Forwards Transshipment of San Onofre Unit 1 Spent Fuel for Review & Approval,Per NRC Request at 870925 Meeting.Proposed Method for Transshipment of Spent Fuel to Units 2 & 3 Will Not Include Air Pallet Sys.Fee Paid
ML13319A804
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/24/1987
From: Medford M
Southern California Edison Co
To:
NRC Office of Administration & Resources Management (ARM)
Shared Package
ML13319A805 List:
References
TAC-66970, TAC-66971 NUDOCS 8712300106
Download: ML13319A804 (3)


Text

!o Southern California Edison Company P.0.

BOX 800 2244 WALNUT GROVE AVENUE ROSEMEAD CALIFORNIA91770 M.O.MEDFORD TELEPHONE MANAGER OF NUCLEAR ENGINEERING December (818) 302-1749 AND LICENSINGDeebr2

,18 U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket Nos. 50-206, 50-361 and 50-362 Spent Fuel Transshipment San Onofre Nuclear Generating Station Units 1, 2 and 3 On September 25, 1987, representatives of SCE met with the NRC staff to discuss the transshipment of San Onofre Unit 1 spent fuel to the San Onofre Units 2 and 3 Fuel Handling Buildings. A presentation was made to the NRC staff and is documented in the NRC's Meeting Summary dated October 1, 1987.

Overall the staff indicated that SCE's proposed method for transshipment appeared acceptable and requested that SCE provide documentation of the proposed method of shipment and relevant issues. The requested report entitled "Transshipment of San Onofre Unit 1 Spent Fuel" dated December 1987 is enclosed.

The past method for shipment of spent fuel at San Onofre Unit 1 involved the use of an air pallet system transporting a spent fuel cask containing a single spent fuel assembly. In order to implement this system, modifications to the turbine building were required by License Condition 3.C, and a load bearing test on the turbine deck was required by Technical Specification 4.13, Turbine Deck Load Bearing Test and Visual Inspection. In addition, Technical Specification 4.13 requires a turbine deck load bearing test every four years to support use of the air pallet system.

The proposed method for transshipment of spent fuel from San Onofre Unit 1 to San Onofre Units 2 and 3 will not include the air pallet system. As described in the enclosed report the turbine gantry crane will transport a multi-element spent fuel cask at San Onofre Unit 1. A description of the method of transshipment and a discussion of the issues raised by the NRC staff during the September 25 meeting are provided in the enclosed report.

SCE requests that the NRC staff review the enclosed report and provide their approval of the proposed transshipment method. SCE is currently planning to shut San Onofre Unit 1 down in February 1988 to perform surveillances and some modifications. During that shutdown, SCE intends to initiate the transshipment of spent fuel from Unit 1 to Units 2 and 3. In order to support 8712300106 871224 PDR ADOCK 05000206 P

IICD 4

J c.$cc.'

Document Control Desk December 24, 1987 this activity SCE requests NRC approval by February 12, 1988.

Following receipt of NRC approval for this transshipment method, SCE will submit a proposed license change to delete the license condition and technical specification which are only applicable to the air pallet system.

Pursuant to 10 CFR 170.12 it has been determined that the NRC's review of this request requires an application fee of $150. Provided as an enclosure is a check in the amount of $150.

If you have any questions regarding this matter, please let me know.

Very truly yours, Enclosure cc: D. E. Hickman, NRR Project Manager, San Onofre Unit 1 H. Rood, NRR Senior Project Manager, San Onofre Units 2 and 3

3. B. Martin, Regional Administrator, NRC Region V F. R. Huey, NRC Senior Resident Inspector, San Onofre Units 1, 2 and 3

ACCELERATED DA JBUTION DEMONST AON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8712300106 DOC.DATE: 87/12/24 NOTARIZED: NO DOCKET #

FACIL:50-206 San Onofre Nuclear Station, Unit 1, Southern Californ 05000206 50-361 San Onofre Nuclear Station, Unit 2, Southern Californ 05000361 50-362 San Onofre Nuclear Station, Unit 3, Southern Californ 05000362 AUTH.NAME AUTHOR AFFILIATION MEDFORD,M.O.

Southern California Edison Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "Transshipment of San Onofre Unit 1 Spent Fuel" for review & approval.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR J.-ENCL W-SIZE:______

TITLE: OR Submittal: General Distribution D

NOTES:License Exp date in accordance with 10CFR2,2.109.

05000206 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1

0 PD5 PD 5

5 A

BRADFUTE,J 1

1 ROOD,H 1

1 INTERNAL: ACRS 6

6 ARM/DAF/LFMB 1

0 NRR/DEST/ADS 1

1 NRR/DEST/CEB 1

1 NRR/DEST/MTB 1

1 NRR/DEST/RSB 1

1 NRR/DOEA/TSB 1

1 NRR/zPMAS/ILRB 1

1 S

OGC/HDS2 1

0 EG FIL 01 1

1 RES/DE/EIB 1

1 EXTERNAL: LPDR 2

2 NRC PDR 1

1 NSIC 1

1 I

D S

D D