ML20126K755
| ML20126K755 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 05/13/1981 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20126K752 | List: |
| References | |
| NUDOCS 8105210179 | |
| Download: ML20126K755 (1) | |
Text
. _ _
iE
~
[Mfy}
00 wo[l LII-11 TING' CCNDITION FOR-OPERATION SURVEILLANCE REQUIREI4ENT wo e
~
- 3. 8. 5 Accumulator System
- 4. 8. 5 Accumulator System
,Jb (Table 4. 8-4) c.
The four accumulator systems shall satisfy the following conditions whenever A.
Surveillance and testing of tha accumulator system shall be performed the reactor coolant system pressure exceeds 1000 psig except as specified as follows :
in 3.8.5.A.S.
(See 3. 3.2.G for low RCS temperature operation.)
1.
The pressure and level of the accumulator tanks shall be 1.
Each accumulator shall be.
checked once a shift.
At each 51 preasqrized to at least 600 psig increase in" level, the boron and -shall contain minimp of 819 ft3 concentration will be checked.
and a maximum of 868 ftJ of water.
2.
The accumulator boron con-centration shall'be checked monthly, 2.
Each accumulator sha'11 contain
~
water borated to at least 2000 ppm.
3.
The accumulator check valve opera 3.
Each accumulator's isolation bility (SI-8948A, B,
C, and D and (SI-8956A, B, C, and D) will be valve shall be open.:
, verified at each refueling outage by opening the accumulator outlet isolation valve (MOV-SI8808A, B,
C, and D) and verifying a decrease in accumulator level and a leak-age test to determine'that no gross valve leakage is experienced.
~
4.
Isolation Valves Not applicable.
I
. W 13198, Amendment No. 64, Unit 1 Amendment No. 61, Unit 2 174
-