Letter Sequence Other |
|---|
|
Results
Other: ML13303A834, ML13303B893, ML13319A806, ML13330B294, ML13330B296, ML13331B040, ML17221A634, ML20100G488, ML20126K501, ML20127J035, ML20128L456, ML20128L477, ML20133A189, ML20133C210, ML20149L800, ML20196H138
|
MONTHYEARML20100G4641985-04-0303 April 1985 Application for Amends to Licenses NPF-9 & NPF-17, Incorporating Into Unit 2 License Authority to Receive, Possess & Store Irradiated Oconee Fuel Assemblies Under Same Conditions as Presently Authorized by Unit 1.Fee Paid Project stage: Request ML20100G4881985-04-0303 April 1985 Proposed Tech Specs Re Possession & Storage of Irradiated Oconee Fuel Assemblies Containing SNM Project stage: Other ML20127H6421985-05-14014 May 1985 Application for Amend to Licenses NPF-9 & NPF-17, Incorporating Into Unit 2 License Authority to Receive, Possess & Store Irradiated Oconee Fuel Assemblies Under Conditions Authorized by Unit 1 License Project stage: Request ML20127J0351985-05-14014 May 1985 Proposed Tech Specs,Incorporating Into Unit 2 License Authority to Receive,Possess & Store Irradiated Oconee Fuel Assemblies Under Conditions Authorized by Unit 1 License Project stage: Other ML20128L4771985-05-16016 May 1985 Notice of Consideration of Issuance of Amend to Licenses NPF-9 & NPF-17 & Proposed NSHC Determination & Opportunity for Hearing Re Util 850403 Request to Store Oconee Spent Fuel at Unit 2 Project stage: Other ML20128L4561985-05-20020 May 1985 Forwards Notice of Consideration of Issuance of Amend to Licenses NPF-9 & NPF-17 & Proposed NSHC Determination & Opportunity for Hearing Re Util 850403 Request to Store Oconee Spent Fuel at Unit 2 Project stage: Other ML20126K5011985-06-12012 June 1985 Submits Addl Info Further Clarifying Util Position on Receiving,Possessing & Storing Irradiated Oconee Nuclear Station Fuel Assemblies Under Current License NPF-9 Conditions,Per 850403 & 850514 Proposed License Amends Project stage: Other ML20133A1891985-07-26026 July 1985 Forwards Unexecuted Amend 8 to Indemnity Agreement B-83 for Signature Project stage: Other ML20133C2101985-07-26026 July 1985 Amends 44 & 25 to Licenses NPF-9 & NPF-17,respectively, Incorporating License Authority to Receive,Possess & Store Irradiated Fuel Assemblies from Oconee Nuclear Station Project stage: Other ML20133C2181985-07-26026 July 1985 Safety Evaluation Supporting Amends 44 & 25 to Licenses NPF-9 & NPF-17,respectively Project stage: Approval ML17219A6301987-06-12012 June 1987 Proposed Tech Specs,Permitting Replacement of Spent Fuel Racks to Increase Capacity to 1,706 Spent Fuel Assemblies Project stage: Request ML13319A8041987-12-24024 December 1987 Forwards Transshipment of San Onofre Unit 1 Spent Fuel for Review & Approval,Per NRC Request at 870925 Meeting.Proposed Method for Transshipment of Spent Fuel to Units 2 & 3 Will Not Include Air Pallet Sys.Fee Paid Project stage: Meeting ML13319A8061987-12-31031 December 1987 Transshipment of San Onofre Unit 1 Spent Fuel Project stage: Other ML20196H1381988-02-0808 February 1988 Notice of Consideration of Issuance of Amends to Licenses NPF-10 & NPF-15 & Proposed NSHC Determination & Opportunity for Hearing on 871230 Request Re Possession of Byproduct & SNMs Produced by Unit 1 Project stage: Other ML17221A6341988-02-22022 February 1988 Environ Assessment & Finding of No Significant Hazard, Supporting Proposed Amend to License NPF-16,permitting Transfer of Unit 1 Spent Fuel Pool to Unit 2 Spent Fuel Pool Project stage: Other ML20149L8001988-02-22022 February 1988 Proposed Tech Specs 3/4.7.1.1, Safety Valves, 3.0.4, 3/4.3.2, ESF Actuation Sys Instrumentation, & 3/4.4.4, Steam Generators & Surveillance Requirements 4.0.3 & 4.0.4 Project stage: Other ML13303A8341988-02-26026 February 1988 Requests Addl Info Re Util 871231 Proposed Change to Licenses NPF-10 & NPF-15 to Allow Storage of Spent Fuel. Application for Amend to Licenses Must Be Received Before NRC Makes Final Determination on Issue Project stage: Other ML13303B8931988-03-0808 March 1988 Notification of Registration as User of Certificate of Compliance 9001 in Response to 880111 Request Project stage: Other ML13330B2941988-04-25025 April 1988 Forwards Transshipment of San Onofre Unit 1 Spent Fuel, .Rept Supercedes 871224 Rept Transmitted to NRC Project stage: Other ML13331B0391988-04-28028 April 1988 Application for Amend to License DPR-13,consisting of Proposed Change 181 to Amend Application 148,revising License Condition 3.C & Deleting Tech Spec 4.13, Turbine Deck Load Bearing Test & Visual Insp Project stage: Request ML13331B0371988-04-28028 April 1988 Forwards Amend Application 148,consisting of Proposed Change 181 to License DPR-13,revising License Condition 3.C & Deleting Tech Spec 4.13, Turbine Deck Load Bearing Test & Visual Insp Project stage: Request ML13331B0401988-04-28028 April 1988 Tech Spec 4.13 Requiring Performance of Turbine Deck Load Bearing Test Every 4 Yrs W/Use of Air Pallet Sys.Air Pallet Sys Will Not Be Used as Part of Proposed Method for Spent Fuel Shipment.Tech Spec Not Applicable Project stage: Other ML13330B2961988-04-30030 April 1988 Transshipment of San Onofre Unit 1 Spent Fuel Project stage: Other ML20196B7941988-06-22022 June 1988 Safety Evaluation Supporting Amends 63 & 52 to Licenses NPF-10 & NPF-15,respectively Project stage: Approval 1987-06-12
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 February 26, 1988 Docket Nos.:
50-361 and 50-362 Mr. Kenneth P. Baskin Mr. Gary 0. Cotton Vice President Senior Vice President Southern California Edison Company Engineering and Operations 2244 Walnut Grove Avenue San Diego Gas and Electric Company Post Office Box 800 101 Ash Street Rusemead, California 91770 Post Office Box 1831 San Diego, California 92112
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION, SAN ONOFRE 2 AND 3 (TAC NOS. 66970 AND 66971)
Gentlemen:
By letter dated December 30, 1987, you submitted a proposed change to Facility Operating Licenses NPF-10 and NPF-15 to allow storage of spent fuel produced by the operation of San Onofre Unit 1 at Unit 2 and Unit 3. In response to our request, you submitted additional information regarding this request by letter dated January 12, 1988. To complete our review of your proposal, we find that we will require additional input from you as described below.
The December 30, 1987 submittal was not an application for amendnient of your licenses as described in 10 CFR 50.90. Such application must be received before we can make a final determination of this issue. In the future, such an application must be received before we can begin the review process.
In your letter of January 12, 1988 you state that "Potential....fuel handling accident and spent fuel cask drop accidents from storing Unit 1 spent fuel at Units 2 and 3 were previously evaluated. The analyses documented in the Units 2 and 3 FSAR Sections 9.1.2, 9.1.3, 9.1.4, 15.7.3.4 and 15.7.3.5 directly evaluated or conservatively bounded the potential accidents with Unit 1 fuel."
[ 880309012 802 PDR 3ADO0C 0500o.36
___PPDR;
Mr. Kenneth P. Baskin San Onofre Nuclear Generating Southern California Edison Company Station, Units 2 and 3 cc:
Mr. James C. Holcombe Mr. Hans Kaspar, Executive Director Vice President - Power Supply Marine Review Committee, Inc.
San Diego Gas & Electric Company 531 Encinitas Boulevard, Suite 105 101 Ash Street Encinitas, California 92024 Post Office Box 1831 San Diego, California 92112 Mr. Mark Medford Southern California Edison Company Charles R. Kocher, Esq.
2244 Walnut Grove Avenue James A. Beoletto, Esq.
P. 0. Box 800 Southern California Edison Company Rosemead, California 91770 2244 Walnut Grove Avenue P. 0. Box 800 Mr. Stephen B. Allman Rosemead, California 91770 Manager, Nuclear Department San Diego Gas & Electric Company Orrick, Herrington & Sutcliffe P. 0. Box 1831 ATTN: David R. Pigott, Esq.
San Diego, California 92112 600 Montgomery Street San Francisco, California 94111 Richard J. Wharton, Esq.
University of San Diego School of Alan R. Watts, Esq.
Law Rourke & Woodruff Environmental Law Clinic 701 S. Parker St. No. 7000 San Diego, California 92110 Orange, California 92668-4702 Charles E. McClung, Jr., Esq.
Attorney at Law Mr. S. McClusky 24012 Calle de la Plaza/Suite 330 Bechtel Power Corporation Laguna Hills, California 92653 P. 0. Box 60860, Terminal Annex Los Angeles, California 90060 Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. C. B. Brinkman 1450 Maria Lane/Suite 210 Combustion Engineering, Inc.
Walnut Creek, California 94596 7910 Woodmont Avenue, Suite 1310 Bethesda, Maryland 20814 Resident Inspector, San Onofre NPS c/o U. S. Nuclear 'Regulatory Commission Mr. Dennis F. Kirsh Post Office Box 4329 U.S. Nuclear Regulatory Commission San Clemente, California 92672 Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Mr. Dennis M. Smith, Chief Radiological Programs Division Governor's Office of Emergency Services 2800 Meadowview Road Sacramento, California 95832
-2 Contrary to this statement, Sections 9.1.4, 15.7.3.4, and 15.7.3.5 of the FSAR do not address Unit 1 in their descriptions of the Fuel Handling System, Design Basis Fuel Handling Accidents, and the Spent Fuel Cask Drop Accidents repectively.
Please provide these evaluations.
Sincerely, original signed by Donald E. Hickman, Project Manager Project Directorate V Division of Reactor Projects -
- III, IV, V and Special Projects See next page DISTRIBUTION Docket File NRC & LPDRs DEHickman GHolahan JLee SRXB OGC (for info)
EJordan PDV Plant File JPartlow ACRS (10)
PDV DRSP/PDV 0
DR PDV JwDEHickman:dr G ighton
/88 zZ/fQ/88
/
8
- /36/88 OFFICIAL RECORD COPY