MONTHYEARML20100G4641985-04-0303 April 1985 Application for Amends to Licenses NPF-9 & NPF-17, Incorporating Into Unit 2 License Authority to Receive, Possess & Store Irradiated Oconee Fuel Assemblies Under Same Conditions as Presently Authorized by Unit 1.Fee Paid Project stage: Request ML20100G4881985-04-0303 April 1985 Proposed Tech Specs Re Possession & Storage of Irradiated Oconee Fuel Assemblies Containing SNM Project stage: Other ML20127H6421985-05-14014 May 1985 Application for Amend to Licenses NPF-9 & NPF-17, Incorporating Into Unit 2 License Authority to Receive, Possess & Store Irradiated Oconee Fuel Assemblies Under Conditions Authorized by Unit 1 License Project stage: Request ML20127J0351985-05-14014 May 1985 Proposed Tech Specs,Incorporating Into Unit 2 License Authority to Receive,Possess & Store Irradiated Oconee Fuel Assemblies Under Conditions Authorized by Unit 1 License Project stage: Other ML20128L4771985-05-16016 May 1985 Notice of Consideration of Issuance of Amend to Licenses NPF-9 & NPF-17 & Proposed NSHC Determination & Opportunity for Hearing Re Util 850403 Request to Store Oconee Spent Fuel at Unit 2 Project stage: Other ML20128L4561985-05-20020 May 1985 Forwards Notice of Consideration of Issuance of Amend to Licenses NPF-9 & NPF-17 & Proposed NSHC Determination & Opportunity for Hearing Re Util 850403 Request to Store Oconee Spent Fuel at Unit 2 Project stage: Other ML20126K5011985-06-12012 June 1985 Submits Addl Info Further Clarifying Util Position on Receiving,Possessing & Storing Irradiated Oconee Nuclear Station Fuel Assemblies Under Current License NPF-9 Conditions,Per 850403 & 850514 Proposed License Amends Project stage: Other ML20133A1891985-07-26026 July 1985 Forwards Unexecuted Amend 8 to Indemnity Agreement B-83 for Signature Project stage: Other ML20133C2101985-07-26026 July 1985 Amends 44 & 25 to Licenses NPF-9 & NPF-17,respectively, Incorporating License Authority to Receive,Possess & Store Irradiated Fuel Assemblies from Oconee Nuclear Station Project stage: Other ML20133C2181985-07-26026 July 1985 Safety Evaluation Supporting Amends 44 & 25 to Licenses NPF-9 & NPF-17,respectively Project stage: Approval ML17219A6301987-06-12012 June 1987 Proposed Tech Specs,Permitting Replacement of Spent Fuel Racks to Increase Capacity to 1,706 Spent Fuel Assemblies Project stage: Request ML13319A8041987-12-24024 December 1987 Forwards Transshipment of San Onofre Unit 1 Spent Fuel for Review & Approval,Per NRC Request at 870925 Meeting.Proposed Method for Transshipment of Spent Fuel to Units 2 & 3 Will Not Include Air Pallet Sys.Fee Paid Project stage: Meeting ML13319A8061987-12-31031 December 1987 Transshipment of San Onofre Unit 1 Spent Fuel Project stage: Other ML20196H1381988-02-0808 February 1988 Notice of Consideration of Issuance of Amends to Licenses NPF-10 & NPF-15 & Proposed NSHC Determination & Opportunity for Hearing on 871230 Request Re Possession of Byproduct & SNMs Produced by Unit 1 Project stage: Other ML17221A6341988-02-22022 February 1988 Environ Assessment & Finding of No Significant Hazard, Supporting Proposed Amend to License NPF-16,permitting Transfer of Unit 1 Spent Fuel Pool to Unit 2 Spent Fuel Pool Project stage: Other ML20149L8001988-02-22022 February 1988 Proposed Tech Specs 3/4.7.1.1, Safety Valves, 3.0.4, 3/4.3.2, ESF Actuation Sys Instrumentation, & 3/4.4.4, Steam Generators & Surveillance Requirements 4.0.3 & 4.0.4 Project stage: Other ML13303A8341988-02-26026 February 1988 Requests Addl Info Re Util 871231 Proposed Change to Licenses NPF-10 & NPF-15 to Allow Storage of Spent Fuel. Application for Amend to Licenses Must Be Received Before NRC Makes Final Determination on Issue Project stage: Other ML13303B8931988-03-0808 March 1988 Notification of Registration as User of Certificate of Compliance 9001 in Response to 880111 Request Project stage: Other ML13330B2941988-04-25025 April 1988 Forwards Transshipment of San Onofre Unit 1 Spent Fuel, .Rept Supercedes 871224 Rept Transmitted to NRC Project stage: Other ML13331B0391988-04-28028 April 1988 Application for Amend to License DPR-13,consisting of Proposed Change 181 to Amend Application 148,revising License Condition 3.C & Deleting Tech Spec 4.13, Turbine Deck Load Bearing Test & Visual Insp Project stage: Request ML13331B0371988-04-28028 April 1988 Forwards Amend Application 148,consisting of Proposed Change 181 to License DPR-13,revising License Condition 3.C & Deleting Tech Spec 4.13, Turbine Deck Load Bearing Test & Visual Insp Project stage: Request ML13331B0401988-04-28028 April 1988 Tech Spec 4.13 Requiring Performance of Turbine Deck Load Bearing Test Every 4 Yrs W/Use of Air Pallet Sys.Air Pallet Sys Will Not Be Used as Part of Proposed Method for Spent Fuel Shipment.Tech Spec Not Applicable Project stage: Other ML13330B2961988-04-30030 April 1988 Transshipment of San Onofre Unit 1 Spent Fuel Project stage: Other ML20196B7941988-06-22022 June 1988 Safety Evaluation Supporting Amends 63 & 52 to Licenses NPF-10 & NPF-15,respectively Project stage: Approval 1987-06-12
[Table View] |
Text
Southern California Edison Company P. 0. BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD, CALIFORNIA 91770 M.O.MEDFORD TELEPHONE MANAGER OF NUCLEAR ENGINEERING (818) 302-1749 AND LICENSING April 25, 1988 U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
Docket No. 50-206 San Onofre Nuclear Generating Station Unit 1 By letter dated December 24, 1987, SCE transmitted a report to the NRC which described the methodology which would be used to transship spent fuel from San Onofre Unit 1 to San Onofre Units 2 and 3. Since that submittal, changes have occurred in the methodology and in the structural design. Therefore, included as an enclosure is a report entitled "Transshipment of San Onofre Unit 1 Spent Fuel," dated April 1988.
This report supercedes the report transmitted to the NRC on December 24, 1987.
As a result of NRC staff review of the previous submittals, questions have been raised. Responses to NRC questions and concerns regarding this issue will be transmitted as a supplement to the enclosed report.
If you have any questions regarding this matter, please call me.
Very truly yours, Enclosure cc: 3. B. Martin, Regional Administrator, NRC Region V F. R. Huey, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3 PPDR ADC 0500PD