MONTHYEARML20196G3531999-06-23023 June 1999 LAR 99-19 for License NPF-86,increasing AOT for Cracs from 30 Days to 60 Days on One Time Basis for Each Train to Facilitate on-line Implementation of Design Enhancements During Current Operating Cycle ML20207J6201999-03-15015 March 1999 Application for Amends to Licenses NPF-49 & NPF-86, Transferring Control of Licenses to Reflect Change in Upstream Economic Ownership of Parent Company of Nep,Vols I & Ii.Pages 48,49 & Annual Rept 1996 Pages 2 & 3 Omitted ML20207G9261999-03-0505 March 1999 Suppl Application for Transfer of License NPF-86,requesting Consent for Transfer of Montaup Electric Co Interest in OL for Seabrook Station to Little Bay Power Corp ML20198E7291998-12-16016 December 1998 Application for Amend to License NPF-86.Amend Involves Relocation of TS 3/4.7.10 & Associated TS Table 3.7-3 to Technical Requirements Manual ML20198E7781998-12-16016 December 1998 License Amend Request 98-09 to License NPF-86,either Revising Refs & Statements That Are Inaccurate or Providing Relief from Administrative Controls Which Provide Insignificant Safety Benefit ML20155J1671998-11-0404 November 1998 LAR 98-17 to License NPF-86,revising TS SR 4.5.2b.1 to Remove Prescriptive Requirements of Using Venting Process as Sole Means to Verify That ECCS Piping Is Full of Water ML20154F9971998-09-29029 September 1998 Application 98-16 for Amend to License NPF-86,reflecting Removal of Montaup Electric Co & Addition of Little Bay Power Corp ML20249B4161998-06-17017 June 1998 Revised LAR 98-07,reflecting Proposed Changes in LAR 98-07 W/Recently Issued License Amend 56 Which Split TS 3/4.7.6 Into Separate TSs,3/4.7.6.1 & 3/4.7.6.2 ML20247R6821998-05-20020 May 1998 LAR 97-07 to License NPF-86,revising Refueling Water Storage Tank low-low Level Setpoint ML20217E8611998-04-22022 April 1998 LAR 98-04 to License NPF-86,changing TS Surveillance Intervals to Accommodate 24 Month Fuel Cycle,Per GL 91-04 ML20216C5751998-04-0808 April 1998 Application 98-03 for Amend to License NPF-86,changing TS Surveillance Intervals to Accommodate 24-month Fuel Cycle, Per GL 91-04 ML20217Q2761998-04-0303 April 1998 Application for Amend to License NPF-86,LAR 98-02,proposing Changes to TS to Accomodate Fuel Cycles of Up to 24 Months, Per GL 91-04, Changes in TS Surveillance Intervals to Accommodate 24-Month Fuel Cycle ML20217M3671998-03-27027 March 1998 LAR 98-07 to License NPF-86,modifying Tech Specs 3.7.6, Control Room Emergency Makeup Air & Filtration Subsystem ML20217F0931998-03-23023 March 1998 Application for Amend to License NPF-86,proposing Administrative Change to TS to Incorporate Administrative Controls of New Specification 3.0.5,currently Approved for Use in NUREG-1431 ML20217Q0971998-03-0505 March 1998 Application for Amend to License NPF-86,incorporating Programmatic Controls in TS for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20217N7231998-03-0202 March 1998 Application for Amend to License NPF-86,changing TS to Revise Frequency for Performance of Specific Surveillances & Delete Requirements for Accelerated Testing When Number of Valid Test Failures Associated W/Edgs Is Met or Exceeded ML20217N8151998-03-0202 March 1998 Application for Amend to License NPF-86,changing TS to Exclude Prescriptive Requirement to Vent Operating CVCS CCP Casing ML20211E9761997-09-26026 September 1997 Application for Amend (LAR 97-05),changing TS 3.7.6 by Separating Requirements for Control Room HVAC Sys Re Operation of Control Room Emergency Makeup Air & Filtration Sys Subsystem & Control Room Air Conditioning Subsys ML20141B3521997-06-19019 June 1997 License Amend Request 97-03 to License,Revising TS Administrative Control 6.8.1.6.b to Include Ref to NRC Approved W Topical Rept WCAP-12610-P-A, Vantage + Fuel Assembly Ref Core Rept ML20148F9971997-05-29029 May 1997 License Amend Request 97-02,to License NPF-86,replacing Term Zircaloy W/Terminology That Identifies NRC Approved Westinghouse Fuel Assembly Design Consisting of Assemblies W/Either ZIRLO or Zircaloy-4 Fuel Cladding Matl ML20134Q3291997-02-18018 February 1997 Application for Amend to License NPF-86,changing Reactor Core Fuel Assembly Design Features Requirements Contained in Tech Specs 5.3.1, Fuel Assemblies ML20134L8591997-02-12012 February 1997 Application for Amend to License NPF-86,requesting Rev to TS Section 6.0 Re Administrative Controls ML20129B8211996-10-17017 October 1996 Application for Amend to License NPF-86,consisting of Change Request 96-02,proposing Changes That Involve Relocation of Four TS Re Instrumentation Requirements Contained in TS Section 3/4.3 ML20129B7631996-10-16016 October 1996 Application for Amend to License NPF-86,consisting of Change Request 96-06,proposing Four Changes Re EDG Requirements Contained in TS 3/4.8.1, AC Sources ML20113B1911996-06-20020 June 1996 License Amend Request 96-17 to License NPF-86,increasing Allowed Outage Time for Inoperable Svc Water Cooling Tower Loop Electrical Supply to Be Equivalent to Allowed Outage Time for Inoperable Svc Water Cooling Tower Loop ML20117K3051996-06-0404 June 1996 Application for Amend to License NPF-86,implementing Performance Based Containment Leak Rate Testing Program at Seabrook Station by Changing Tss.Request Submitted IAW 10CFR50,App J,Option B & Reg Guide 1.163 Requirements ML20092M1011995-09-22022 September 1995 Application for Amend to License NPF-86,consisting of LAR 95-07 Re Automatic Switchover to Containment Sump/Rwst Level low-low ML20098A4711995-09-20020 September 1995 Application for Amend to License NPF-86,relocating Functional Unit 6.b, FW Isolation- Low RCS T Avg Coincident W/Rt from TS 3.3.2 to Plant TS Requirements Manual Licensee Controlled Document ML20092K2091995-09-20020 September 1995 Application for Amend to License NPF-86,changing TS 3/4.9.1 Re Refueling Boron Concentration (Ref NUREG-1431) ML20092F9141995-09-12012 September 1995 Application for Amend to License NPF-86,TS Bases for RCS Safety Valves Bases Section 3/4.4.2 Were Made to Clarify What Specifically Constitutes Operable Pressurizer Safety Valve in Mode 5 ML20092A6251995-09-0505 September 1995 Application for Amend to License NPF-86,revising Main Steam Safety Valve Setpoints & Max Allowable Power Range Neutron Flux High Setpoints W/Inoperable Main Steam Safety Valves ML20086R2091995-07-24024 July 1995 LAR 95-03 to License NPF-86,relocating Table 3.4-1, RCS PIVs from TS 3.4.6.2, RCS Operational Leakage to Technical Requirements Manual ML20085L1101995-06-16016 June 1995 Application for Amend to License NPF-86.Amend Would Increase Requirements for Core Reactivity Control Available from Borated Water Sources ML20084U5391995-06-0707 June 1995 Application for Amend to License NPF-86,consisting of Amend Request 95-02,revising Footnote to SR 4.4.7 & Table 3.4-2 to Increase Temp Limit at Which Rc O Levels Determined by Sampling from 180 Degrees F to 250 Degrees F ML20084N9501995-05-30030 May 1995 Application for Amend to License NPF-86.Amend Will Allow Operation of Core W/Positive Moderator Temp Coefficient ML20082L5001995-04-17017 April 1995 Application for Amend to License NPF-86,revising TS 3.9.4 That Addresses Containment Bldg Penetrations to Allow Use of Alternate Containment Bldg Penetration Closure Methodologies for Postulated Accident Scenarios During Core Alterations ML20078E0351995-01-25025 January 1995 Application for Amend to License NPF-86,to Revise Surveillance Requirement 4.6.1.2.a from Specific Schedule for Performance of Containment ILRTs ML20076G2691994-10-0707 October 1994 License Amend Request 94-03 to License NPF-86,modifying TS Administrative Control Requirements for Emergency & Security Plans,Per GL 93-07 ML20059H6321994-01-14014 January 1994 LAR 93-20 to License NPF-86,changing Administrative Controls in TS Section 6.0 to Redefine Composition of Sorc,Create Station Qualified Reviewer Program,Delete Requirement to Perform Periodic Procedure Reviews & Revise TS 6.4.2.9 ML20058C2991993-11-23023 November 1993 LAR 93-18 to License NPF-86,allowing Operation of Core within Axial Flux Difference Band Expanded from Current Band in TSs & Improved Fuel Cycle Mgt Through Implementation of Core Design Enhancements ML20059C5191993-10-28028 October 1993 LAR 93-14 to License NPF-86,changing TS to Implement 13 Line Item Improvements Recommended by GL 93-05, Line-Item TS Improvements to Reduce SRs for Testing During Power Operation ML20057F2981993-10-0404 October 1993 Application for Amend to License NPF-86,proposing Changes to TS Correcting Inconsistency within TS by Deleting Requirement to Verify EDG Speed ML20056F7641993-08-26026 August 1993 LAR Requesting Exercise of Enforcement Discretion from Requirement to Perform Channel Check on Narrow Range RWST low-low Level Transmitters ML20045C5541993-06-18018 June 1993 LAR 93-08 to License NPF-86,changing Title of TS 6.2.3 to Independent Technical Reviews & Deleting Requirement to Maintain Five Person Organization,Iseg ML20045D5831993-06-18018 June 1993 LAR Proposing Changes to Seabrook Station Tech Specs to Reduce Frequency of Surveillances Which Are Required to Verify Integrity of CST Enclosure ML20127F8071993-01-13013 January 1993 License Amend Request 92-015 to License NPF-86,changing TS 6.8.1.4, Semiannual Radioactive Effluent Release Rept, to Change Submittal Frequency from Semiannually to Annually ML20117A7941992-11-25025 November 1992 License Amend Request 92-14 to License NPF-86,revising TS to Allow Fixed Incore Detectors to Be Used as Independent Sys to Perform TS Surveillances ML20106E4151992-11-0303 November 1992 Application for Amend to License NPF-86,consisting of License Amend Request 92-04,changing TS to Revise Current Requirement That Operations Manager Hold Senior Reactor Operator License ML20115J4301992-10-22022 October 1992 License Amend Request 92-12 to License NPF-86,changing TS to Correct Acceptance Value for Sum of RHR Sys Injection Line Flow Rates ML20118B9391992-09-30030 September 1992 License Amend Request 92-13 to License NPF-86,increasing TS Temp Limit for Cooling Tower Basin Water from 67.3 F to 70 F & Permitting Cooling Tower Sprays & Fans to Be Manually Operated Following Cooling Tower Actuation 1999-06-23
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20196G3531999-06-23023 June 1999 LAR 99-19 for License NPF-86,increasing AOT for Cracs from 30 Days to 60 Days on One Time Basis for Each Train to Facilitate on-line Implementation of Design Enhancements During Current Operating Cycle ML20207J6201999-03-15015 March 1999 Application for Amends to Licenses NPF-49 & NPF-86, Transferring Control of Licenses to Reflect Change in Upstream Economic Ownership of Parent Company of Nep,Vols I & Ii.Pages 48,49 & Annual Rept 1996 Pages 2 & 3 Omitted ML20207G9261999-03-0505 March 1999 Suppl Application for Transfer of License NPF-86,requesting Consent for Transfer of Montaup Electric Co Interest in OL for Seabrook Station to Little Bay Power Corp ML20198E7291998-12-16016 December 1998 Application for Amend to License NPF-86.Amend Involves Relocation of TS 3/4.7.10 & Associated TS Table 3.7-3 to Technical Requirements Manual ML20198E7781998-12-16016 December 1998 License Amend Request 98-09 to License NPF-86,either Revising Refs & Statements That Are Inaccurate or Providing Relief from Administrative Controls Which Provide Insignificant Safety Benefit ML20155J1671998-11-0404 November 1998 LAR 98-17 to License NPF-86,revising TS SR 4.5.2b.1 to Remove Prescriptive Requirements of Using Venting Process as Sole Means to Verify That ECCS Piping Is Full of Water ML20154F9971998-09-29029 September 1998 Application 98-16 for Amend to License NPF-86,reflecting Removal of Montaup Electric Co & Addition of Little Bay Power Corp ML20249B4161998-06-17017 June 1998 Revised LAR 98-07,reflecting Proposed Changes in LAR 98-07 W/Recently Issued License Amend 56 Which Split TS 3/4.7.6 Into Separate TSs,3/4.7.6.1 & 3/4.7.6.2 ML20247R6821998-05-20020 May 1998 LAR 97-07 to License NPF-86,revising Refueling Water Storage Tank low-low Level Setpoint ML20217E8611998-04-22022 April 1998 LAR 98-04 to License NPF-86,changing TS Surveillance Intervals to Accommodate 24 Month Fuel Cycle,Per GL 91-04 ML20216C5751998-04-0808 April 1998 Application 98-03 for Amend to License NPF-86,changing TS Surveillance Intervals to Accommodate 24-month Fuel Cycle, Per GL 91-04 ML20217Q2761998-04-0303 April 1998 Application for Amend to License NPF-86,LAR 98-02,proposing Changes to TS to Accomodate Fuel Cycles of Up to 24 Months, Per GL 91-04, Changes in TS Surveillance Intervals to Accommodate 24-Month Fuel Cycle ML20217M3671998-03-27027 March 1998 LAR 98-07 to License NPF-86,modifying Tech Specs 3.7.6, Control Room Emergency Makeup Air & Filtration Subsystem ML20217F0931998-03-23023 March 1998 Application for Amend to License NPF-86,proposing Administrative Change to TS to Incorporate Administrative Controls of New Specification 3.0.5,currently Approved for Use in NUREG-1431 ML20217Q0971998-03-0505 March 1998 Application for Amend to License NPF-86,incorporating Programmatic Controls in TS for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20217N8151998-03-0202 March 1998 Application for Amend to License NPF-86,changing TS to Exclude Prescriptive Requirement to Vent Operating CVCS CCP Casing ML20217N7231998-03-0202 March 1998 Application for Amend to License NPF-86,changing TS to Revise Frequency for Performance of Specific Surveillances & Delete Requirements for Accelerated Testing When Number of Valid Test Failures Associated W/Edgs Is Met or Exceeded ML20211E9761997-09-26026 September 1997 Application for Amend (LAR 97-05),changing TS 3.7.6 by Separating Requirements for Control Room HVAC Sys Re Operation of Control Room Emergency Makeup Air & Filtration Sys Subsystem & Control Room Air Conditioning Subsys ML20141B3521997-06-19019 June 1997 License Amend Request 97-03 to License,Revising TS Administrative Control 6.8.1.6.b to Include Ref to NRC Approved W Topical Rept WCAP-12610-P-A, Vantage + Fuel Assembly Ref Core Rept ML20148F9971997-05-29029 May 1997 License Amend Request 97-02,to License NPF-86,replacing Term Zircaloy W/Terminology That Identifies NRC Approved Westinghouse Fuel Assembly Design Consisting of Assemblies W/Either ZIRLO or Zircaloy-4 Fuel Cladding Matl ML20134Q3291997-02-18018 February 1997 Application for Amend to License NPF-86,changing Reactor Core Fuel Assembly Design Features Requirements Contained in Tech Specs 5.3.1, Fuel Assemblies ML20134L8591997-02-12012 February 1997 Application for Amend to License NPF-86,requesting Rev to TS Section 6.0 Re Administrative Controls ML20129B8211996-10-17017 October 1996 Application for Amend to License NPF-86,consisting of Change Request 96-02,proposing Changes That Involve Relocation of Four TS Re Instrumentation Requirements Contained in TS Section 3/4.3 ML20129B7631996-10-16016 October 1996 Application for Amend to License NPF-86,consisting of Change Request 96-06,proposing Four Changes Re EDG Requirements Contained in TS 3/4.8.1, AC Sources ML20113B1911996-06-20020 June 1996 License Amend Request 96-17 to License NPF-86,increasing Allowed Outage Time for Inoperable Svc Water Cooling Tower Loop Electrical Supply to Be Equivalent to Allowed Outage Time for Inoperable Svc Water Cooling Tower Loop ML20117K3051996-06-0404 June 1996 Application for Amend to License NPF-86,implementing Performance Based Containment Leak Rate Testing Program at Seabrook Station by Changing Tss.Request Submitted IAW 10CFR50,App J,Option B & Reg Guide 1.163 Requirements ML20092M1011995-09-22022 September 1995 Application for Amend to License NPF-86,consisting of LAR 95-07 Re Automatic Switchover to Containment Sump/Rwst Level low-low ML20092K2091995-09-20020 September 1995 Application for Amend to License NPF-86,changing TS 3/4.9.1 Re Refueling Boron Concentration (Ref NUREG-1431) ML20098A4711995-09-20020 September 1995 Application for Amend to License NPF-86,relocating Functional Unit 6.b, FW Isolation- Low RCS T Avg Coincident W/Rt from TS 3.3.2 to Plant TS Requirements Manual Licensee Controlled Document ML20092F9141995-09-12012 September 1995 Application for Amend to License NPF-86,TS Bases for RCS Safety Valves Bases Section 3/4.4.2 Were Made to Clarify What Specifically Constitutes Operable Pressurizer Safety Valve in Mode 5 ML20092A6251995-09-0505 September 1995 Application for Amend to License NPF-86,revising Main Steam Safety Valve Setpoints & Max Allowable Power Range Neutron Flux High Setpoints W/Inoperable Main Steam Safety Valves ML20086R2091995-07-24024 July 1995 LAR 95-03 to License NPF-86,relocating Table 3.4-1, RCS PIVs from TS 3.4.6.2, RCS Operational Leakage to Technical Requirements Manual ML20085L1101995-06-16016 June 1995 Application for Amend to License NPF-86.Amend Would Increase Requirements for Core Reactivity Control Available from Borated Water Sources ML20084U5391995-06-0707 June 1995 Application for Amend to License NPF-86,consisting of Amend Request 95-02,revising Footnote to SR 4.4.7 & Table 3.4-2 to Increase Temp Limit at Which Rc O Levels Determined by Sampling from 180 Degrees F to 250 Degrees F ML20084N9501995-05-30030 May 1995 Application for Amend to License NPF-86.Amend Will Allow Operation of Core W/Positive Moderator Temp Coefficient ML20082L5001995-04-17017 April 1995 Application for Amend to License NPF-86,revising TS 3.9.4 That Addresses Containment Bldg Penetrations to Allow Use of Alternate Containment Bldg Penetration Closure Methodologies for Postulated Accident Scenarios During Core Alterations ML20078E0351995-01-25025 January 1995 Application for Amend to License NPF-86,to Revise Surveillance Requirement 4.6.1.2.a from Specific Schedule for Performance of Containment ILRTs ML20076G2691994-10-0707 October 1994 License Amend Request 94-03 to License NPF-86,modifying TS Administrative Control Requirements for Emergency & Security Plans,Per GL 93-07 ML20059H6321994-01-14014 January 1994 LAR 93-20 to License NPF-86,changing Administrative Controls in TS Section 6.0 to Redefine Composition of Sorc,Create Station Qualified Reviewer Program,Delete Requirement to Perform Periodic Procedure Reviews & Revise TS 6.4.2.9 ML20058C2991993-11-23023 November 1993 LAR 93-18 to License NPF-86,allowing Operation of Core within Axial Flux Difference Band Expanded from Current Band in TSs & Improved Fuel Cycle Mgt Through Implementation of Core Design Enhancements ML20059C5191993-10-28028 October 1993 LAR 93-14 to License NPF-86,changing TS to Implement 13 Line Item Improvements Recommended by GL 93-05, Line-Item TS Improvements to Reduce SRs for Testing During Power Operation ML20057F2981993-10-0404 October 1993 Application for Amend to License NPF-86,proposing Changes to TS Correcting Inconsistency within TS by Deleting Requirement to Verify EDG Speed ML20056F7641993-08-26026 August 1993 LAR Requesting Exercise of Enforcement Discretion from Requirement to Perform Channel Check on Narrow Range RWST low-low Level Transmitters ML20045C5541993-06-18018 June 1993 LAR 93-08 to License NPF-86,changing Title of TS 6.2.3 to Independent Technical Reviews & Deleting Requirement to Maintain Five Person Organization,Iseg ML20045D5831993-06-18018 June 1993 LAR Proposing Changes to Seabrook Station Tech Specs to Reduce Frequency of Surveillances Which Are Required to Verify Integrity of CST Enclosure ML20127F8071993-01-13013 January 1993 License Amend Request 92-015 to License NPF-86,changing TS 6.8.1.4, Semiannual Radioactive Effluent Release Rept, to Change Submittal Frequency from Semiannually to Annually ML20117A7941992-11-25025 November 1992 License Amend Request 92-14 to License NPF-86,revising TS to Allow Fixed Incore Detectors to Be Used as Independent Sys to Perform TS Surveillances ML20106E4151992-11-0303 November 1992 Application for Amend to License NPF-86,consisting of License Amend Request 92-04,changing TS to Revise Current Requirement That Operations Manager Hold Senior Reactor Operator License ML20115J4301992-10-22022 October 1992 License Amend Request 92-12 to License NPF-86,changing TS to Correct Acceptance Value for Sum of RHR Sys Injection Line Flow Rates ML20118B9391992-09-30030 September 1992 License Amend Request 92-13 to License NPF-86,increasing TS Temp Limit for Cooling Tower Basin Water from 67.3 F to 70 F & Permitting Cooling Tower Sprays & Fans to Be Manually Operated Following Cooling Tower Actuation 1999-06-23
[Table view] |
Text
__ - - _ _ ._. -_ _ _ - . . .
l l
M North sesenoox srsnon umr 1
- miss:: Aflanfic Energy Service Corporation l
l l
l Facility Operating License NPF 86
. Docket No. 50-443-I License Amendment Request No. 93-08 independent Technical Reviews This License Amendment Request is submitted by North Atlantic Energy Service Corporation pursuant to 10CFR50.90. The following information is enclosed in support of this License Amendment Request:
. Section 1 - Introduction and Description of Proposed Changes
.Section II -
Markup of Proposed Changes
. Section lli -
Retype of Proposed Changes
.Section IV -
Safety Evaluation of Proposed Changes
.Section V - Determination of Significant Hazards for Proposed Changes
.Section VI - Proposed Schedule for License Amendment issuance and Effectiveness
. Section Vil - EnvironmentalImpact Assessment Sworn and Subscribed dy f /Lf j ,1993 [
D Sf
//d/ /[/[ /d Ted C. Feigpfibaum j Notary Public Senior Vice President and Chief Nuclear Officer m.C ' A c : : ,x o,, r;n:r,, pe.,
tt, Cce,;r s:gn :~9,n g.; ,3, y 9306230289 930618 3 PDR ADOCK 05000443 P PDR
- 1. Introduction and Description of Proposed Chances A Introduction The purpose of License Amendment Request 93-08 is to propose changes to Seabrook Station Technical Specification 6.2.3, independent Safety Engineering Group (ISEG).
The proposed changes revise the title of Technical Specification 6.2.3 to independent Technical Reviews and delete the requirement to maintain a five person organization, known as the ISEG, that is dedicated to performing the independent technical reviews. The proposed revision to Technical Specification 6.2.3 maintains the requirement to perform the reviews specified in the current Technical Specification and requires that the reviews be performed by personnel who are independent of the plant management chain.
North Atlantic has long recognized that the current Technical Specification 6.2.3 does not provide flexibility in the performance of the required reviews. In addition, the Technical Specification places a constraint on North Atlantic by requiring the establishment of a separate organization, composed of at least five full time engineers, that is dedicated to the performing the independent technical reviews.
This constraint places unnecessary limitations upon North Atlantic's utilization of its technical resources .in that it requires some duplication of effort in order to ensure that the ISEG reviews the specified material while it also maintains independence related to in-line functions such as assigning action items, scheduling and expediting the completion of activities, in some cases, the ISEG is not the organization most qualified to perform the reviews of a particular event or industry occurrence, in these cases there is a duplication of review effort as North Atlantic always strives to perform the best review or analysis possible even if it means duplicating effort. In these cases where effort is duplicated places an unnecessary burden upon North Atlantic and causes resources to be utilized in a manner that is not the most effective and does not provide any additional benefit with regard to protecting the health and safety of the public.
It is apparent that the NRC and the industry have also recognized that the current ISEG Technical Specification does not provide flexibility and significantly constrains the ability of a licensee to most effectively utilize its resources. This Specification was reviewed during the development of the Improved Standard Technical Specifications. With the issuance of NUREG 1431, Standard Technical Specifications Westinghouse Plants, the ISEG Specification has been replaced by a substantially more flexible Specification that continues to require the reviews, which are currently specified in Specification 6.2.3, to be performed. However, the Improved Technical Specifications delete the requirement for the establishment of a five person organization assigned to perform the specified reviews.
In addition, the NRC's Regulatory Review Group, in its draft "Assesstnent of the Seabrook Station Operating License" dated February 1993, examined Technical Specification 6.2.3. The Regulatory Review Group chose this item for review because it is very prescriptive with regard to manpower requirements. The Regulatory Review Group assesstnent noted that in the Improved Standard Technical Specifications the ISEG has been replaced with an independent review function which provides a relaxation of the five person staffing requirement and permits enore flexible methods of performing the reviews. The Regulatory Review Group stated that this flexibility includes the establishment of standing or ad hoc committees or the assignment of 1
l
- - - . - - , - - . ~. - -- .-- -
reviews to existing capable individuals or groups. The Regulatory Review Group concluded that the:
"Seabrook Technical Specification requirement related to the composition of the ISEG provides no flexibility "
Furthermore, the Regulatory Review Group noted that a Technical Specific'ation change could be submitted adopting the Improved Standard Technical Specification approach and thereby providing considerable flexibility in the implementation of what is currently the ISEG review requirement.
North Atlantic Executive mangement reviewed the Regulatory Review Group report and the Improved Standard Tednical Specifications and concurred that the ISEG composition requirement does not allow North Atlantic management to effectively mange company resources. Therefore, North Atlantic has determined that it is in the best interests of the company to pursue a Technical Specification revision that utilizes the concepts provided in the improved Standard Technical Specifications to delete the ISEG composition requirement and establish an independent technical review requirement in its place. This proposed Technical Specification revision is consistent with North Atlantic's initiative to reduce requirements that are in excess of those required by regulation and which do not affect the safe operation of the plant .
North Atlantic believes that this approach is consistent with the Executive Order issued by President Bush and with the current NRC policy as stated during the 1993 Regulatory Review Conference.
In addition, the North Atlantic commitment to implement NUREG 0737, Item 1.B.1.2 will be revised to delete the commitment to maintain a full time five person organization to perform the independent technical reviews. This change will necessitate the revision of Updated Final Safety Analysis Report (UFSAR) Section 1.9, Compliance with NUREG 0737: Clarification of TMI Action Plan Requirements.
This UFSAR revision is consistent with the revision to Technical Specification 6.2.3 and is provided for information in Section Vill, Supporting Information. In addition, UFS AR Section 13.4.3, Independent Safety Engineering Group (ISEG), will be revised to be consistent with proposed changes to Technical Specification 6.2.3. A copy of the revision to UFSAR Section 13.4.3 is also provided for information in Section Vill.
The proposed changes adopt the independent review principles established in the Improved Standard Technical Specifications, NUREG.1431, Standard Technical Specifications Westinghouse Plants. North Atlantic believes that the proposed changes are consistent with the intent of the Executive Order issued by President Bush and with the NRC Regulatory Review effort as discussed during the.1993 Regulatory Information Conference. The ISEG composition requirement is
- burdensome to a utility as it restricts the capability to utilize resources to.their maximum advantage and does not result in an increase in the protection afforded to the health and safety of the public.
The proposed changes require that a Technical Review Program be established and maintained. North Atlantic will issue the Technical Review Program within 30 days of the issuance of the license amendment and prior to its implementation.
f 2
1 I
1 1
B. Description of Proposed Changes J The proposed Technical Specification changes affect Technical Specification 6.2.3, ;
Independent Safety Engineering Group, (ISEG). The proposed changes-l e Retitle this Specification as Independent Technical Reviews e Require that a Technical Review Program be established to address all of the requirements that are currently listed in Specifications 5.2.3.1 and 6.2.3.4 e Require that the personnel performing the Independent Technical Reviews be independent of the plant management chain, e Establish a new records requirement in Specification 6.2.3.2.
e Delete the ISEG Composition requirement, and e Establish a qualifications requirement for personnel performing the Independent Technical Reviews.
The utilization of equivalency based upon education and experience as defined in ANSI /ANS 3.1, 1981 has been previously accepted by the NRC for the Beaver Valley Power Station, Unit 2, Docket No. 50 412 as License Amendment No. 26.
3 l