ML20133B469
ML20133B469 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 07/26/1985 |
From: | Johnson W PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
To: | Knighton G Office of Nuclear Reactor Regulation |
Shared Package | |
ML20133B474 | List: |
References | |
AOLL-850726, GL-83-28, SBN-845, NUDOCS 8508060184 | |
Download: ML20133B469 (2) | |
Similar Documents at Seabrook | |
---|---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20196G3531999-06-23023 June 1999
[Table view]LAR 99-19 for License NPF-86,increasing AOT for Cracs from 30 Days to 60 Days on One Time Basis for Each Train to Facilitate on-line Implementation of Design Enhancements During Current Operating Cycle ML20207J6201999-03-15015 March 1999 Application for Amends to Licenses NPF-49 & NPF-86, Transferring Control of Licenses to Reflect Change in Upstream Economic Ownership of Parent Company of Nep,Vols I & Ii.Pages 48,49 & Annual Rept 1996 Pages 2 & 3 Omitted ML20207G9261999-03-0505 March 1999 Suppl Application for Transfer of License NPF-86,requesting Consent for Transfer of Montaup Electric Co Interest in OL for Seabrook Station to Little Bay Power Corp ML20198E7291998-12-16016 December 1998 Application for Amend to License NPF-86.Amend Involves Relocation of TS 3/4.7.10 & Associated TS Table 3.7-3 to Technical Requirements Manual ML20198E7781998-12-16016 December 1998 License Amend Request 98-09 to License NPF-86,either Revising Refs & Statements That Are Inaccurate or Providing Relief from Administrative Controls Which Provide Insignificant Safety Benefit ML20155J1671998-11-0404 November 1998 LAR 98-17 to License NPF-86,revising TS SR 4.5.2b.1 to Remove Prescriptive Requirements of Using Venting Process as Sole Means to Verify That ECCS Piping Is Full of Water ML20154F9971998-09-29029 September 1998 Application 98-16 for Amend to License NPF-86,reflecting Removal of Montaup Electric Co & Addition of Little Bay Power Corp ML20249B4161998-06-17017 June 1998 Revised LAR 98-07,reflecting Proposed Changes in LAR 98-07 W/Recently Issued License Amend 56 Which Split TS 3/4.7.6 Into Separate TSs,3/4.7.6.1 & 3/4.7.6.2 ML20247R6821998-05-20020 May 1998 LAR 97-07 to License NPF-86,revising Refueling Water Storage Tank low-low Level Setpoint ML20217E8611998-04-22022 April 1998 LAR 98-04 to License NPF-86,changing TS Surveillance Intervals to Accommodate 24 Month Fuel Cycle,Per GL 91-04 ML20216C5751998-04-0808 April 1998 Application 98-03 for Amend to License NPF-86,changing TS Surveillance Intervals to Accommodate 24-month Fuel Cycle, Per GL 91-04 ML20217Q2761998-04-0303 April 1998 Application for Amend to License NPF-86,LAR 98-02,proposing Changes to TS to Accomodate Fuel Cycles of Up to 24 Months, Per GL 91-04, Changes in TS Surveillance Intervals to Accommodate 24-Month Fuel Cycle ML20217M3671998-03-27027 March 1998 LAR 98-07 to License NPF-86,modifying Tech Specs 3.7.6, Control Room Emergency Makeup Air & Filtration Subsystem ML20217F0931998-03-23023 March 1998 Application for Amend to License NPF-86,proposing Administrative Change to TS to Incorporate Administrative Controls of New Specification 3.0.5,currently Approved for Use in NUREG-1431 ML20217Q0971998-03-0505 March 1998 Application for Amend to License NPF-86,incorporating Programmatic Controls in TS for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20217N7231998-03-0202 March 1998 Application for Amend to License NPF-86,changing TS to Revise Frequency for Performance of Specific Surveillances & Delete Requirements for Accelerated Testing When Number of Valid Test Failures Associated W/Edgs Is Met or Exceeded ML20217N8151998-03-0202 March 1998 Application for Amend to License NPF-86,changing TS to Exclude Prescriptive Requirement to Vent Operating CVCS CCP Casing ML20211E9761997-09-26026 September 1997 Application for Amend (LAR 97-05),changing TS 3.7.6 by Separating Requirements for Control Room HVAC Sys Re Operation of Control Room Emergency Makeup Air & Filtration Sys Subsystem & Control Room Air Conditioning Subsys ML20141B3521997-06-19019 June 1997 License Amend Request 97-03 to License,Revising TS Administrative Control 6.8.1.6.b to Include Ref to NRC Approved W Topical Rept WCAP-12610-P-A, Vantage + Fuel Assembly Ref Core Rept ML20148F9971997-05-29029 May 1997 License Amend Request 97-02,to License NPF-86,replacing Term Zircaloy W/Terminology That Identifies NRC Approved Westinghouse Fuel Assembly Design Consisting of Assemblies W/Either ZIRLO or Zircaloy-4 Fuel Cladding Matl ML20134Q3291997-02-18018 February 1997 Application for Amend to License NPF-86,changing Reactor Core Fuel Assembly Design Features Requirements Contained in Tech Specs 5.3.1, Fuel Assemblies ML20134L8591997-02-12012 February 1997 Application for Amend to License NPF-86,requesting Rev to TS Section 6.0 Re Administrative Controls ML20129B8211996-10-17017 October 1996 Application for Amend to License NPF-86,consisting of Change Request 96-02,proposing Changes That Involve Relocation of Four TS Re Instrumentation Requirements Contained in TS Section 3/4.3 ML20129B7631996-10-16016 October 1996 Application for Amend to License NPF-86,consisting of Change Request 96-06,proposing Four Changes Re EDG Requirements Contained in TS 3/4.8.1, AC Sources ML20113B1911996-06-20020 June 1996 License Amend Request 96-17 to License NPF-86,increasing Allowed Outage Time for Inoperable Svc Water Cooling Tower Loop Electrical Supply to Be Equivalent to Allowed Outage Time for Inoperable Svc Water Cooling Tower Loop ML20117K3051996-06-0404 June 1996 Application for Amend to License NPF-86,implementing Performance Based Containment Leak Rate Testing Program at Seabrook Station by Changing Tss.Request Submitted IAW 10CFR50,App J,Option B & Reg Guide 1.163 Requirements ML20092M1011995-09-22022 September 1995 Application for Amend to License NPF-86,consisting of LAR 95-07 Re Automatic Switchover to Containment Sump/Rwst Level low-low ML20098A4711995-09-20020 September 1995 Application for Amend to License NPF-86,relocating Functional Unit 6.b, FW Isolation- Low RCS T Avg Coincident W/Rt from TS 3.3.2 to Plant TS Requirements Manual Licensee Controlled Document ML20092K2091995-09-20020 September 1995 Application for Amend to License NPF-86,changing TS 3/4.9.1 Re Refueling Boron Concentration (Ref NUREG-1431) ML20092F9141995-09-12012 September 1995 Application for Amend to License NPF-86,TS Bases for RCS Safety Valves Bases Section 3/4.4.2 Were Made to Clarify What Specifically Constitutes Operable Pressurizer Safety Valve in Mode 5 ML20092A6251995-09-0505 September 1995 Application for Amend to License NPF-86,revising Main Steam Safety Valve Setpoints & Max Allowable Power Range Neutron Flux High Setpoints W/Inoperable Main Steam Safety Valves ML20086R2091995-07-24024 July 1995 LAR 95-03 to License NPF-86,relocating Table 3.4-1, RCS PIVs from TS 3.4.6.2, RCS Operational Leakage to Technical Requirements Manual ML20085L1101995-06-16016 June 1995 Application for Amend to License NPF-86.Amend Would Increase Requirements for Core Reactivity Control Available from Borated Water Sources ML20084U5391995-06-0707 June 1995 Application for Amend to License NPF-86,consisting of Amend Request 95-02,revising Footnote to SR 4.4.7 & Table 3.4-2 to Increase Temp Limit at Which Rc O Levels Determined by Sampling from 180 Degrees F to 250 Degrees F ML20084N9501995-05-30030 May 1995 Application for Amend to License NPF-86.Amend Will Allow Operation of Core W/Positive Moderator Temp Coefficient ML20082L5001995-04-17017 April 1995 Application for Amend to License NPF-86,revising TS 3.9.4 That Addresses Containment Bldg Penetrations to Allow Use of Alternate Containment Bldg Penetration Closure Methodologies for Postulated Accident Scenarios During Core Alterations ML20078E0351995-01-25025 January 1995 Application for Amend to License NPF-86,to Revise Surveillance Requirement 4.6.1.2.a from Specific Schedule for Performance of Containment ILRTs ML20076G2691994-10-0707 October 1994 License Amend Request 94-03 to License NPF-86,modifying TS Administrative Control Requirements for Emergency & Security Plans,Per GL 93-07 ML20059H6321994-01-14014 January 1994 LAR 93-20 to License NPF-86,changing Administrative Controls in TS Section 6.0 to Redefine Composition of Sorc,Create Station Qualified Reviewer Program,Delete Requirement to Perform Periodic Procedure Reviews & Revise TS 6.4.2.9 ML20058C2991993-11-23023 November 1993 LAR 93-18 to License NPF-86,allowing Operation of Core within Axial Flux Difference Band Expanded from Current Band in TSs & Improved Fuel Cycle Mgt Through Implementation of Core Design Enhancements ML20059C5191993-10-28028 October 1993 LAR 93-14 to License NPF-86,changing TS to Implement 13 Line Item Improvements Recommended by GL 93-05, Line-Item TS Improvements to Reduce SRs for Testing During Power Operation ML20057F2981993-10-0404 October 1993 Application for Amend to License NPF-86,proposing Changes to TS Correcting Inconsistency within TS by Deleting Requirement to Verify EDG Speed ML20056F7641993-08-26026 August 1993 LAR Requesting Exercise of Enforcement Discretion from Requirement to Perform Channel Check on Narrow Range RWST low-low Level Transmitters ML20045C5541993-06-18018 June 1993 LAR 93-08 to License NPF-86,changing Title of TS 6.2.3 to Independent Technical Reviews & Deleting Requirement to Maintain Five Person Organization,Iseg ML20045D5831993-06-18018 June 1993 LAR Proposing Changes to Seabrook Station Tech Specs to Reduce Frequency of Surveillances Which Are Required to Verify Integrity of CST Enclosure ML20127F8071993-01-13013 January 1993 License Amend Request 92-015 to License NPF-86,changing TS 6.8.1.4, Semiannual Radioactive Effluent Release Rept, to Change Submittal Frequency from Semiannually to Annually ML20117A7941992-11-25025 November 1992 License Amend Request 92-14 to License NPF-86,revising TS to Allow Fixed Incore Detectors to Be Used as Independent Sys to Perform TS Surveillances ML20106E4151992-11-0303 November 1992 Application for Amend to License NPF-86,consisting of License Amend Request 92-04,changing TS to Revise Current Requirement That Operations Manager Hold Senior Reactor Operator License ML20115J4301992-10-22022 October 1992 License Amend Request 92-12 to License NPF-86,changing TS to Correct Acceptance Value for Sum of RHR Sys Injection Line Flow Rates ML20118B9391992-09-30030 September 1992 License Amend Request 92-13 to License NPF-86,increasing TS Temp Limit for Cooling Tower Basin Water from 67.3 F to 70 F & Permitting Cooling Tower Sprays & Fans to Be Manually Operated Following Cooling Tower Actuation 1999-06-23 Category:OPERATING LICENSES-APPLICATION FOR & AMENDMENTS MONTHYEARML20212A8031986-07-22022 July 1986
[Table view]Suppl 3 to Amend 57 to 730330 Application for License & Request for Partial Transfer of CPPR-135 & CPPR-136. Certificate of Svc Encl ML20210H5101986-03-26026 March 1986 Amend 57 to 730330 Application for Ols,Documenting Partial Transfer of CPPR-135 & CPPR-136 Ownership Interests to Eua Power Corp.Related Info,Including Certificate of Svc, Agreement for Joint Ownership & Target Budget Encl ML20133B4691985-07-26026 July 1985 Amend to Application for Ol,Consisting of Amend 55 to FSAR Including Previously Submitted Responses Re Loose Parts Monitoring Sys,Nrc Licensing Review Open Items,Code Cases & Generic Ltr 83-28 ML20081A2571983-10-0303 October 1983 Amend 51 to Application for OL Transferring 0.41259% Ownership Share from Vermont Electric Cooperative,Inc to Vermont Electric Generation & Transmission Cooperative,Inc ML20076K9341983-09-0808 September 1983 Application for Amend 50 to CPPR-135 & CPPR-136 & OL Applications,Consisting of Amend 50 to FSAR ML20071A8251983-02-18018 February 1983 Amend 48 to Application for Ols,Incorporating Responses/ Revised Responses to NRC Request for Addl Info,Responses to NRC Licensing Review Open Items & Miscellaneous & Minor Editorial Revs ML20039B7261981-12-15015 December 1981 Suppl 1 to Amend 42 to Application for Ol.Further Partial Transfer for CPs from CN Light & Power Co to Wa Electric Cooperative,Inc Requested.Certificate of Svc & Requested Addl Supporting Info Encl ML19347F4391981-05-0808 May 1981 Amend 42 to Application for Ol,Transferring Entire Ownership Share of Comm Ed to Affiliate,Canal Electric Co. Supporting Documentation Encl ML19343A6501980-11-10010 November 1980 Amend 41 to Application for OL Requesting Partial Transfer of Ownership from CT Light & Power Co to Fitchburg Gas & Electric Light Co.Certificate of Svc & Applicant General Info Encl ML19323C5371980-05-13013 May 1980 Addl Financial Info Re Amend 40,Suppl 5 to Request Partial Transfer of Cps.Forwards Annual Financial Rept 1979. ML19309F8801980-04-24024 April 1980 Amend 40,Suppl 5 to 730330 Application for Ol,Requesting Partial Transfer of CPPR-135 & CPPR-136.Responses to NRC 800402 Requests for Addl Financial Info & Certificate of Svc Attached ML19309B8881980-03-31031 March 1980 Revised Source of Funds Schedule,Omitted from Suppl 4,Amend 40 of OL Application for Partial Transfer of CPs ML19322E1391980-03-14014 March 1980 Suppl 4 Amend 40 of OL Application for Partial Transfer of Cps.Includes Amend 39 & 40,filed 780501 & 790514, Respectively 1986-07-22 Category:TEXT-LICENSE APPLICATIONS & PERMITS MONTHYEARML20196G3531999-06-23023 June 1999
[Table view]LAR 99-19 for License NPF-86,increasing AOT for Cracs from 30 Days to 60 Days on One Time Basis for Each Train to Facilitate on-line Implementation of Design Enhancements During Current Operating Cycle ML20207J6201999-03-15015 March 1999 Application for Amends to Licenses NPF-49 & NPF-86, Transferring Control of Licenses to Reflect Change in Upstream Economic Ownership of Parent Company of Nep,Vols I & Ii.Pages 48,49 & Annual Rept 1996 Pages 2 & 3 Omitted ML20207G9261999-03-0505 March 1999 Suppl Application for Transfer of License NPF-86,requesting Consent for Transfer of Montaup Electric Co Interest in OL for Seabrook Station to Little Bay Power Corp ML20198E7291998-12-16016 December 1998 Application for Amend to License NPF-86.Amend Involves Relocation of TS 3/4.7.10 & Associated TS Table 3.7-3 to Technical Requirements Manual ML20198E7781998-12-16016 December 1998 License Amend Request 98-09 to License NPF-86,either Revising Refs & Statements That Are Inaccurate or Providing Relief from Administrative Controls Which Provide Insignificant Safety Benefit ML20155J1671998-11-0404 November 1998 LAR 98-17 to License NPF-86,revising TS SR 4.5.2b.1 to Remove Prescriptive Requirements of Using Venting Process as Sole Means to Verify That ECCS Piping Is Full of Water ML20154F9971998-09-29029 September 1998 Application 98-16 for Amend to License NPF-86,reflecting Removal of Montaup Electric Co & Addition of Little Bay Power Corp ML20249B4161998-06-17017 June 1998 Revised LAR 98-07,reflecting Proposed Changes in LAR 98-07 W/Recently Issued License Amend 56 Which Split TS 3/4.7.6 Into Separate TSs,3/4.7.6.1 & 3/4.7.6.2 ML20247R6821998-05-20020 May 1998 LAR 97-07 to License NPF-86,revising Refueling Water Storage Tank low-low Level Setpoint ML20217E8611998-04-22022 April 1998 LAR 98-04 to License NPF-86,changing TS Surveillance Intervals to Accommodate 24 Month Fuel Cycle,Per GL 91-04 ML20216C5751998-04-0808 April 1998 Application 98-03 for Amend to License NPF-86,changing TS Surveillance Intervals to Accommodate 24-month Fuel Cycle, Per GL 91-04 ML20217Q2761998-04-0303 April 1998 Application for Amend to License NPF-86,LAR 98-02,proposing Changes to TS to Accomodate Fuel Cycles of Up to 24 Months, Per GL 91-04, Changes in TS Surveillance Intervals to Accommodate 24-Month Fuel Cycle ML20217M3671998-03-27027 March 1998 LAR 98-07 to License NPF-86,modifying Tech Specs 3.7.6, Control Room Emergency Makeup Air & Filtration Subsystem ML20217F0931998-03-23023 March 1998 Application for Amend to License NPF-86,proposing Administrative Change to TS to Incorporate Administrative Controls of New Specification 3.0.5,currently Approved for Use in NUREG-1431 ML20217Q0971998-03-0505 March 1998 Application for Amend to License NPF-86,incorporating Programmatic Controls in TS for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20217N8151998-03-0202 March 1998 Application for Amend to License NPF-86,changing TS to Exclude Prescriptive Requirement to Vent Operating CVCS CCP Casing ML20217N7231998-03-0202 March 1998 Application for Amend to License NPF-86,changing TS to Revise Frequency for Performance of Specific Surveillances & Delete Requirements for Accelerated Testing When Number of Valid Test Failures Associated W/Edgs Is Met or Exceeded ML20211E9761997-09-26026 September 1997 Application for Amend (LAR 97-05),changing TS 3.7.6 by Separating Requirements for Control Room HVAC Sys Re Operation of Control Room Emergency Makeup Air & Filtration Sys Subsystem & Control Room Air Conditioning Subsys ML20141B3521997-06-19019 June 1997 License Amend Request 97-03 to License,Revising TS Administrative Control 6.8.1.6.b to Include Ref to NRC Approved W Topical Rept WCAP-12610-P-A, Vantage + Fuel Assembly Ref Core Rept ML20148F9971997-05-29029 May 1997 License Amend Request 97-02,to License NPF-86,replacing Term Zircaloy W/Terminology That Identifies NRC Approved Westinghouse Fuel Assembly Design Consisting of Assemblies W/Either ZIRLO or Zircaloy-4 Fuel Cladding Matl ML20134Q3291997-02-18018 February 1997 Application for Amend to License NPF-86,changing Reactor Core Fuel Assembly Design Features Requirements Contained in Tech Specs 5.3.1, Fuel Assemblies ML20134L8591997-02-12012 February 1997 Application for Amend to License NPF-86,requesting Rev to TS Section 6.0 Re Administrative Controls ML20129B8211996-10-17017 October 1996 Application for Amend to License NPF-86,consisting of Change Request 96-02,proposing Changes That Involve Relocation of Four TS Re Instrumentation Requirements Contained in TS Section 3/4.3 ML20129B7631996-10-16016 October 1996 Application for Amend to License NPF-86,consisting of Change Request 96-06,proposing Four Changes Re EDG Requirements Contained in TS 3/4.8.1, AC Sources ML20113B1911996-06-20020 June 1996 License Amend Request 96-17 to License NPF-86,increasing Allowed Outage Time for Inoperable Svc Water Cooling Tower Loop Electrical Supply to Be Equivalent to Allowed Outage Time for Inoperable Svc Water Cooling Tower Loop ML20117K3051996-06-0404 June 1996 Application for Amend to License NPF-86,implementing Performance Based Containment Leak Rate Testing Program at Seabrook Station by Changing Tss.Request Submitted IAW 10CFR50,App J,Option B & Reg Guide 1.163 Requirements ML20092M1011995-09-22022 September 1995 Application for Amend to License NPF-86,consisting of LAR 95-07 Re Automatic Switchover to Containment Sump/Rwst Level low-low ML20092K2091995-09-20020 September 1995 Application for Amend to License NPF-86,changing TS 3/4.9.1 Re Refueling Boron Concentration (Ref NUREG-1431) ML20098A4711995-09-20020 September 1995 Application for Amend to License NPF-86,relocating Functional Unit 6.b, FW Isolation- Low RCS T Avg Coincident W/Rt from TS 3.3.2 to Plant TS Requirements Manual Licensee Controlled Document ML20092F9141995-09-12012 September 1995 Application for Amend to License NPF-86,TS Bases for RCS Safety Valves Bases Section 3/4.4.2 Were Made to Clarify What Specifically Constitutes Operable Pressurizer Safety Valve in Mode 5 ML20092A6251995-09-0505 September 1995 Application for Amend to License NPF-86,revising Main Steam Safety Valve Setpoints & Max Allowable Power Range Neutron Flux High Setpoints W/Inoperable Main Steam Safety Valves ML20086R2091995-07-24024 July 1995 LAR 95-03 to License NPF-86,relocating Table 3.4-1, RCS PIVs from TS 3.4.6.2, RCS Operational Leakage to Technical Requirements Manual ML20085L1101995-06-16016 June 1995 Application for Amend to License NPF-86.Amend Would Increase Requirements for Core Reactivity Control Available from Borated Water Sources ML20084U5391995-06-0707 June 1995 Application for Amend to License NPF-86,consisting of Amend Request 95-02,revising Footnote to SR 4.4.7 & Table 3.4-2 to Increase Temp Limit at Which Rc O Levels Determined by Sampling from 180 Degrees F to 250 Degrees F ML20084N9501995-05-30030 May 1995 Application for Amend to License NPF-86.Amend Will Allow Operation of Core W/Positive Moderator Temp Coefficient ML20082L5001995-04-17017 April 1995 Application for Amend to License NPF-86,revising TS 3.9.4 That Addresses Containment Bldg Penetrations to Allow Use of Alternate Containment Bldg Penetration Closure Methodologies for Postulated Accident Scenarios During Core Alterations ML20078E0351995-01-25025 January 1995 Application for Amend to License NPF-86,to Revise Surveillance Requirement 4.6.1.2.a from Specific Schedule for Performance of Containment ILRTs ML20076G2691994-10-0707 October 1994 License Amend Request 94-03 to License NPF-86,modifying TS Administrative Control Requirements for Emergency & Security Plans,Per GL 93-07 ML20059H6321994-01-14014 January 1994 LAR 93-20 to License NPF-86,changing Administrative Controls in TS Section 6.0 to Redefine Composition of Sorc,Create Station Qualified Reviewer Program,Delete Requirement to Perform Periodic Procedure Reviews & Revise TS 6.4.2.9 ML20058C2991993-11-23023 November 1993 LAR 93-18 to License NPF-86,allowing Operation of Core within Axial Flux Difference Band Expanded from Current Band in TSs & Improved Fuel Cycle Mgt Through Implementation of Core Design Enhancements ML20059C5191993-10-28028 October 1993 LAR 93-14 to License NPF-86,changing TS to Implement 13 Line Item Improvements Recommended by GL 93-05, Line-Item TS Improvements to Reduce SRs for Testing During Power Operation ML20057F2981993-10-0404 October 1993 Application for Amend to License NPF-86,proposing Changes to TS Correcting Inconsistency within TS by Deleting Requirement to Verify EDG Speed ML20056F7641993-08-26026 August 1993 LAR Requesting Exercise of Enforcement Discretion from Requirement to Perform Channel Check on Narrow Range RWST low-low Level Transmitters ML20045C5541993-06-18018 June 1993 LAR 93-08 to License NPF-86,changing Title of TS 6.2.3 to Independent Technical Reviews & Deleting Requirement to Maintain Five Person Organization,Iseg ML20045D5831993-06-18018 June 1993 LAR Proposing Changes to Seabrook Station Tech Specs to Reduce Frequency of Surveillances Which Are Required to Verify Integrity of CST Enclosure ML20127F8071993-01-13013 January 1993 License Amend Request 92-015 to License NPF-86,changing TS 6.8.1.4, Semiannual Radioactive Effluent Release Rept, to Change Submittal Frequency from Semiannually to Annually ML20117A7941992-11-25025 November 1992 License Amend Request 92-14 to License NPF-86,revising TS to Allow Fixed Incore Detectors to Be Used as Independent Sys to Perform TS Surveillances ML20106E4151992-11-0303 November 1992 Application for Amend to License NPF-86,consisting of License Amend Request 92-04,changing TS to Revise Current Requirement That Operations Manager Hold Senior Reactor Operator License ML20115J4301992-10-22022 October 1992 License Amend Request 92-12 to License NPF-86,changing TS to Correct Acceptance Value for Sum of RHR Sys Injection Line Flow Rates ML20118B9391992-09-30030 September 1992 License Amend Request 92-13 to License NPF-86,increasing TS Temp Limit for Cooling Tower Basin Water from 67.3 F to 70 F & Permitting Cooling Tower Sprays & Fans to Be Manually Operated Following Cooling Tower Actuation 1999-06-23 |
Contents
Text
F
- ) ("jIN(p_ Wendell P. Johnson Vice President Pub 5c Service of New Hampshire July 26, 1985 New Hampshire Yankee Division SBN-845 T.F. B7.1.3 United States Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. George W. Knighton, Chief Licensing Branch No. 3 -
Division of Licensing
References:
(a) Construction Permits CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444 (b) USNRC Letter, dated September 30, 1981, " Acceptance Review of Application for Operating Licenses for Seabrook Station Units 1 and 2," D. G. Eisenhut to W. C. Tallman (c) PSNH Letter SBN-778, dated March 12, 1985, " Amendment 54 to March 30, 1973, Application to Construct and Operate Seabrook Station Units 1 and 2," W. P. Johnson to G. W. Knighton
Subject:
Amendment 55 to March 30, 1973, Application to Construct and Operate Seabrook Station Unit 1 and Unit 2
Dear Sir:
We have enclosed 60 copies of Amendment 55 to the March 30, 1973 Application to Construct and Operate Seabrook Station Unit 1 and Unit 2.
The FSAR revisions contained in Amendment 55 result from the following:
o Responses which were previously submitted regarding loose parts Monitoring System, hTC licensing review open items, code cases and Generic Letter 83-28. M o Revision to Chapter 13 regarding licensed operator requalification training.
o Change of RCCA absorbe' naterial to only Ag-In-Cd.
o Downgrading of RGWS to NNS as allowed by Regulatory Guide 1.143 and ANSI /ANS-51.1.
o Incorporation of RAI responses in whole or partially into the main body of the FSAR to enhance information contained in the FSAR.
8500060184 ADOCK 050 850726 3 DR P.O. Box 300 Seabrook NHO3874 . Telephone (603)474-9521
Unit'ed St4tes Nuclear Regulatory Commission July 26, 1985 Attention: Mr. George W. Knighton Page 2 o Extensive revisions to the Radiological Emergency Plan (note:
because of extensive revisions, this document is being reissued in total).
o Miscellaneous and minor editorial changes.
Within 10 days, Amendment 55 will be distributed by prepaid delivery service to the recipients of the FSAR, which were specified in Reference (b).
. Very truly yours, D
Johnson @
W. P Vice President WJD/ cmc Enclosures cc: Atomic Safety and Licensing Board Service List STATE OF NEW HAMPSHIRE )
)ss ROCKINGHAM COUNTY )
Then personally appeared before me, W. P. Johnson, who, being duly sworn, did state that he is a Vice President of Public Service Company of New Hampshire, that he is duly authorized to execute and file the foregoing request in the name and on the behalf of Public Service Company of New Hampshire and that the statements therein are true to the best of his knowledge and belief.
L ?, StWau Beverly E. c$$110way (Notary Public My Commission Expires March 6, 1990