Letter Sequence RAI |
---|
|
|
MONTHYEARML20149G9741977-11-10010 November 1977 Summary of 771025 Meeting W/Util in Silver Spring,Md Re Storage of Oconee Nuclear Station Spent Fuel at McGuire Nuclear Station.List of Attendees Encl Project stage: Meeting ML20149H7251977-12-29029 December 1977 Forwards Request for Addl Info Re Rev 24 to FSAR Re Storage of Oconee Fuel at McGuire Facility Project stage: RAI ML20149H7111978-01-0404 January 1978 Forwards Request for Addl Info Re Rev 24 to FSAR Concerning Storage of Oconee Spent Fuel at McGuire Facility Project stage: RAI ML20149H5791978-03-0909 March 1978 Application for Amend to License SNM-1773,authorizing Storage of Oconee Spent Fuel at McGuire Facility Prior to Issuance of McGuire OL Project stage: Request ML20147B9001978-04-19019 April 1978 Confirms 780418 Conversation Re Site Visit on 780425-27 by NRC & Contractor Personnel.Areas of Interest to Be Reviewed for Both McGuire & Oconee Sites Are Listed Project stage: Other ML20147B7951978-05-0808 May 1978 Discusses 780425-27 Site Visit Made to Familiarize Proj Manager & Contractors W/Spent Fuel Facil Project stage: Other ML20149H1011978-05-19019 May 1978 Forwards Request for Addl Info Re Application for Amend to License SNM-1773,including Licensing of Spent Fuel Pool as Isfsi.Meeting W/Util Requested to Resolve Matter.Response to Encl Questions Needed by 780605 Project stage: RAI ML20147C7361978-05-23023 May 1978 Notification of 780602 Meeting Re Proposed Transport of 120 Day Old Vice 1 Year Old Spent Fuel from Oconee Nuc Station to McGuire Nuc Station for Interim Storage Project stage: Meeting ML20149H8721978-07-21021 July 1978 Forwards Request for Addl Info Re Application for Amend to License SNM-1773 Re Storage of Oconee Spent Fuel at McGuire Facility.Response Requested within 30 Days of Receipt of Ltr Project stage: RAI ML20149H3071978-08-0202 August 1978 Forwards Schedule Used by NRC to Insure Timely Review Process.Dates Shown Reflect Best Practical Estimate Which Can Be Made at This Time.Date of Completion & Final Decision on Licensing Action Will Depend on Result of Hearings Held Project stage: Other ML20150A6631978-09-26026 September 1978 Forwards Review of Draft EIS for Transshipment & Storage of Irradiated Oconee Fuel at Subj Facil.Requests Review for Consistency W/Nrr Review of McGuire Appl.Meeting W/Pacific Nw Lab 781002 ML20080P8411984-02-17017 February 1984 Application for Amend to Licenses NPF-9 & NPF-17,allowing Spent Fuel Pool Storage Capacity Expansion from 500 to 1,463 Spaces for Each Spent Fuel Pool.Supporting Documentation Encl Project stage: Request ML20100G4641985-04-0303 April 1985 Application for Amends to Licenses NPF-9 & NPF-17, Incorporating Into Unit 2 License Authority to Receive, Possess & Store Irradiated Oconee Fuel Assemblies Under Same Conditions as Presently Authorized by Unit 1.Fee Paid Project stage: Request ML20127H6421985-05-14014 May 1985 Application for Amend to Licenses NPF-9 & NPF-17, Incorporating Into Unit 2 License Authority to Receive, Possess & Store Irradiated Oconee Fuel Assemblies Under Conditions Authorized by Unit 1 License Project stage: Request ML20127J0351985-05-14014 May 1985 Proposed Tech Specs,Incorporating Into Unit 2 License Authority to Receive,Possess & Store Irradiated Oconee Fuel Assemblies Under Conditions Authorized by Unit 1 License Project stage: Other ML20128L4771985-05-16016 May 1985 Notice of Consideration of Issuance of Amend to Licenses NPF-9 & NPF-17 & Proposed NSHC Determination & Opportunity for Hearing Re Util 850403 Request to Store Oconee Spent Fuel at Unit 2 Project stage: Other ML20128L4561985-05-20020 May 1985 Forwards Notice of Consideration of Issuance of Amend to Licenses NPF-9 & NPF-17 & Proposed NSHC Determination & Opportunity for Hearing Re Util 850403 Request to Store Oconee Spent Fuel at Unit 2 Project stage: Other ML20126K5011985-06-12012 June 1985 Submits Addl Info Further Clarifying Util Position on Receiving,Possessing & Storing Irradiated Oconee Nuclear Station Fuel Assemblies Under Current License NPF-9 Conditions,Per 850403 & 850514 Proposed License Amends Project stage: Other ML20133A1891985-07-26026 July 1985 Forwards Unexecuted Amend 8 to Indemnity Agreement B-83 for Signature Project stage: Other 1978-07-21
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20062H1911982-08-0303 August 1982 Notifies That Apr 1982 Revision 6 to Spent Fuel Transportation Plan Meets Requirements of 10CFR73.37 & Is Approved.Revised Plan Contains Safeguards Info Which Should Be Withheld (Ref 10CFR73.21) ML20148D2261980-07-11011 July 1980 Responds to Util 800417,28 & 0702 Ltrs Re Physical Protection of Irradiated Reactor Fuel in Transit.Approves Revision 3 to Spent Fuel Transportation Plan ML15219A0501980-04-25025 April 1980 Forwards Addl Comments to Gaston County Board of Commissioners' Position Opposing Spent Nuclear Fuel Shipment Through County & Two Proposed Alternate Routes.Author Does Not Oppose Shipment If Adequate Safeguards Are Provided ML20126D2031980-03-20020 March 1980 Favors Transport of Nuclear Waste Through Mount Holly,Nc. Other Dangerous Shipments Routinely Pass Through City ML20126D1991980-03-19019 March 1980 Discusses Gaston County,Nc Resolution Re Transportation of Spent Nuclear Fuel Through County.Requests Opportunity to Present Resolution at NRC 800428 Hearing in Charlotte Nc ML20126D2061980-03-19019 March 1980 Favors Shipment of Nuclear Waste Through Denver,Nc & Storage of Waste at Nearby Nuclear Plant ML20126D2111980-03-18018 March 1980 Opposes Transport of Nuclear Waste Through Mount Holly,Nc. Route Is Extremely Hazardous Due to Presence of high-speed Intersection & Frequency of Accidents ML20126D2151980-03-11011 March 1980 Opposes Transport of Nuclear Waste Through Lincolnton,Nc. Questions Necessity of Transporting Safe Matl from Plant ML20126D2181980-03-0707 March 1980 Notifies That Gaston Taxpayers Association Opposes Transport of Nuclear Waste from Gaston Nc Facility ML20126D1941980-03-0505 March 1980 Protests Proposed Shipment of Nuclear Waste from Facility in Sc to Facility in Nc.Nuclear Plants Should Be Required to Neutralize Radioactive Matl Rather than Transport It ML20126C0591980-03-0404 March 1980 Notifies That Requirement Contained in NRC 790803 & 15 Ltrs Re Withholding Identification of Specific Approved Spent Fuel Routes Is Rescinded.Commission 800229 Order in Response to NRC Petition,Reversed Previous Policy ML20147C8011978-11-30030 November 1978 Confirms Staff'S Request for an Extension of Time to Respond to Interrogs by Carolina Environ Study Grp Propounded 781115 & Request to Produce Served by Cesg on 781116.Staff Responses Will Be Provided by 781229 ML20147G9141978-11-28028 November 1978 Believes NRC Should Have Informed Lg Ervin of the Possibility of Intervention ML20147C2311978-11-27027 November 1978 Discusses 780602 Meeting W/Nrc Re Transp Costs for Shipment of Spent Fuel.Forwards More Accurate Spent Fuel Transp Cost Estimates ML20150E3131978-11-21021 November 1978 Responds to Re Concern About DPC Proposal to Transport Spent Nuc Fuel from Oconee Nuc Facil Located in Sc for Storage in Spent Fuel Pool at McGuire Nuc Facil, Charlotte,Nc.Issue Will Be Heard Before ASLB ML20150E3181978-11-21021 November 1978 Ltr of Concern Re DPC Plan to Transport 420 Loads of Nuc Waste Matl Over Sc Highways.Urges That DPC Not Be Permitted to Transport Its Nuc Waste in Such a Manner ML20147B7641978-11-20020 November 1978 Appl for Extension of Time for Matl Lic SNM-1773 to 781231. Lic Currently Expires on 781231 ML20147C7701978-11-15015 November 1978 Forwards Third Round of Discovery Questions.Observes NRC Has Not Responded to First Set of Interrogs.W/Encl Request to Produce & Cert of Svc ML20153B0471978-11-13013 November 1978 Names of Petitioners Intervening Have Been Placed on Svc List to Receive Copies of Documents Routinely Sent to Pdr. Also Lists & Forwards Documents Sent to PDR Prior to Initiation of Automatic Svc ML20150D4091978-11-0909 November 1978 Forwards List of Documents Filed W/Atomic Safety & Licensing Bd in Proc Dealing W/Amend of Matl Lic SNM-1773 ML20148H1611978-10-26026 October 1978 Forwards Affidavits of J Adams of NRDC & K Bossong of Citizens Energy Proj ML20148C0381978-10-19019 October 1978 Responds to 780919 Request for Addl Info Re Licensing Action.Nrc Info Practices Must Be Met.Notification of All Meetings Will Be Sent ML20148G7991978-10-18018 October 1978 Forwards Concerns of County Council Re Proposed Transport of Nuc Waste by Duke Pwr Co as Presented at 781017 Pub Meeting. Prefers Nuc Waste to Remain at Present Site Until Final Disposition Plan Made or to Use Alternate Road Route ML20062C3261978-10-18018 October 1978 Responds to 781012 NRC Request for Info Re Amend to Lic SNM-1773 for Spent Fuel Shipment to Mcguire.Finds That Reracking Oconee Spent Fuel Pool Is Tech Feasible as a Possible Future Action,But Requests Processing of Appl Now ML20150B5611978-10-16016 October 1978 Opposes Applicant Request to Respond to Intervenor Contentions on Day of Hearing.Procedure Deprives Intervenor of Opportunity to Respond & Opportunity for Due Process ML20148A5761978-10-13013 October 1978 Requests Extension Until 781024 to File Responses to Petitioner Contentions ML20148K2451978-10-12012 October 1978 Requests Addl Info Re Dpc'S Eval of Alternatives to Transp Oconee Spent Fuel to McGuire Site,Specifically on Increase of Storage Capacity at Existing Oconee Basins,Needed for Review of Appl for Amend of Special Nuc Matl Lic SNM-1773 ML20197B1591978-10-11011 October 1978 Objects to Issuance of SNM License to Duke Power Co for Transport of Nuclear Waste Matl from Oconee to Mcguire. Situation Creates Unacceptable Hazard to Residents Due to Inadequate Storage Facilities ML20147D1931978-10-0202 October 1978 NRC Will Respond to First Set of Interrogs on Informal Basis This Week Even Though Carolina Environ Study Group Has Not Yet Been Admitted as a Party to the Spent Fuel Storage Proceeding ML20147D2831978-10-0202 October 1978 Reports NRC Staff Will Consider Comments Made by Carolina Environ Study Group in at Special pre-hearing Conference for 781024 ML20148K8421978-09-23023 September 1978 Requests a Limited Hearing Re Subj Facil.Opposes Granting of Lic.W/Encl Newspaper Article Re Dykes' Attempt to Stop Approval of Lic for Subj Facil ML20148A8271978-09-19019 September 1978 Requests That NRC Supply Each Intervenor W/Copy of Util Application for Amend to SNM License for Spent Fuel Transportation & Storage & All Related Correspondence. Advance Notice of All Meetings & Insp Repts Requested ML20149H3071978-08-0202 August 1978 Forwards Schedule Used by NRC to Insure Timely Review Process.Dates Shown Reflect Best Practical Estimate Which Can Be Made at This Time.Date of Completion & Final Decision on Licensing Action Will Depend on Result of Hearings Held ML20149H8721978-07-21021 July 1978 Forwards Request for Addl Info Re Application for Amend to License SNM-1773 Re Storage of Oconee Spent Fuel at McGuire Facility.Response Requested within 30 Days of Receipt of Ltr ML20149H1011978-05-19019 May 1978 Forwards Request for Addl Info Re Application for Amend to License SNM-1773,including Licensing of Spent Fuel Pool as Isfsi.Meeting W/Util Requested to Resolve Matter.Response to Encl Questions Needed by 780605 ML20147B9001978-04-19019 April 1978 Confirms 780418 Conversation Re Site Visit on 780425-27 by NRC & Contractor Personnel.Areas of Interest to Be Reviewed for Both McGuire & Oconee Sites Are Listed 1982-08-03
[Table view] Category:NRC TO STATE/LOCAL GOVERNMENT
MONTHYEARML20150D4091978-11-0909 November 1978 Forwards List of Documents Filed W/Atomic Safety & Licensing Bd in Proc Dealing W/Amend of Matl Lic SNM-1773 ML20149H3071978-08-0202 August 1978 Forwards Schedule Used by NRC to Insure Timely Review Process.Dates Shown Reflect Best Practical Estimate Which Can Be Made at This Time.Date of Completion & Final Decision on Licensing Action Will Depend on Result of Hearings Held ML20149H1011978-05-19019 May 1978 Forwards Request for Addl Info Re Application for Amend to License SNM-1773,including Licensing of Spent Fuel Pool as Isfsi.Meeting W/Util Requested to Resolve Matter.Response to Encl Questions Needed by 780605 1978-08-02
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20062H1911982-08-0303 August 1982 Notifies That Apr 1982 Revision 6 to Spent Fuel Transportation Plan Meets Requirements of 10CFR73.37 & Is Approved.Revised Plan Contains Safeguards Info Which Should Be Withheld (Ref 10CFR73.21) ML20148D2261980-07-11011 July 1980 Responds to Util 800417,28 & 0702 Ltrs Re Physical Protection of Irradiated Reactor Fuel in Transit.Approves Revision 3 to Spent Fuel Transportation Plan ML20126C0591980-03-0404 March 1980 Notifies That Requirement Contained in NRC 790803 & 15 Ltrs Re Withholding Identification of Specific Approved Spent Fuel Routes Is Rescinded.Commission 800229 Order in Response to NRC Petition,Reversed Previous Policy ML20147C8011978-11-30030 November 1978 Confirms Staff'S Request for an Extension of Time to Respond to Interrogs by Carolina Environ Study Grp Propounded 781115 & Request to Produce Served by Cesg on 781116.Staff Responses Will Be Provided by 781229 ML20150E3131978-11-21021 November 1978 Responds to Re Concern About DPC Proposal to Transport Spent Nuc Fuel from Oconee Nuc Facil Located in Sc for Storage in Spent Fuel Pool at McGuire Nuc Facil, Charlotte,Nc.Issue Will Be Heard Before ASLB ML20153B0471978-11-13013 November 1978 Names of Petitioners Intervening Have Been Placed on Svc List to Receive Copies of Documents Routinely Sent to Pdr. Also Lists & Forwards Documents Sent to PDR Prior to Initiation of Automatic Svc ML20150D4091978-11-0909 November 1978 Forwards List of Documents Filed W/Atomic Safety & Licensing Bd in Proc Dealing W/Amend of Matl Lic SNM-1773 ML20148C0381978-10-19019 October 1978 Responds to 780919 Request for Addl Info Re Licensing Action.Nrc Info Practices Must Be Met.Notification of All Meetings Will Be Sent ML20148K2451978-10-12012 October 1978 Requests Addl Info Re Dpc'S Eval of Alternatives to Transp Oconee Spent Fuel to McGuire Site,Specifically on Increase of Storage Capacity at Existing Oconee Basins,Needed for Review of Appl for Amend of Special Nuc Matl Lic SNM-1773 ML20147D1931978-10-0202 October 1978 NRC Will Respond to First Set of Interrogs on Informal Basis This Week Even Though Carolina Environ Study Group Has Not Yet Been Admitted as a Party to the Spent Fuel Storage Proceeding ML20149H3071978-08-0202 August 1978 Forwards Schedule Used by NRC to Insure Timely Review Process.Dates Shown Reflect Best Practical Estimate Which Can Be Made at This Time.Date of Completion & Final Decision on Licensing Action Will Depend on Result of Hearings Held ML20149H8721978-07-21021 July 1978 Forwards Request for Addl Info Re Application for Amend to License SNM-1773 Re Storage of Oconee Spent Fuel at McGuire Facility.Response Requested within 30 Days of Receipt of Ltr ML20149H1011978-05-19019 May 1978 Forwards Request for Addl Info Re Application for Amend to License SNM-1773,including Licensing of Spent Fuel Pool as Isfsi.Meeting W/Util Requested to Resolve Matter.Response to Encl Questions Needed by 780605 ML20147B9001978-04-19019 April 1978 Confirms 780418 Conversation Re Site Visit on 780425-27 by NRC & Contractor Personnel.Areas of Interest to Be Reviewed for Both McGuire & Oconee Sites Are Listed 1982-08-03
[Table view] |
Text
h w 671*; , . /X 1 ~ ~ GE7*~' ; 'Y ~
C' .
O~
. ~m 8+ ( q.
,s Distribution: ._
Docket File -
NMSS:R/F
__ MAY I S 1978 FCRR:R/F PDR Docket No. 70-2623 JBMartin LPDR,Walhalla,5C.
RWStarostecki JPRoberts .-
JShafer /
Mr. William L. Parker /RRirkel Vice. President ~0 Lynch "Steam Production Department BSSpitalny Power Building 422 South Church Street Charlotte, N. C. 20242
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION
Dear Mr. Parker:
Your application for Anendment to License S!N-1773 has been received -
and docketed 'iarch 30, 1978 by the Office of Nuclear Material Safety and Safeguards (f'f'SS).
The infomation available as a result of the ongoing 10 CFR Part 50 review is adequate for us to proceed with the environmental and safety reviews. However, there are a ntenber of issues with respect to licensing the McGuire spent fuel pool in accordance with 10 CFR Part 70 as an independent spent fuel storage installation (ISFSI) that require clarification or additional infomation to enable us to proceed with the review. As a result of the recent site visit by the staff, questions were also raised. The additional infomation required is identified in the attached enclosure.
As a result of our review to date, we have identified one item which is of concern to us and which we believe warrants resolution at the earliest possible tine. L'o do not see the need to transport, as proposed,120-day spent fuel frm the Oconec site in victs of the availability of older spent fuel. It is our position at this tir:e that the scope of our review will be directly affected by the age of the spent fuel to be shipped and stcred at the McGuire site. '
_ Therefore, ve would like a meeting with you to resolve this question as soon as possible so that we may proceed with the safety and environ-cental reviews. On May 15, 1978, Brett Spitalny, a member of our staff, discussed with Greg Pollak the need for such a meeting in reference to this matter.
Sme of the enclosed questions will no longer be pertinent if a decision on this matter is reached prior to the sutraittal of answers.
8802190110100519 PDR ADOCK 07002623 C y PDR OFFIC E P
.w a ss a ns t >
D4? 8 h . . . . _ . ..,
Nec tonu ne o.ui uncu ono
- vi....va. . m ... m .D,,,es. .n - ,J
y . , n- , '7~~r.wz~y7-~ m~ - ?m-~?. y~ -~;- i S -,-~ 3-:--- . ,
v; e - .
Mr. William L. Parker In order to proceed expeditiously, we are requesting responses to each of the enclosed requests by June 5, 1978. To assist your staff in this matter, we have previously discussed our concerns on these topics at the site visit. If you have any difficulty meeting this schedule, please contact Brett Spitalny, the NRC project manager, at 301-427-4205.
Sincerely, a w Origia11 Signed by Richard hald Richard W. Starosteckt. Chief Fuel Reprocessing and Recycle Branch Division of Fuel Cycle and Material SaFoty
Enclosure:
Additional Infomation Required Y Y
~
......- :vCaa r&a
..u.,, BSSpi.ta.inylal l JPRoberts.. 3WStarostecki
.m _.5/)8/78 S//4/78 ___5/}6/.78 _
ne ronx m am not eno h ....... ...u.m.........i.,... .
4 ADDITIONAL INFORMATION REQUIRED
- 1) Supply calcul .erienced dose rates ;manating from the cask for th. conditions:
a) sid fuel b) 1 year old fuel Explain method used for detenuining given values.
- 2) Furnish Oconee spent fuel source terms. Include method used for i obtaining values of isotopes and minimum value cut-off point, if used. Also include such longer-lived isotopes as 1129, or justifi-cation for exclusion.
Supply values for both 120 day old and 1 year old fuel.
- 3) Supply the projected manpower schedule required for the completion of construction at the McGuire site. Provide an estimate of individual and total doses that might be received by construction and contractor employees. Also distinguish between any work areas contiguous to the route of ingress of the truck and cask, or adjacent to the fuel storage pool which may be frequented by construction workers and l consequently cause an exposure of greater than background doses.
- 4) Furnish exact road mileage for each leg of the proposed route to be driven between the Oconee Nuclear Station and the McGuire Nuclear Station.
1 1
- 5) Supply activity levels experienced in the Oconee spent fuel pools in addition to revising Table 8.1 of the application to reflect values for assuming a 1 year decay period prior to shipping to the McGuire pool.
- 6) Loss of electrical power is a site-safety-related condition of potentially serious consequences. Ancillary systes for safety and security should provide continuous instrument lighting, alarm, and ventilation control power.
Section 5.3 of the application discusses the fact that the Unit I diesel generators will be available, however only in a manual mode.
It is not a requirement for the diesel generators to be operational in the automatic mode, however, if this is not the case, one of two other alternatives exist:
a) For storing spent fuel (120 days old), it is necessary to justify that in the case of a loss-of-power..the diesel generators may be manually started, and must supply power to the necessary systems within 30 minutes. In addition, calculations for heat-up rate of the spent fuel pool must be included, b) For storing aged spent fuel (minimum 1 year), a separate justification is not required.
e
- 6) (Continued)
Furnish the necessary justifications required if your intentions are to store 120 day old fuel.
- 7) Describe the alternatives that have been considered for the shipment l of older fuel. The retention of a full core reserve on site is a contingency action, and not a safety requirement. Considering, for example, that the entire full core reserve was maintained in Oconee spent fuel Pool # 3, we believe that there would not be a need for transfer of 120-day spent fuel. For the period of one year, consider the shipment of older fuel from Pool #3, and discherge from units 1 and 2, in October '78 and December '78 respectively, into pool 1 and 2. At the end of one year, explain why there would not be enough aged fuel in Pool 1 and 2 to ship from that location.
- 8) Provide the required information used to calculate heat load for spent fuel as furnished on Page 16-1 of the application. NRC Branch Technical Position ASB 9-2 requires such variables as fraction of operating power, cumulative reactor operating time, '
and time after shutdown. In addition, supply one same infor-mation and the calculated heat-load for a "worst case condition" for fuel which has decayed for a period of one year.
- 9) The system review for the solidification of liquid radioactive waste for the 10 CFR Part 50 Safety Evaluation Report is a polymer and catalyst processing system. It is our understanding that this system is not operational at this time. Although the spent fuel pool contri-butes a small portion of the site's liquid radioactive waste and may be stored for a period of time, it is necessary to maintain a method of solidifying waste.
If this system is not operational prior to the proposed date for shipping fuel, describe what intentions you have for solidifying waste.
\