IR 05000413/1985038

From kanterella
(Redirected from ML20132C604)
Jump to navigation Jump to search
Insp Repts 50-413/85-38 & 50-414/85-39 on 850826-31.No Violation Noted.Major Areas Inspected:Audit,Testing & Maint, Key Control,Alarm Stations & Previous Inspector Followup Items.Details Withheld (Ref 10CFR2.790(d) & 73.21)
ML20132C604
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 09/18/1985
From: Mcguire D, Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20132C570 List:
References
50-413-85-38, 50-414-85-39, NUDOCS 8509270097
Download: ML20132C604 (1)


Text

_~

-

.

.

- - - -. '

'

,

p Kfoo UNITED STATES o

NUCLEAR REGULATORY COMMISSION

[\\-

  • ,'n REGION 11 g

j 101 MARIETTA STREET, N.W.

  • r ATLANTA, GEORGI A 30323

%..... * '#

SEP 231985 Report Nos. 50-413/85-38 and 50-414/85-39 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket Nos. 50-413 and 50-414 License Nos. NPF-35 and CPPR-117 Facility Name: Catawba Units 1 and 2 Inspection Date: August 26-31, 1985 Inspector:

\\Tt i 12 O

W. J. Tobtq, Senior Security Inspector (fate 'Si ned Approved by:.

c, E

9 /f 6 D. R. McGuire', Chief, Physical Security Section Ofte Signed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards

!

SUMMARY Scope:

Routine, unannounced inspection totaling 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> onsite.

Areas

,

inspected were, Audit, Testing and Maintenance, Key Control, Power Supply, Lighting, Compensatory Measures, Access Control, Alarm Stations, and previous Inspector Follow-up Items.

l Results:

There were no violations identified during this inspection.

!

!

l i

'

8509270097 850923

'

PDR ADOCK 05000413

PDR ENCLOSURE CONTAINS \\

SAFEGUARDS I ggyATION; UPON SEPARATION THIS noe is ozcoNrRouro.

-

-

- -

-

-

- -

-

-

- -

-