MONTHYEARML20059B1291993-09-14014 September 1993 Affidavit of Jh Freeman.* Discusses Transfer of Slightly Used Nuclear Fuel from Shoreham Nuclear Power Station to Limerick Generating Station.W/Certificate of Svc & Notice of Appearance ML20095H5611992-04-28028 April 1992 Affidavit of Lm Hill.* Affidavit of Lm Hill Supporting Util Position That Circumstances Exist Warranting Prompt NRC Action on NRC Recommendation That Immediately Effective Order Be Issued Approving Decommissioning Plan ML20073B7461991-04-17017 April 1991 Affidavit of EM Franz Re Whether Party Sufficiently Threatened by Radiological Hazard & Other Environ Impacts of Proposal to Establish Requisite Interest & Standing for Intervention as of Right ML20073B7211991-04-17017 April 1991 Affidavit of Jl Bateman Re Whether Party Sufficiently Threatened by Radiological Hazard & Other Environ Impacts of Proposal to Establish Requisite Interest & Standing for Intervention as of Right ML20073B7941991-04-17017 April 1991 Affidavit of Jr Stehn Re Whether Party Sufficiently Threatened by Radiological Hazard & Other Environ Impacts of Proposal to Establish Requisite Interest & Standing Intervention as of Right.W/Certificate of Svc ML20073B7821991-04-17017 April 1991 Affidavit of J Scrandis Re Whether Party Sufficiently Threatened by Radiological Hazard & Other Environ Impacts of Proposal to Establish Requisite Interest & Standing for Intervention as of Right ML20073B7161991-04-17017 April 1991 Affidavit of Organizational Interest by Mm Todorovich, Executive Director of Scientists & Engineers for Secure Energy,Inc (Sese) Re Intervenors Status for Sese ML20073B7611991-04-17017 April 1991 Affidavit of SV Musolino Re Whether Party Sufficiently Threatened by Radiological Hazard & Other Environ Impacts of Proposal to Establish Requisite Interest & Standing for Intervention as of Right ML20073A6101991-04-0505 April 1991 Affidavit of Jl Bateman Re Determination of Whether Party Sufficiently Threatened by Radiological Hazard & Other Environ Impacts of Proposal to Establish Requisite Interest & Standing for Intervention ML20073A4631991-04-0505 April 1991 Affidavit of Ag Prodell Re Determination of Whether Party Sufficiently Threatened by Radiological Hazard & Other Environ Impacts of Proposal to Establish Requisite Interest & Standing for Intervention.W/Certificate of Svc ML20073A6161991-04-0505 April 1991 Affidavit of AP Hull Re Determination of Whether Party Sufficiently Threatened by Radiological Hazard & Other Environ Impacts of Proposal to Establish Requisite Interest & Standing for Intervention.W/Certificate of Svc ML20073A5831991-04-0505 April 1991 Affidavit of E Franz Re Determination of Whether Party Sufficiently Threatened by Radiological Hazard & Other Environ Impacts of Proposal to Establish Requisite Interest & Standing for Intervention ML20073A5571991-04-0505 April 1991 Affidavit of Jr Stehn Re Determination of Whether Party Sufficiently Threatened by Radiological Hazard & Other Environ Impacts of Proposal to Establish Requisite Interest & Standing for Intervention ML20073A6041991-04-0505 April 1991 Affidavit of SV Musolino Re Determination of Whether Party Sufficiently Threatened by Radiological Hazard & Other Environ Impacts of Proposal to Establish Requisite Interest & Standing for Intervention ML20073A5511991-04-0505 April 1991 Affidavit of J Scrandis Re Determination of Whether Party Sufficiently Threatened by Radiological Hazard & Other Environ Impacts of Proposal to Establish Requisite Interest & Standing for Intervention ML20073A5301991-04-0505 April 1991 Affidavit of Organizational Interest by Mm Todorovich, Executive Director of Scientists & Engineers for Secure Energy,Inc.* ML20067C5361991-02-0303 February 1991 Affidavit of Franz,E M.* Affidavit Re Mod to Facility License ML20067C6721991-02-0303 February 1991 Affidavit of Eena-Mai Franz.* Believes Confirmatory Order Constitutes Another Step in Decommissioning Process to Violate Rights Under NEPA & Represents Threat to Health & Safety ML20067D0671991-02-0202 February 1991 Affidavit of Jr Stehn.* Affidavit Re Mod of Plant License. W/Certificate of Svc ML20067C4911991-02-0101 February 1991 Affidavit of Organizational Interest by Mm Todorovich, Executive Director of Scientists & Engineers for Secure Energy,Inc.* Affidavit of Mm Todorovich Re Organizational Interest in Modifying License to Plant ML20067C5881991-02-0101 February 1991 Affidavit of J Scrandis.* Affidavit Re Mod of Plant License ML20067C6101991-02-0101 February 1991 Affidavit of Jr Stehn.* Affidavit Re Mod of Facility License.W/ Certificate of Svc ML20067C8651991-02-0101 February 1991 Affidavit of Ag Prodell.* Opposes Confirmatory Order Issued on 900329,prohibiting Licensee from Placing Fuel Into Reactor Vessel W/O Prior NRC Approval ML20067C4991991-02-0101 February 1991 Affidavit of Jl Bateman.* Affidavit Re Mod of Plant License ML20067C5741991-01-31031 January 1991 Affidavit of SV Musolino.* Affidavit Re Mod of Plant License ML20067C5631991-01-31031 January 1991 Affidavit of AP Hull.* Affidavit Re Mod of Plant License ML20091C6711990-03-30030 March 1990 Affidavit of WE Steiger.* Provides Info in Support of Util Request to Amend Facility Physical Security Plan. W/Certificate of Svc ML20247B8831989-09-0707 September 1989 Affidavit of WE Steiger in Support of Util Request for Exemption from Onsite Property Damage Insurance,Per 10CFR50.54(w) ML20206M9851988-11-22022 November 1988 Affidavit of LC Lanpher.* Affidavit Re Govts 881123 Motion to Stay 881121 Licensing Board Memorandum & Order Authorizing NRC to Make Necessary Findings on 25% Power Issues & to Issue 25% Power License to Util ML20206M9921988-11-22022 November 1988 Affidavit of Gc Minor in Support of Motion for Stay.* Supports Govts Motion to Stay ASLB 881121 Order Authorizing Issuance of 25% Power OL for Plant ML20206N0001988-11-0303 November 1988 Affidavit of Ej Gleason,Director of Planning,State of Ny Energy Ofc.* Provides Data on Whether Supply of Electric Power to Long Island Would Be Adversely Impacted If Plant Did Not Operate.W/Related Info & Certificate of Svc ML20205R5351988-11-0303 November 1988 Affidavit of CA Daverio in Support of Lilco Response to 1988 Exercise Contentions.* ML20205N5231988-10-31031 October 1988 Affidavit of Kj Letsche in Support of Motion to Disqualify Judges Gleason & Kline.* Certificate of Svc Encl ML20205D6451988-10-14014 October 1988 Affidavit of Am Madsen in Support of Lilco Request for Stay of ALAB-902.* Certificate of Svc Encl ML20151N5851988-07-23023 July 1988 Affidavit of Dp Dreikorn on Lilco Compliance W/Fema Guidance Memorandum MS-1.* Certificate of Svc Encl ML20151G6051988-07-18018 July 1988 Affidavit of Ja Weistmantle.* Discusses Assertion That Lilco Obtained Complete Copy of Suffolk County Emergency Operations Plan Outside of Formal Discovery Processes ML20196B3571988-06-23023 June 1988 Affidavit of Jn Christman.* Schedule of Dispositions & Certificate of Svc Encl ML20151T4791988-04-21021 April 1988 Affidavit of Gc Minor & Sc Sholly Re Validity of Analyses & Conclusions Ref in Youngling Affidavit.W/Certificate of Svc ML20149H7411988-02-11011 February 1988 Affidavit of RT Hogan Re Disposition of Hosp Evacuation Issue,Per Rev 9 to Util Offsite Emergency Plan.W/Certificate of Svc ML20196D7771988-02-10010 February 1988 Affidavits in Support of Govts Opposition to Lilco Summary Disposition Motions on Contentions 1-2 & 4-10.* Supporting Affidavits Include Mm Cuomo,Pg Halpin,Rc Roberts,Je Papile, Kj Letsche & Rj Zahnleuter ML20196H1111988-02-0909 February 1988 Affidavit of Pg Halpin Re Matters Alleged by Util in Lilco Motions for Summary Disposition of Contentions 1-2 & 4-10 Dtd 871218.Summaries & Quotations of Util Assertions, Resolution 111-1983 & Pf Cohalan Statement Encl ML20196H0841988-02-0808 February 1988 Affidavit of Mm Cuomo Re Util Radiological Emergency Response Plan.Reaffirms Statements Made in 870506 Affidavit & 860630 Statement.Statement Encl ML20149D8311988-02-0404 February 1988 Affidavit of DM Crocker Re Suffolk County First Set of Requests for Admissions Dtd 880125.* Certificate of Svc Encl.Related Correspondence ML20149F1281988-01-25025 January 1988 Affidavit of T Urbanik Re Lilco Motion for Summary Disposition of Contentions 1,2 & 9.* Certificate of Svc Encl ML20148D4041988-01-19019 January 1988 Affidavit of Fg Palomino.* Util Had Matl Role in Activities Before Federal Govt by Endeavoring to Persuade Govt to Intercede in Proceeding During 1984 & 1985.Certificate of Svc Encl ML20148D3541988-01-19019 January 1988 Affidavit of Fr Jones.* Lists Conduct Supporting Fact That Util Has Not Made Good Faith to Secure & Retain Participation of Suffolk County ML20148D2281988-01-19019 January 1988 Affidavit of Gj Blass.* Util Refusal to Pay Property Taxes During 1984 & First Half of 1985 Constituted Severe Injury to County.Related Info Encl ML20148D1541988-01-19019 January 1988 Affidavit of LC Lanpher.* Submits Related Info to Support Contention That Lilco Has Not Made Isolated Good Faith Effort to Secure & Retain Participation of Suffolk County ML20147D7301988-01-15015 January 1988 Affidavit of Ms Miller Re Proposed Offsite Emergency Plan. Certificate of Svc Encl ML20148D3101988-01-11011 January 1988 Affidavit of T Urbanik.* Assumptions,Speeds & Methodology Used in Hosp Evaluation Time Estimates in Rev 9 to Util Plan Correct.Estimates Suitable for Inclusion for Use in Making Protective Action Recommendations.W/Certificate of Svc 1993-09-14
[Table view] Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20093G4541995-10-18018 October 1995 Comment Supporting Proposed Rules 10CFR2,50 & 51 Re Decommissioning Procedures for Nuclear Power Reactors ML20058K7381993-12-0303 December 1993 Memorandum & Order CLI-93-25.* Commission Denies State of Nj Petition for Leave to Intervene & Request for Adjudicatory Hearing Filed on 931008.W/Certificate of Svc.Served on 931203 ML20058E0151993-11-14014 November 1993 Comment Opposing Proposed Rule 10CFR50 Re Exemptions in Accident Insurance for Nuclear Power Plants Prematurely Shut Down ML20059B0301993-10-22022 October 1993 NRC Staff Response to Commission Questions Posed W/Respect to State of New Jersey Petition for Leave to Intervene & Request for Hearing.* Denies Petition to Intervene & Request for Hearing.W/Certificate of Svc & Notice of Appearance ML20059B0621993-10-20020 October 1993 Long Island Power Authority Response to Nuclear Regulatory Commission Order of 931014.* Requests That NRC Reject State of Nj Filing.W/Certificate of Svc ML20059B1111993-10-20020 October 1993 Philadelphia Electric Co Response to NRC 931014 Order.* State Failed to Demonstrate Entitlement to Hearing to Challenge Util Amend to Permit Util to Receive Shoreham Fuel ML20059A4581993-10-14014 October 1993 Order Requesting Answers to Two Questions Re State of Nj Request for Immediate Action by NRC or Alternatively, Petition for Leave to Intervene & Request for Hearing. Operations Plans for Marine Transportation Withheld ML20057G2141993-10-14014 October 1993 Order.* Requests for Simultaneous Responses,Not to Exceed 10 Pages to Be Filed by State,Peco & Lipa & Served on Other Specified Responders by 931020.NRC May File by 931022. W/Certificate of Svc.Served on 931014 ML20059F0191993-10-0808 October 1993 Long Island Power Authority Reply to New Jersey Filing of 931020.* Licensee Requests That NRC Deny State of Nj Intervention Petition.W/Certificate of Svc ML20057F2191993-09-30030 September 1993 Exemption from Requirements of 10CFR50.54(q) Eliminating Licensee Requirement to Follow & Maintain in Effect Emergency Plans ML20059B1291993-09-14014 September 1993 Affidavit of Jh Freeman.* Discusses Transfer of Slightly Used Nuclear Fuel from Shoreham Nuclear Power Station to Limerick Generating Station.W/Certificate of Svc & Notice of Appearance ML20097C2911992-06-0303 June 1992 Petitioner Consented Motion to Dismiss Appeal.* Dismisses 911203 Notice of Appeal W/Prejudice & W/Each Party Bearing Own Costs & Atty Fees Due to Encl Settlement Agreement. W/Certificate of Svc ML20097C1361992-06-0303 June 1992 Petitioners Consented Motion to Dismiss.* Petitioners by Counsel Move ASLB to Dismiss Petitioners as Petitioners for Leave to Intervene & Request for Hearing in Proceeding W/ Prejudice.W/Certificate of Svc ML20097C1081992-06-0303 June 1992 Petitioners Consented Motion to Dismiss Appeal.* Petitioners Hereby Move to Dismiss 910628 Notice of Appeal in Matter W/Prejudice & W/Each Party to Bear Own Costs & Atty Fees.W/ Certificate of Svc ML20097C2631992-06-0303 June 1992 Petitioner Consented Motion to Dismiss.* NRC Should Issue Order Dismissing School District & Scientists & Engineers for Secure Energy,Inc as Petitioners in Proceeding.W/ Settlement Agreement & Certificate of Svc ML20097C2891992-06-0303 June 1992 Petitioner Consented Motion to Dismiss Appeals.* Appeals Being Dismissed Due to Encl Settlement Agreement.Nrc Should Dismiss Appeals W/Prejudice & W/Each Party Bearing Own Costs & Atty Fees.W/Certificate of Svc ML20097C3241992-06-0303 June 1992 Petitioners Consented Motion to Dismiss Joint Opposition to Issuance of Decommissioning Order Prior to Hearing.* W/Certificate of Svc ML20096A5921992-05-0707 May 1992 Motion to Withdraw Supplemental Filing.* Petitioners Urge NRC to Allow Withdrawal of Supplement for Good Cause Shown. W/Certificate of Svc ML20096A5311992-05-0606 May 1992 Long Island Power Authority Comments on SECY-92-140 & Response to Petitioner Joint Opposition to Decommissioning Order.* Util Urges NRC to Adopt Recommendation in SECY-92-140 & Approve Order.W/Certificate of Svc ML20096A5071992-05-0505 May 1992 Suppl to Joint Opposition to NRC Staff Recommendation for Issuance of Decommissioning Order Prior to Hearing & Contingent Motion for Stay.* Supplements Joint Opposition Prior to Hearing.W/Certificate of Svc ML20095K8991992-04-29029 April 1992 Joint Opposition to NRC Staff Recommendation for Issuance of Decommissioning Order Prior to Hearing & Contingent Motion for Stay.* Petitioners Urge Commission to Reject NRC Staff Proposal in SECY-92-140.W/Certificate of Svc ML20095H5611992-04-28028 April 1992 Affidavit of Lm Hill.* Affidavit of Lm Hill Supporting Util Position That Circumstances Exist Warranting Prompt NRC Action on NRC Recommendation That Immediately Effective Order Be Issued Approving Decommissioning Plan ML20094G3971992-02-26026 February 1992 Notice of State Taxpayer Complaint & Correction.* NRC Should Stay Hand in Approving Application for License Transfer as Matter of Comity Pending Resolution of Question as Util Continued Existence in Ny State Courts.W/Certificate of Svc ML20094G2261992-02-25025 February 1992 Petitioner Notice of Lilco/Long Island Power Authority Exaggeration & of Commencement of State Court Action.* NRC Should Await Ny State Decision Re Matter within Special Jurisdiction.W/Certificate of Svc ML20092K9021992-02-24024 February 1992 Petitioner Opposition to Ltr Request for Dismissal of Pages.* Suggests That Transfer of License Inappropriate at Present Time.W/Certificate of Svc ML20092K9511992-02-21021 February 1992 Response of Lilco & Long Island Power Authority to Petitioner Opposition to NRC Staff Recommendation for License Transfer Approval.* W/Certificate of Svc ML20092K8701992-02-20020 February 1992 Petitioners Opposition to NRC Staff Recommendation for Approval of License Transfer.* Urges Commission to Reject NRC Recommendation in SECY-92-041 & Remand Matter for Consideration in Normal Proceeding.W/Certificate of Svc ML20091E2661992-02-20020 February 1992 Petitioner Opposition to NRC Staff Motion to Dismiss.* Petitioners Urge NRC to Deny Staff Motion or Defer Action Until Petitioners Have Fully Developed Petitions & Supplied Detailed Contentions.W/Certificate of Svc ML20091E4011992-02-18018 February 1992 Answer of Long Island Power Authority to NRC Staff Motion to Dismiss Intervention Petitions.* Util Urges NRC to Grant Motion & Dismiss Intervention Petitions.W/Certificate of Svc ML20091E3161992-02-13013 February 1992 Lilco Response to NRC Staff Motion to Dismiss Intervention Petitions on Decommissioning Plan.* Requests That Petitions Be Struck & Petitioners Be Instructed of Possible Dismissal.W/Certificate of Svc ML20091E2741992-02-0606 February 1992 Answer of Long Island Power Authority to Intervention Petitions Concerning Shoreham Decommissioning Plan.* Requests That Petitions for Leave & Requests for Hearing Be Denied.W/Certificate of Svc & Notice of Appearance ML20092D2931992-02-0606 February 1992 Answer Denying Petitions for Leave to Intervene & Request for Prior Hearing Re Decommissioning ML20091E2941992-02-0606 February 1992 Lilco Opposition to Petitioner Request for Hearing on Shoreham Decommissioning Plan.* Informs That Util Opposes Both Requests for Hearing.W/Certificate of Svc ML20091E2831992-01-22022 January 1992 Shoreham-Wading River Central School District Petition for Leave to Intervene & Request for Prior Hearing.* Requests That Petition for Leave Be Granted & Hearing Held. W/Certificate of Svc & Notice of Appearance ML20091E2811992-01-22022 January 1992 Scientists & Engineers for Secure Energy,Inc Petition for Leave to Intervene & Request for Prior Hearing.* Requests That Petition Be Granted & Hearing Be Held.W/Certificate of Svc & Notice of Appearance ML20086T7231992-01-0303 January 1992 Motion of Long Island Power Authority for Leave to File Supplemental Matls.* Requests That Supplemental Memorandum & Supplemental Legislative History Matls Be Filed. W/Certificate of Svc ML20086T7541992-01-0303 January 1992 Memorandum of Long Island Power Authority Concerning Supplemental Legislative History Matls.* Supports Legislative History & Argues That License Not Subj to Termination Under Section 2828.W/Certificate of Svc ML20086Q9281991-12-30030 December 1991 Opposition of Util to Motion for Stay of License Transfer & to Suggestion of Mootness.* Concluded That Relief Sought in Petitioner Motion & Suggestion Should Be Denied. W/Certificate of Svc ML20086Q9171991-12-30030 December 1991 Lilco Opposition to Petitioners Request for Stay & Suggestion of Mootness.* Suggests That Stay Request & Suggestion of Mootness Be Denied.W/Certificate of Svc ML20091H8261991-12-19019 December 1991 Suggestion of Mootness Due to Long Island Power Authority Imminent Demise.* Concludes That If Commission Were to Transfer Shoreham Licenses to Lipa,Nrc Could Find Itself W/Class 103 Facility W/O Licensee.W/Certificate of Svc ML20091H8661991-12-18018 December 1991 Lilco Opposition to SE2 Appeal from LBP-91-26 & LBP-91-39. Concludes That Appeal Should Be Summarily Rejected or Be Denied on Merits.W/Certificate of Svc ML20086N1661991-12-17017 December 1991 Motion for Stay of License Transfer Pending Final Order on Petition to Intervene & Request for Hearing & for Addl or Alternative Stay.W/Certificate of Svc ML20086M0791991-12-16016 December 1991 Certificate of Svc.* Certifies Svc of Petitioner Notice of Appeal & Brief in Support of Appeal in Proceeding to Listed Individuals ML20086J6351991-12-0909 December 1991 Lilco Opposition to Petitioners Contentions on License Transfer Amend.* Concludes That License Transfer Amend Contentions Be Rejected & Petitioner Request to Intervene Denied.W/Certificate of Svc ML20086J3521991-12-0909 December 1991 Response of Long Island Power Authority to Petitioners Joint Supplemental Petition.* Board Should Dismiss Petitions to Intervene for Lack of Standing & Reject All Contentions Proffered by Petitioners.W/Certificate of Svc ML20094E1041991-12-0909 December 1991 Response to Long Island Power Authority to Petitioners Joint Supplemental Petition ML20091G1971991-12-0303 December 1991 Notice of Appeal.* Informs of Appeal of LBP-91-26 & LBP-91-39 in Facility possession-only License Proceeding ML20091G2051991-12-0303 December 1991 Brief in Support of Appeal.* Commission Should Consider Appeal on Basis That Findings of Matl of Facts Clearly Erroneous.W/Certificate of Svc ML20086C5471991-11-18018 November 1991 App to Joint Supplemental Petition of Shoreham-Wading River Central School District & Scientists/Engineers for Secure Energy,Inc.* ML20086C5381991-11-18018 November 1991 Petitioner Joint Supplemental Petition.* Petition Includes List of Contentions to Be Litigated in Hearing Re License Transfer Application.W/Certificate of Svc 1995-10-18
[Table view] |
Text
^
i UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION e
Before the Commission
)
In the Matter of
)
)
LONG ISLAND LIGHTING COMPANY
)
Docket No. 50-322-OL-4
)
(Low Power)
(Shoreham Nuclear Power Station,
)
-Unit 1)
)
)
AFFIDAVIT OF GREGORY C. MINOR CONCERNING SINGLE FAILURE CRITERION AND SHOREHAM EMERGENCY POWER SUPPLIES 1.
My name is Gregory C. Minor.
I am Vice President of MHB Technical Associates ("MHB").
My education background is in electrical engineering (with a power systems option) in which I received a Bachelor of Science and Master of Science degrees.
I have over 24 years of experience in the nuclear industry, includ-ing design and testing of systems for use in nuclear power plants.
Since 1976, I have been employed by MHB and have acted as a consultant to domestic and foreign government agencies and other groups on nuclear power plant safety and licensing matters.
Between 1965 and 1976, I was employed by the GE Nuclear Engineer-ing Division as a design engineer and manager of engineering design organizations.
My responsibilities included the design, testing, qualification, and pre-operational testing of safety equipment and control rooms for use in nuclear power plants.
l l
B502210157 850215 PDR ADOCK 05000322 O
PDR _
L
. l 2.
General Design Criterion 17 requires that emergency power systems for nuclear power plants meet the single failure criterion.
It specifically states:
The onsite electric power supplies, including the batteries, and the onsite electric distribution system, shall have sufficient independence, redundancy, and testability to perform their safety functions assuming a single failure.
Therefore, the alternative means of supplying emergency power proposed by LILCO, in order to be as safe as the safety-related system originally proposed for Shoreham, must also meet the single failure criterion.
3.
During the low power proceeding conducted before Judge Miller, testimony was provided by LILCO, the NRC Staff and Suffolk County regarding' single failure vulnerability of the alternate sources of power proposed by LILCO.
In the NRC's I
testimony of John Knox and Edward Tomlinson, the NRC stated that the proposed system does meet the single failure criterion and
' independence which would be required for the normal safety-related diesel generators located at an. operating nuclear power
. plant.
Testimony of Knox and Tomlinson, at page 6.
Their testi-many included their view that the supplemental power sources were not connected to each other and therefore were independent of each other.
The Staff also relied on their SER to conclude that l
the electrical'eross-connections between the two alternate pro-posed power sources had been sufficiently corrected to preclude a single event or single failure causing failure of both sources of power.
SSER 6, at 8-5.
The Board in making its decision regard-
m
. ing low power operation for Shoreham accepted the NRC's position with regard to the single failure criterion.
Board Decision at 50-51, 54-55, 91.
However, the configurations proposed by LILCO as alternate power sources were not acceptable as first proposed.
The NRC in their brief review of this system disclosed at least several potential single failure points which needed to be modi-fied.
The first_was to leave open breakers which interconnect busses lla and 12a, 11b and 12b, lle and 12c, and 11d and 12d, as shown on FSAR Figure 8.2.1-1.
The Staff also required that the Technical Specifications for Shoreham be revised to require verification that these breakers are open once every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
An additional possible interconnection which represented a poten-tial single failure was discovered by the Staff at the point where two breakers feed the 4.16 kV emergency busses, numbered 101, 102 and 103.
To resolve this problem, the Staff required p
that the automatic transfer between the pairs of breakers on i
these busses be eliminated.
This prevented failures in the auto-i matic transfer system or related wiring from causing a single event or single failure which would cause failure of both sources of alternate power.
Here again, the Shoreham Technical Specifi-cations were changed to reflect the absence of the automatic transfer system and therefore to eliminate the need for testing that system.
Another single failure vulnerability related to fire was identified by the Staff and resulted in the requirement of. physical separation of circuits near the RSST and the NSST.
SSER16, at 8-5, 8-6.
r-I
[. l 4.
Despite the fact that the Staff felt the system met the single failure. criterion during the low power hearings, the latest disclosures of yet another single failure point detract from this finding and in fact render it incorrect.
Breaker 460 between the RSST and bus 11 is yet another point whose single failure could interconnect with the alternate power sources and cause both of them to fail in the event of a short.
None of the single failures which have been identified to date and addressed by changes to the Technical Specifications or plant requirements has been part of a formalized, detailed and documented analysis of potential single failures of the alternate configuration pro-posed by LILCO.
Absent such a formalized and documented study, it is impossible to say that these single failures, discovered at different periods of time, represent all the single failures in the system created by the unothordox addition of external power sources to replace inoperative safety-related emergency diesel generators.
5.
The "fix" proposed in Board Notification 85-009 is t-o rack out or effectively remove breaker 460. -This solution does appear on the basis of preliminary review to solve the identified single failure problem, but there is insufficient analysis to show that the "fix" has not created additional problems.
In fact, the documentation provided to date indicates that several problems do exist.
These are described in the following sub-paragraphs.
(a)
There is no evidence that the procedures which govern operator action during a loss of offsite power (LOOP) have been modified to reflect a change created by removing breaker 460.
Thus, the procedures presume that there is a path which would allow the operator to connect RSST to bus 11, when in fact this cannot be accomplished through the ordinary breaker techniques.
If the operator is to follow alternate procedures in order to power bus 11, such procedures have apparently not been written and have not been reviewed by the NRC.
Further, the use of revised procedures specifically l
created to get around the single failure problems introduced by the alternate power sources, would have
-no_ meaning during and in fact may be misleading for full power operation.
Under full power operation, it-is assumed that safety-related emergency diesel gener-ators will be available and such expedient and system degrading techniques as racking out breakers and
-removing automatic transfer functions would not be tolerated.
Thus, the procedures for full power should be different procedures than the ones that would be created for low power.
Thus, the experience gained by l
operators in using the alternate AC power system will in fact be counter productive in terms of training for later higher levels of power.
l
, (b)
Training of the operators to use the procedures created for low power operation also appears not to have been completed at this time.
Once the procedures are pre-pared and reviewed by the NRC, there will need to operator training in their use in order to have any assurance that the procedures will be followed during emergency conditions.
(c)
In the event of a need to power bus 11 during a LOOP event, one option is to re-rack breaker 460 and close it in to bring power from the RSST to the bus 11.
If this action were taken and a short were to occur during the re-racking or closing of breaker 460, the single failure and shorted condition could cause a loss of' both alternate power sources.
In such an event, the alternative routing proposed by Shoreham would be to go through the Wildwood Substation and reenter the plant through the NSST.
This routing involves additional' procedures which have not been developed at this time, and would require a longer time because of the greater number of steps, the necessary precautions, and the-involvement of system operators.
(d)
The loads on bus 11, according to the FSAR, appear to be mainly 4160 volt, normal station service motor loads.
Most of these. loads probably would not be needed during the initial phases of an emergency, but may be useful at later stages.
However, because LILCO
, has presented no study showing whether they are needed or not and if they are, how they would be powered in the event the EMDs did not start, there is no assurance that the operators will not attempt to power bus 11 from alternate sources.
6.
The modification proposed by LILCO of racking down breaker 460 removes one fundamental element of flexibility from the system as proposed in the FSAR.
Originally, the system consisted of two sources (RSST and NSST) and two load centers (bus 11 and bus 12), connected both directly and by cross-linking through breakers.
This is a classic configuration of connecting two loads to two sources.
However, by elminating the one cross-tie possibility (breaker 460), the system has lost flexibility and is therefore not of the same degree of reliability or safety in the event of an emergency at Shoreham.
At the same time, by eliminating some of the system versatility, there has been an element of uncertainty introduced into the operation of the sys-tem due to the unknown method the operator will use to recreate that path if called upon to do so.
When alternate paths are used to replace the routes otherwise provided by breaker 460, other systems, other busses, and even other substations may have to be called into play.
These actions could well introduce new prob-lems which have not been discovered to date.
Until there has been a thorough study, detailed procedures, and operator train-ing, the 'fix" proposed by LILCO for this single failure problem
.. may actually have introduced additional problems, possibly even single failure problems, which are yet to be discovered.
fG "t-Gregorf C.' Minor Sworn to before me this/
day of February 1985.