ML20132C565

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-413/85-38 & 50-414/85-39 on 850826-31.No Violation or Deviation Noted
ML20132C565
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 09/23/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20132C570 List:
References
NUDOCS 8509270089
Download: ML20132C565 (2)


See also: IR 05000413/1985038

Text

a---A

.6

++

~2---4

-L2-------+-+e

4

  1. a4-eh+w

es.-.

-

-*L

--

- - - - -

.-J.-

A

- .

a

'

SAFEGUARDS INFORMATION'

i

SEP 2 31985

,

Duke Power Company

ATTN: - Mr. H. B. Tucker, Vice President

Nuclear Production Department

422 South Church Street'

Charlotte, NC 28242

Gentlemen:

1

SUBJECT:

REPORT NOS. 50-413/85-38 AND 50-414/85-39

On August 26-31, 1985, NRC inspected activities authorized by NRC Operating

License No. NPF-35 and Construction Permit No. CPPR-117 for your Catawba facility.

At the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed inspection report.

l

Areas examined during the inspection are identified in the report. Within these

l

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

,

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

,

l

security measures are exempt from public disclosure; therefore, the enclosures to

!

this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

,

'

Inspection Report Nos. 50-413/85-38

3

and 50-414/85-39

cc w/ encl:

R. L. Dick, Vice President - Construction

J. W. Hampton, Station Manager

bec w/ encl:

(See page 2)

g 92{0g g % ]on

pyramusmcm.rm

ou egrain

gg

x

o

e

,

UPM EEPM1ATI01; InIs

SAFEGUARDS INFORMATION

w rs nummmm

S o y

s\\ '

.

.

._.

.

.

_ _

_

._

__ _

_

_

- . . -

_

!'.

SAFEGUARDS INFORMATION'

-

!

Duke Power Company

2

EP 23 E

l.

bec w/ encl:

i

,

l~

IE File

l

NMSS/SGPL

NRR/DL/SSPB

(.

bec w/ Inspection Sumary:

'

Document Control Desk, 016

NRC Resident Inspector

State of South Carolina

l

i

e

i

,

!

I

I

i

l

l

!

,

'

l

/

RII

R

I

i

RI

,

l-

WTobin:bhg

DM:g/85

uire

rr

JP5 ohr

CBurger

9/{1/85

9/1 N

9,

/85

9p/85

9/g 85

,

y

ll[tchf% con

  1. #

SAFEGUARDS INFORMATION>

a#

o

<

.