for Hearing Re Util 850403 Request to Store Oconee Spent Fuel at Unit 2 Project stage: Other ML20126K5011985-06-12012 June 1985 Submits Addl Info Further Clarifying Util Position on Receiving,Possessing & Storing Irradiated Oconee Nuclear Station Fuel Assemblies Under Current License NPF-9 Conditions,Per 850403 & 850514 Proposed License Amends Project stage: Other ML20133A1891985-07-26026 July 1985 Forwards Unexecuted Amend 8 to Indemnity Agreement B-83 for Signature Project stage: Other ML20149L8001988-02-22022 February 1988 Proposed Tech Specs 3/4.7.1.1, Safety Valves, 3.0.4, 3/4.3.2, ESF Actuation Sys Instrumentation, & 3/4.4.4, Steam Generators & Surveillance Requirements 4.0.3 & 4.0.4 Project stage: Other 1985-05-20
[Table View] |
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217F3481999-10-15015 October 1999 Marked-up & Reprinted TS Pages,Changing TS Requirements for Insp of RCP Flywheels ML20216E6601999-09-13013 September 1999 Marked-up & Revised TS Pages,Making Permanent One Time Only Changes Incorporated Into TS 3.7.9 Allowing Up to 24 Hours to Restore Control Room Pressure Boundary to Operable Status When Two Cravs Trains Inoperable ML20211G6711999-08-27027 August 1999 Proposed Tech Specs 3.1.4 Re Rod Group Alignment Limits ML20210R0131999-08-10010 August 1999 Revised Tech Specs Bases Pages B 3.4.14-2 & B 3.4.14-6, RCS PIV Leakage ML20196H7551999-06-24024 June 1999 Proposed Tech Specs 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20195F2941999-06-10010 June 1999 Proposed Tech Specs,Facilitating one-time Addition of Condition G & Administrative Controls Note to TS 3.7.9, Cravs ML20206M9391999-05-0606 May 1999 Proposed Tech Specs,Revising List of Referenced Documents in TS 5.6.5b Re COLR Requirements ML20206B0761999-04-0606 April 1999 Proposed Tech Specs Expanding Allowable Values for Interlocks P-6 (Intermediate Range Neutron Flux) & P-10 (Power Range Neutron Flux) in TS 3.3.1,Table 3.3.1-1, Function 16 ML20205L2251999-04-0505 April 1999 Proposed Tech Specs,Providing Revised SFP Storage Configuration,Revised SFP Storage Criteria & Revised Fuel Enrichment & Burnup Requirements ML20205B6231999-03-23023 March 1999 Proposed Tech Specs Pages Mark Ups for Unit 1,changing Record for FOL NPF-9 Amend Submittal ML20204F6761999-03-18018 March 1999 Marked-up Tech Spec Pages Re License Bases Record Change to License Amend Submittals ML20207C6921999-02-22022 February 1999 Proposed Tech Specs Bases,Reflecting Removal of SI Signal on Low Steamline Pressure on Page B 3.3.2-16 & Adding Clarification for Increasing Hydrogen Recombiner Power During Testing on Page B 3.6.7-4 ML20198B9671998-12-0909 December 1998 Revised TS 3.7.11 LCO Bases to Specify That AB Filtered Ventilation Exhaust Sys Is Considered Operable When Associated Two Fans,Filters,Ductwork,Valves & Dampers Are Operable ML20155B2111998-10-22022 October 1998 Proposed Revs to Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009 & DPC-NE-2009P ML20151Y2461998-09-15015 September 1998 Proposed Improved Tss,Resolving Items Identified by Util During Review ML20151U3521998-09-0808 September 1998 Proposed Tech Specs & Bases Converting to Improved Tech Specs ML20237B6241998-08-14014 August 1998 Proposed Tech Specs 4.6.5.1.b.2 & 4.6.5.1b.3 Relating to Ice Condenser Ice Bed Changing Portion of Surveillances Pertaining to Lower Inlet Plenum Support Structures & Turning Vanes from 9-month Frequency to 18-month Frequency ML20237B5721998-08-12012 August 1998 Proposed Tech Specs 4.6.5.1b.3 Re Ice Condenser Sys Components W/Respect to Accumulation of Frost or Ice ML20237A0411998-08-0505 August 1998 Suppl 8 to Improved TS Noting Differences Between Two Units. Proposed Changes Require That Specs & Surveillances Apply to Each Unit Individually,Unless Otherwise Noted,Consistent W/Version of Current TS Prior to Amends 166 & 148 ML20236U1531998-07-22022 July 1998 Proposed Revised Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009P & DPC-NE-2009 ML20236G5301998-06-29029 June 1998 Rev to Bases of TS 3/4.6/3,correcting Editorial Errors ML20247E3891998-05-0808 May 1998 Proposed Tech Specs,Revising Power Range Neutron Flux High Trip Setpoints in Event of Inoperable MSSVs & Deleting References to 3-loop Operation in Current TS Section 3.7.1.1(b) & Table 3.7-2 ML20217E6531998-04-20020 April 1998 Proposed Improved Tech Specs Re Section 1.0,2.0,3.0 & 4.0 ML20217B7871998-03-20020 March 1998 Marked-up Proposed Improved TS 3.6 & 5.5.2 ML20217N9311998-03-0303 March 1998 Proposed Tech Specs 5.5 Re Meteorological Tower Location ML20216B9851998-03-0202 March 1998 Proposed Tech Specs Responding to 980116 RAI Re Improved TS Sections 3.1 & 3.2.Suppl Changes to Improved TS Encl ML20197G4391997-12-17017 December 1997 Proposed Tech Specs Referencing Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR ML20198H5361997-12-17017 December 1997 Tech Spec Pages for TS 3/4.7.8 for Use in Lieu of ASME Section XI Requirements ML20217H5541997-10-13013 October 1997 Proposed Tech Specs Supporting Replacement of Three Safety Related Narrow Range Refueling Water Storage Tank Level Instruments W/Three Safety Related Wide Range Level Instruments ML20212A2511997-10-0606 October 1997 Proposed Tech Specs Deleting All References to Steam Line Low Pressure Safety Injection Function ML20133M5541997-01-13013 January 1997 Proposed Tech Specs Implementing performance-based Containment Leak Rate Testing Requirements of 10CFR50, App J,Option B ML20133D3991997-01-0606 January 1997 Proposed Tech Specs 3/4.6 Re Containment Systems ML20132F0001996-12-17017 December 1996 Proposed Tech Specs,Supplementing Amend Request to Change Surveillance 4.8.2.1.2.e Which Will Achieve Alignment W/ Improved STS SR 3.8.4.8 ML20135B0381996-11-26026 November 1996 Proposed Tech Specs 3.8.2 Re DC Sources ML20134M1541996-11-0101 November 1996 Proposed Tech Specs 3.8.2 Allowing Use of Low Specific Gravity Cells in Vital 125 Volt Dc Sys When Desired ML20129F7591996-10-22022 October 1996 Proposed Tech Specs 3.6.1.5 Re Containment Systems & Air Temp ML20117K1011996-08-29029 August 1996 Proposed Tech Specs,Replacing 960516 Response to Concerns Re Proposed Changes for Diesel Starting Air Sys Surveillance Testing ML20113C7201996-06-21021 June 1996 Proposed Tech Specs 3.9.6,revising Term Lifting Loads to Lifting Force Used in Manipulator Crane TS 3.9.6b.2 & Redefining Auxiliary Hoist Min Capacities ML20112A7571996-05-16016 May 1996 Proposed Tech Specs 3/4.8 Re Surveillance Requirements ML20101H6101996-03-15015 March 1996 Proposed Tech Specs Re Replacement of SGs ML20101C8281996-03-0808 March 1996 Proposed Tech Specs Reflecting Separate Vols for Unit 1 & Unit 2 ML20100R4601996-03-0404 March 1996 Proposed Tech Specs,Deleting Flow Monitoring Sys from TS 3.4.6.1 & Associated SRs ML20097G3911996-02-13013 February 1996 Proposed Tech Specs Re Listing of Core Operating Limit Methodologies for Editorial Correction ML20095E9571995-12-14014 December 1995 Proposed Tech Specs Action Statements & SRs for Dgs, Incorporating Guidance & Recommendations in NUREG-1366,GL 93-05,GL 94-01 & NUREG-1431 ML20095E8081995-12-12012 December 1995 Proposed Tech Specs,Making McGuire Afd Limit Equations Identical to Previously Approved by NRC for Catawba Nuclear Station ML20095B6221995-12-0505 December 1995 Proposed TS SR 4.8.2.1.2.e Re 60-month Battery Testing ML20093L2861995-10-17017 October 1995 Proposed Tech Specs Listings of Core Operating Limit Methodologies ML20098A4631995-09-18018 September 1995 Proposed Tech Specs,Providing Revised Record Pages for LTOP Protection in TS Amend ML20092K4481995-09-18018 September 1995 Proposed Tech Spec Table 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints ML20092B1571995-09-0101 September 1995 Proposed Tech Specs,Revising TS 3/4.6.5 to Reduce Required Ice Weight in Containment Ice Condenser of Each Unit from 2,099,790 Lbs to 1,516,800 Lbs 1999-09-13
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217F3481999-10-15015 October 1999 Marked-up & Reprinted TS Pages,Changing TS Requirements for Insp of RCP Flywheels ML20217J6401999-10-0606 October 1999 Revised Pages to McGuire Nuclear Station Selected Licensee Commitments Manual ML20216E6601999-09-13013 September 1999 Marked-up & Revised TS Pages,Making Permanent One Time Only Changes Incorporated Into TS 3.7.9 Allowing Up to 24 Hours to Restore Control Room Pressure Boundary to Operable Status When Two Cravs Trains Inoperable ML20211G6711999-08-27027 August 1999 Proposed Tech Specs 3.1.4 Re Rod Group Alignment Limits ML20211A9881999-08-18018 August 1999 Rev 5 to DPC Nuclear Security Training & Qualification Plan ML20210R0131999-08-10010 August 1999 Revised Tech Specs Bases Pages B 3.4.14-2 & B 3.4.14-6, RCS PIV Leakage ML20196H7551999-06-24024 June 1999 Proposed Tech Specs 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20195F2941999-06-10010 June 1999 Proposed Tech Specs,Facilitating one-time Addition of Condition G & Administrative Controls Note to TS 3.7.9, Cravs ML20212A2701999-05-28028 May 1999 Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valves Inservice Testing Program ML20206M9391999-05-0606 May 1999 Proposed Tech Specs,Revising List of Referenced Documents in TS 5.6.5b Re COLR Requirements ML20206Q9311999-05-0404 May 1999 Rev 29 to List of Effective Pages for Chapter 16 & Page 16.11-66 to McGuire Selected Licensee Commitment Manual. with ML20206S9401999-04-30030 April 1999 Rev 29 to McGuire Nuclear Station Selected Licensee Commitments. with List of Effective Pages ML20206K3621999-04-30030 April 1999 Revised McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual ML20206B0761999-04-0606 April 1999 Proposed Tech Specs Expanding Allowable Values for Interlocks P-6 (Intermediate Range Neutron Flux) & P-10 (Power Range Neutron Flux) in TS 3.3.1,Table 3.3.1-1, Function 16 ML20205L2251999-04-0505 April 1999 Proposed Tech Specs,Providing Revised SFP Storage Configuration,Revised SFP Storage Criteria & Revised Fuel Enrichment & Burnup Requirements ML20205L2431999-04-0505 April 1999 SFP Soluble Boron Credit Dilution Analysis (Summary of Applicable Portions) ML20205L2531999-04-0505 April 1999 Boraflex Degradation Analysis ML20205B6231999-03-23023 March 1999 Proposed Tech Specs Pages Mark Ups for Unit 1,changing Record for FOL NPF-9 Amend Submittal ML20204F6761999-03-18018 March 1999 Marked-up Tech Spec Pages Re License Bases Record Change to License Amend Submittals ML20207C6921999-02-22022 February 1999 Proposed Tech Specs Bases,Reflecting Removal of SI Signal on Low Steamline Pressure on Page B 3.3.2-16 & Adding Clarification for Increasing Hydrogen Recombiner Power During Testing on Page B 3.6.7-4 ML20198B9671998-12-0909 December 1998 Revised TS 3.7.11 LCO Bases to Specify That AB Filtered Ventilation Exhaust Sys Is Considered Operable When Associated Two Fans,Filters,Ductwork,Valves & Dampers Are Operable ML20198A4691998-12-0909 December 1998 Rev 14 to DPC McGuire Nuclear Station Process Control Program ML20196G6891998-11-23023 November 1998 Rev 26 to Selected Licensee Commitments (SLC) Manual ML20196C9211998-11-14014 November 1998 Rev 26 to Selected Licensee Commitments Manual. with Update Instructions ML20155B2111998-10-22022 October 1998 Proposed Revs to Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009 & DPC-NE-2009P ML20154L7191998-10-0505 October 1998 Rev 8 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20151Y2461998-09-15015 September 1998 Proposed Improved Tss,Resolving Items Identified by Util During Review ML20151U3521998-09-0808 September 1998 Proposed Tech Specs & Bases Converting to Improved Tech Specs ML20151Z7751998-09-0808 September 1998 Rev 25 to McGuire Selected Licensee Commitment Manual, Consisting of Revised Pages 16.7-9 & 16.7-10 ML20237B6241998-08-14014 August 1998 Proposed Tech Specs 4.6.5.1.b.2 & 4.6.5.1b.3 Relating to Ice Condenser Ice Bed Changing Portion of Surveillances Pertaining to Lower Inlet Plenum Support Structures & Turning Vanes from 9-month Frequency to 18-month Frequency ML20237B5721998-08-12012 August 1998 Proposed Tech Specs 4.6.5.1b.3 Re Ice Condenser Sys Components W/Respect to Accumulation of Frost or Ice ML20237A0411998-08-0505 August 1998 Suppl 8 to Improved TS Noting Differences Between Two Units. Proposed Changes Require That Specs & Surveillances Apply to Each Unit Individually,Unless Otherwise Noted,Consistent W/Version of Current TS Prior to Amends 166 & 148 ML20236U1531998-07-22022 July 1998 Proposed Revised Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009P & DPC-NE-2009 ML20236G5301998-06-29029 June 1998 Rev to Bases of TS 3/4.6/3,correcting Editorial Errors ML20249C2081998-06-0909 June 1998 Rev 24 to Selected License Commitments (SLC) Manual & SLC 16.10.1,dtd June 1998 ML20247E3891998-05-0808 May 1998 Proposed Tech Specs,Revising Power Range Neutron Flux High Trip Setpoints in Event of Inoperable MSSVs & Deleting References to 3-loop Operation in Current TS Section 3.7.1.1(b) & Table 3.7-2 ML20217F2841998-04-20020 April 1998 Rev 7 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20217E6531998-04-20020 April 1998 Proposed Improved Tech Specs Re Section 1.0,2.0,3.0 & 4.0 ML20217B7871998-03-20020 March 1998 Marked-up Proposed Improved TS 3.6 & 5.5.2 ML20217N9311998-03-0303 March 1998 Proposed Tech Specs 5.5 Re Meteorological Tower Location ML20216B9851998-03-0202 March 1998 Proposed Tech Specs Responding to 980116 RAI Re Improved TS Sections 3.1 & 3.2.Suppl Changes to Improved TS Encl ML20203J9391998-02-19019 February 1998 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20198H5361997-12-17017 December 1997 Tech Spec Pages for TS 3/4.7.8 for Use in Lieu of ASME Section XI Requirements ML20197G4391997-12-17017 December 1997 Proposed Tech Specs Referencing Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR ML20203E1911997-12-0101 December 1997 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20217H5541997-10-13013 October 1997 Proposed Tech Specs Supporting Replacement of Three Safety Related Narrow Range Refueling Water Storage Tank Level Instruments W/Three Safety Related Wide Range Level Instruments ML20212A2511997-10-0606 October 1997 Proposed Tech Specs Deleting All References to Steam Line Low Pressure Safety Injection Function ML20216A8691997-09-0101 September 1997 Rev 0 to QAM-2.0, Order Entry ML20210K9281997-08-31031 August 1997 Cycle 12 Startup Rept ML20216B8171997-08-25025 August 1997 Rev 0 to PE-9778-1, Test Rept-Grinnell Hydraulic Snubber Freedom of Motion Test Under Duke Powers McGuire Nuclear Station MSLB Accident Temp Condition 1999-09-13
[Table view] |
Text
. -
t Attachment i DUKE POWER COMPANY McGuire Nuclear Station
- Proposed License Amendment i
f f 6
k i
i 4
g
- 1. Amend Facility Operating License NPF-9 by the following changes:
A. Revise paragraph 2K on page 19 to read:
K. The licensee is authorized to receive from the Oconee Nuclear Station, Units 1, 2 and 3, possess, and store irradiated Oconee fuel assemblies containing special nuclear material, enriched to not more than 3.24% by weight U-235 subject to the following conditions:
- a. Oconee fuel assemblies may not be placed in the -
McGuire Nuclear Station, Units 1 and 2 reactors.
- b. Irradiated fuel shipped to McGuire Nuclear Station,
. Units 1 and 2, from Oconce shall have been removed from the Oconee reactor no less than 270 days prior to shipment.
- c. No more than 300 Oconee irradiated fuel assemblies shall be received for storage at McGuire Nuclear Station Units 1 and 2, spent fuel pools.
- d. Burnup of Oconen fuel shipped shall be no greater than 36,000 MW days per metric ton.
- e. Receipt of irradiated Oconee fuel shall be limited by the use of the NFS-4.(NAC-1) or NLI-1/2 spent fuel casks.
- f. The spent fuel pool crane travel shall be restricted by administrative controls to the paths required by Technical Specification 3/4 9.7 whenever a spent fuel cask is being handled.
- 2. Amend Facility Operating License NPF-17 by the following changes:
A. Add paragraph 2J to read:
J.- The licensee is authorized to receive from tho Oconee Nuclear
_ Station, Units 1, 2 and 3, possess, and store irradiated Oconee fuel assemblies containing special nuclear material, enriched to not more than 3.24% by weight U-235 subject to the following conditions:
~'
- a. Oconee fuel assemblies may not be placed in the McGuire- *
-Nuclear Station, Units l'and 2, reactors..
- b. Irradiated fuel shipped to McGuire Nuclear Station Units 1 and 2, from Oconee shall have been removed from the Oconee reactor no less than~270 days prior to shipment.
d A $
L.
, - .- .._ ~ . _ .-
4
- c. ;No mors thtn 300 Oconsa irrediated fumi assemblics shall.
be received for storage at McGuire Nuclear Station, Units 1 and :2,: spent fuel pools.
- d. Burnuplof Oconee fuel shipped shall be no greater than 36,000 MW days per metric ton.
- e. Receipt of irradiated Oconee fuel shall be limited by the use
,! of the NFS-4 (NAC-1)_or NLI-1/2 spent. fuel casks.
- f. The spent fuel pool crane travel shall be restricted by adminis-trative. controls to the paths required by Technical Specification 3/4 9.7 whenever a spent fuel cask is being handled.
B. Change the designation of paragraph 2.J on page 9 to 2.L.
i r
a J '
I 1
'N l
d I
l ,
i
. g s
, Attachment 2 Technical Justification The existing license for McGuire Unit 1 allows for the storage of up to 300 spent fuel assemblies discharged from the Oconee Nuclear Station. While this provision applies only to the Unit 1 pool, storage of all or part of the allowed 300 Oconee assemblies in the McGuire Unit 2 spent fuel pool should technically have no increased impact on the safe operation of the Nuclear Station or its effect on the environment. This is primarily due to the identical design of the two pools and their related equipment and procedures as follows:
e A rerack of the Unit 1 pool scheduled for completion in late 1985 will install fuel racks which are identical in configuration to those installed recently in the Unit 2 pool. Both sets of racks were designed and fabricated by Westinghouse using common seismic, criticality, dimensional and thermal analyses. The resulting license submittal was common for both rerack jobs in all areas except for installation procedures. License approval for reracking both pools was obtained jointly from the NRC. The designs allow storage of B&W fuel.
e Spent fuel pool cooling equipment and resulting overall heat removal capacities of both pools are identical. Cooling Upgrade of either pool was determined unnecessary following the reracks.
e Cask handling procedures in both pools are identical in that the restrictive paths used for moving the cask in and out of the pit and platform area of the Unit 2 pool are a mirror image of those paths used in the Unit 1 pool. Procedures for opening, closing and deconing the cask are specific to the cask itself and will therefore be identical between pools.
e The cask tipping analysis covered in Chapter 9 of the McGuire FSAR is identical for both pools. This analysis addresses the question of whether or not the cask is capable of falling into the spent fuci pool. The same analysis is applicable for both pools because of the identical pool and pit geometry and dimensions between the two pools, e Cask and fuel handling equipment between the Unit 1 and Unit 2 pools are identical. Both pools have 125 ton capacity overhead cranes used for cask movement. Both pools are equiped with a set of handling tools used specifically for the Oconee fuel. The decontamination pits and associated equipment are the same between both pools and the wire gate systems for flooding the cask pits are identical.
e Other areas which are considered part of the overall system for receipt, handling, and storage of spent fuel are the receiving area and related equipment, the spent fuel pool building ventilation system, area and process radiation monitoring systems and the pool water filtration system. These are all additional areas where the two spent fuel pools are identical.
f
- I e -Both pools falling under the jurisdiction of a single nuclear station consequently share common emergency, health physics, security and safety procedures. Additionally, the manpower requirements for performing spent fuel handling-related work
-would be provided by the same group for both pools.
It is desireable from an overall standpoint to divide the inventory of Oconee spent fuel between the two pools at McGuire. This would reduce the need for on-site transfers of spent fuel in order to maintain a -
balanced inventory between the two pools.
J i-i i,
I I
e 4 ,
V e
r 1 6
.g 1
Attachment'3 Analysis of Significant Hazards-Considerations As required by 10 CFR 50.91, this analysis is provided concerning whether the proposed modifications of the Technical Specifications involve significant hazards considerations, as defined by 10 CFR 50.92.
The proposed License Amendment involves adding the authority to possess, receive and store irradiated Oconee fuel assemblies at McGuire Unit 2 in a manner identical to that presently _ authorized for McGuire Unit 1.
The capability of the McGuire Unit 2 spent fuel pool to store irradiated Oconee fuel assemblies has been previously reviewed and accepted by NRC. The systems and equipment for handling spent fuel are essentially identical at each McGuire Unit. Finally, the restrictions currently in place on McGuire Unit 1 concerning possession, receipt, and storage of irradiated Oconee fuel assemblies will be incorporated into the McGuire Unit 2 license.
This proposed License Amendment is essentially an administrative change. The technical and environmental issues associated with possession, receipt, and storage of irradiated Oconee-Fuel assemblies at McGuire have'been addressed previously.
The proposed License amendment herein does not:
- 1) Involve a significant increase in the probability or consequences of an accident previously evaluated; or
- 2) Create the possibility of a new or different kind of accident from any accident previously evaluated; or
- 3) Involve a significant reduction in a margin of safety.
Based upon the preceding, Duke Power Company concludes that the proposed amendments do not involve a significant hazard consideration.
L..