Amend to Application for Ol,Consisting of Amend 55 to FSAR Including Previously Submitted Responses Re Loose Parts Monitoring Sys,Nrc Licensing Review Open Items,Code Cases & Generic Ltr 83-28
ML20133B469
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 07/26/1985
From: Johnson W
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To: Knighton G
Office of Nuclear Reactor Regulation
Shared Package
ML20133B474 List:
References
AOLL-850726, GL-83-28, SBN-845, NUDOCS 8508060184
Download: ML20133B469 (2)


Text

F

  • ) (" IN j

(p_

Wendell P. Johnson Vice President Pub 5c Service of New Hampshire July 26, 1985 New Hampshire Yankee Division SBN-845 T.F. B7.1.3 United States Nuclear Regulatory Commission Washington, D. C. 20555 Attention:

Mr. George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing

References:

(a)

Construction Permits CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444 (b) USNRC Letter, dated September 30, 1981, " Acceptance Review of Application for Operating Licenses for Seabrook Station Units 1 and 2," D. G. Eisenhut to W. C. Tallman (c) PSNH Letter SBN-778, dated March 12, 1985, " Amendment 54 to March 30, 1973, Application to Construct and Operate Seabrook Station Units 1 and 2," W. P. Johnson to G. W. Knighton

Subject:

Amendment 55 to March 30, 1973, Application to Construct and Operate Seabrook Station Unit 1 and Unit 2

Dear Sir:

We have enclosed 60 copies of Amendment 55 to the March 30, 1973 Application to Construct and Operate Seabrook Station Unit 1 and Unit 2.

The FSAR revisions contained in Amendment 55 result from the following:

Responses which were previously submitted regarding loose parts o

Monitoring System, hTC licensing review open items, code cases and Generic Letter 83-28.

M Revision to Chapter 13 regarding licensed operator requalification o

training.

o Change of RCCA absorbe' naterial to only Ag-In-Cd.

Downgrading of RGWS to NNS as allowed by Regulatory Guide 1.143 and o

ANSI /ANS-51.1.

Incorporation of RAI responses in whole or partially into the main o

body of the FSAR to enhance information contained in the FSAR.

8500060184 850726 3 DR ADOCK 050 P.O. Box 300 Seabrook NHO3874. Telephone (603)474-9521

Unit'ed St4tes Nuclear Regulatory Commission July 26, 1985 Attention:

Mr. George W. Knighton Page 2 o

Extensive revisions to the Radiological Emergency Plan (note:

because of extensive revisions, this document is being reissued in total).

o Miscellaneous and minor editorial changes.

Within 10 days, Amendment 55 will be distributed by prepaid delivery service to the recipients of the FSAR, which were specified in Reference (b).

Very truly yours, D

Johnson @

W. P Vice President WJD/ cmc Enclosures cc: Atomic Safety and Licensing Board Service List STATE OF NEW HAMPSHIRE

)

)ss ROCKINGHAM COUNTY

)

Then personally appeared before me, W. P. Johnson, who, being duly sworn, did state that he is a Vice President of Public Service Company of New Hampshire, that he is duly authorized to execute and file the foregoing request in the name and on the behalf of Public Service Company of New Hampshire and that the statements therein are true to the best of his knowledge and belief.

L ?, StWau Beverly E. c$$110way (Notary Public My Commission Expires March 6, 1990