Letter Sequence Meeting |
|---|
|
Results
Other: ML13303A834, ML13303B893, ML13319A806, ML13330B294, ML13330B296, ML13331B040, ML17221A634, ML20100G488, ML20126K501, ML20127J035, ML20128L456, ML20128L477, ML20133A189, ML20133C210, ML20149L800, ML20196H138
|
MONTHYEARML20100G4641985-04-0303 April 1985 Application for Amends to Licenses NPF-9 & NPF-17, Incorporating Into Unit 2 License Authority to Receive, Possess & Store Irradiated Oconee Fuel Assemblies Under Same Conditions as Presently Authorized by Unit 1.Fee Paid Project stage: Request ML20100G4881985-04-0303 April 1985 Proposed Tech Specs Re Possession & Storage of Irradiated Oconee Fuel Assemblies Containing SNM Project stage: Other ML20127H6421985-05-14014 May 1985 Application for Amend to Licenses NPF-9 & NPF-17, Incorporating Into Unit 2 License Authority to Receive, Possess & Store Irradiated Oconee Fuel Assemblies Under Conditions Authorized by Unit 1 License Project stage: Request ML20127J0351985-05-14014 May 1985 Proposed Tech Specs,Incorporating Into Unit 2 License Authority to Receive,Possess & Store Irradiated Oconee Fuel Assemblies Under Conditions Authorized by Unit 1 License Project stage: Other ML20128L4771985-05-16016 May 1985 Notice of Consideration of Issuance of Amend to Licenses NPF-9 & NPF-17 & Proposed NSHC Determination & Opportunity for Hearing Re Util 850403 Request to Store Oconee Spent Fuel at Unit 2 Project stage: Other ML20128L4561985-05-20020 May 1985 Forwards Notice of Consideration of Issuance of Amend to Licenses NPF-9 & NPF-17 & Proposed NSHC Determination & Opportunity for Hearing Re Util 850403 Request to Store Oconee Spent Fuel at Unit 2 Project stage: Other ML20126K5011985-06-12012 June 1985 Submits Addl Info Further Clarifying Util Position on Receiving,Possessing & Storing Irradiated Oconee Nuclear Station Fuel Assemblies Under Current License NPF-9 Conditions,Per 850403 & 850514 Proposed License Amends Project stage: Other ML20133A1891985-07-26026 July 1985 Forwards Unexecuted Amend 8 to Indemnity Agreement B-83 for Signature Project stage: Other ML20133C2101985-07-26026 July 1985 Amends 44 & 25 to Licenses NPF-9 & NPF-17,respectively, Incorporating License Authority to Receive,Possess & Store Irradiated Fuel Assemblies from Oconee Nuclear Station Project stage: Other ML20133C2181985-07-26026 July 1985 Safety Evaluation Supporting Amends 44 & 25 to Licenses NPF-9 & NPF-17,respectively Project stage: Approval ML17219A6301987-06-12012 June 1987 Proposed Tech Specs,Permitting Replacement of Spent Fuel Racks to Increase Capacity to 1,706 Spent Fuel Assemblies Project stage: Request ML13319A8041987-12-24024 December 1987 Forwards Transshipment of San Onofre Unit 1 Spent Fuel for Review & Approval,Per NRC Request at 870925 Meeting.Proposed Method for Transshipment of Spent Fuel to Units 2 & 3 Will Not Include Air Pallet Sys.Fee Paid Project stage: Meeting ML13319A8061987-12-31031 December 1987 Transshipment of San Onofre Unit 1 Spent Fuel Project stage: Other ML20196H1381988-02-0808 February 1988 Notice of Consideration of Issuance of Amends to Licenses NPF-10 & NPF-15 & Proposed NSHC Determination & Opportunity for Hearing on 871230 Request Re Possession of Byproduct & SNMs Produced by Unit 1 Project stage: Other ML17221A6341988-02-22022 February 1988 Environ Assessment & Finding of No Significant Hazard, Supporting Proposed Amend to License NPF-16,permitting Transfer of Unit 1 Spent Fuel Pool to Unit 2 Spent Fuel Pool Project stage: Other ML20149L8001988-02-22022 February 1988 Proposed Tech Specs 3/4.7.1.1, Safety Valves, 3.0.4, 3/4.3.2, ESF Actuation Sys Instrumentation, & 3/4.4.4, Steam Generators & Surveillance Requirements 4.0.3 & 4.0.4 Project stage: Other ML13303A8341988-02-26026 February 1988 Requests Addl Info Re Util 871231 Proposed Change to Licenses NPF-10 & NPF-15 to Allow Storage of Spent Fuel. Application for Amend to Licenses Must Be Received Before NRC Makes Final Determination on Issue Project stage: Other ML13303B8931988-03-0808 March 1988 Notification of Registration as User of Certificate of Compliance 9001 in Response to 880111 Request Project stage: Other ML13330B2941988-04-25025 April 1988 Forwards Transshipment of San Onofre Unit 1 Spent Fuel, .Rept Supercedes 871224 Rept Transmitted to NRC Project stage: Other ML13331B0391988-04-28028 April 1988 Application for Amend to License DPR-13,consisting of Proposed Change 181 to Amend Application 148,revising License Condition 3.C & Deleting Tech Spec 4.13, Turbine Deck Load Bearing Test & Visual Insp Project stage: Request ML13331B0371988-04-28028 April 1988 Forwards Amend Application 148,consisting of Proposed Change 181 to License DPR-13,revising License Condition 3.C & Deleting Tech Spec 4.13, Turbine Deck Load Bearing Test & Visual Insp Project stage: Request ML13331B0401988-04-28028 April 1988 Tech Spec 4.13 Requiring Performance of Turbine Deck Load Bearing Test Every 4 Yrs W/Use of Air Pallet Sys.Air Pallet Sys Will Not Be Used as Part of Proposed Method for Spent Fuel Shipment.Tech Spec Not Applicable Project stage: Other ML13330B2961988-04-30030 April 1988 Transshipment of San Onofre Unit 1 Spent Fuel Project stage: Other ML20196B7941988-06-22022 June 1988 Safety Evaluation Supporting Amends 63 & 52 to Licenses NPF-10 & NPF-15,respectively Project stage: Approval 1987-06-12
[Table View] |
Text
!o Southern California Edison Company P.0.
BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD CALIFORNIA91770 M.O.MEDFORD TELEPHONE MANAGER OF NUCLEAR ENGINEERING December (818) 302-1749 AND LICENSINGDeebr2
,18 U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
Docket Nos. 50-206, 50-361 and 50-362 Spent Fuel Transshipment San Onofre Nuclear Generating Station Units 1, 2 and 3 On September 25, 1987, representatives of SCE met with the NRC staff to discuss the transshipment of San Onofre Unit 1 spent fuel to the San Onofre Units 2 and 3 Fuel Handling Buildings. A presentation was made to the NRC staff and is documented in the NRC's Meeting Summary dated October 1, 1987.
Overall the staff indicated that SCE's proposed method for transshipment appeared acceptable and requested that SCE provide documentation of the proposed method of shipment and relevant issues. The requested report entitled "Transshipment of San Onofre Unit 1 Spent Fuel" dated December 1987 is enclosed.
The past method for shipment of spent fuel at San Onofre Unit 1 involved the use of an air pallet system transporting a spent fuel cask containing a single spent fuel assembly. In order to implement this system, modifications to the turbine building were required by License Condition 3.C, and a load bearing test on the turbine deck was required by Technical Specification 4.13, Turbine Deck Load Bearing Test and Visual Inspection. In addition, Technical Specification 4.13 requires a turbine deck load bearing test every four years to support use of the air pallet system.
The proposed method for transshipment of spent fuel from San Onofre Unit 1 to San Onofre Units 2 and 3 will not include the air pallet system. As described in the enclosed report the turbine gantry crane will transport a multi-element spent fuel cask at San Onofre Unit 1. A description of the method of transshipment and a discussion of the issues raised by the NRC staff during the September 25 meeting are provided in the enclosed report.
SCE requests that the NRC staff review the enclosed report and provide their approval of the proposed transshipment method. SCE is currently planning to shut San Onofre Unit 1 down in February 1988 to perform surveillances and some modifications. During that shutdown, SCE intends to initiate the transshipment of spent fuel from Unit 1 to Units 2 and 3. In order to support 8712300106 871224 PDR ADOCK 05000206 P
IICD 4
J c.$cc.'
Document Control Desk December 24, 1987 this activity SCE requests NRC approval by February 12, 1988.
Following receipt of NRC approval for this transshipment method, SCE will submit a proposed license change to delete the license condition and technical specification which are only applicable to the air pallet system.
Pursuant to 10 CFR 170.12 it has been determined that the NRC's review of this request requires an application fee of $150. Provided as an enclosure is a check in the amount of $150.
If you have any questions regarding this matter, please let me know.
Very truly yours, Enclosure cc: D. E. Hickman, NRR Project Manager, San Onofre Unit 1 H. Rood, NRR Senior Project Manager, San Onofre Units 2 and 3
- 3. B. Martin, Regional Administrator, NRC Region V F. R. Huey, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3
ACCELERATED DA JBUTION DEMONST AON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8712300106 DOC.DATE: 87/12/24 NOTARIZED: NO DOCKET #
FACIL:50-206 San Onofre Nuclear Station, Unit 1, Southern Californ 05000206 50-361 San Onofre Nuclear Station, Unit 2, Southern Californ 05000361 50-362 San Onofre Nuclear Station, Unit 3, Southern Californ 05000362 AUTH.NAME AUTHOR AFFILIATION MEDFORD,M.O.
Southern California Edison Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards "Transshipment of San Onofre Unit 1 Spent Fuel" for review & approval.
DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR J.-ENCL W-SIZE:______
TITLE: OR Submittal: General Distribution D
NOTES:License Exp date in accordance with 10CFR2,2.109.
05000206 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1
0 PD5 PD 5
5 A
BRADFUTE,J 1
1 ROOD,H 1
1 INTERNAL: ACRS 6
6 ARM/DAF/LFMB 1
0 NRR/DEST/ADS 1
1 NRR/DEST/CEB 1
1 NRR/DEST/MTB 1
1 NRR/DEST/RSB 1
1 NRR/DOEA/TSB 1
1 NRR/zPMAS/ILRB 1
1 S
OGC/HDS2 1
0 EG FIL 01 1
1 RES/DE/EIB 1
1 EXTERNAL: LPDR 2
2 NRC PDR 1
1 NSIC 1
1 I
D S
D D
S TOTAL NUMBER OF COPIES REQUIRED: LTTR 28 ENCL 25