ML20105C480
| ML20105C480 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 10/05/1977 |
| From: | Cooke T CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20105C399 | List: |
| References | |
| FOIA-84-96 NUDOCS 8502090424 | |
| Download: ML20105C480 (4) | |
Text
lJ
,7 t t
).
,a 9
/
/
c.
(
,, F-consumers
- "7 Power Company Midland Project: P.o. Son 1963, M kfland, Michigan 48640. Area Code 517 631-o951 0
)
r
~
October 5, 1977
/
Mr. J. G. Keppler, Regional Director Office of Inspection and Enforcement, Region 3 U.S. Nuclear Regulatory Commission Glen Ellyn, IL 60136 MIDLAND PROJECT GWO 7020 - NRC SCHEDULE File:
0652.1 Serial:
2577 Attached are copies of the NRC Schedule Activities Lists for Midland Units 1 and 2 for October 1977. The Construction Percent Complete is 29% for Unit 1 and 34%
for Unit 2.
Engineering is 74% complete.
Changes in the I-J Node Dates are as follows and apply to both units:
1-0, J-7520 Change Start to A9-77 I-7020, J-7155 Change Start to 10-77 I-7235, J-7240 Change Complete to 11-77 I-7240, J-7355 Change Start to 11-77 All other n tion ains the same as reported for ' September 1977.
l
~
T. C. Cooke Project Superintendent TCC/ZAJ/pp CC:
W. G. Lovelace, Chief of Plans Branch MNBB12117, Office of Mgt Information & Program Control U.S. Nuclear Regulatory Commission Washington, D. C.
20555 8502090424 840517 o
'/
RICE 84-96 PDR
/.
Pagt 1 of 4 NRC SCHEDULE FOR MIDLAND UNIT 1 Status Date Construction 29% I omplete C
"[-
CTIVITY I-J Numbers Start Complete i
Install Heat Sinks (Cooling Towers & Cooling Pond) 7045-7890 A8-73, 8-80 Special Nuclear Material License Issued 0-7730 3-78 1-79 Special Nuclear Material Delivered 7730-7815 1-79 10-81 Install Control Room Consoles and Equipment 0-7805 12-77' 11-81 Nuclear. Instrumentation Installation and Calibration 0-7820 2-79 11-81 Accumulation of Environmental Data (One (1) or Two 0-7810 A2-75 A2-77 (2) Years)
Applicant Submits Emergency Plan 0-7735 A2-74 4-78 Applicant Submits Security Plan 0-7740 A2-74 4-78 Install Startup Transformers 0-7520 A9-77.
2-80 Perform NDT on Cables (Megger, Continuity, etc.)
0-7475 4-78 2-81 Applicant Submits QA Program for Operation 0-7745 A2-74 4-78 Install Conduit and Cable Trays 0-7405 A4-77 2-81 Install Batteries and Inverter ~
0-7425 4-78 10-80 Applicant's Review and Approval of Test Results 0-7750 3-80 9-81 Install Primary Auxiliary Switchgear 0-7410 A6-77 2-81 Install Instrumentation Air System 0-7430 10-77, 2-81 Applicant's Preparation of Power Ascension Test 0-7755 12-78 4-80 Program Install Cables (Instrumentation, Control & Power) 0-7415 12-78 2-81 Install Process Instruments 0-7435 10-77 2-81 Control Rod Drive Instrumentation & Operability Test 0-7670 3-81 6-81 Install Motor Control Centers (MCC's) and Secondary 0-7420 AS-77 2-81 Distribution System Process Control & Logic Instrumentation Calibration 0-7440 8-80 2-81 Containment Isolation Test 0-7590 2-81 6-81 Install Diesel Generator and Oil Tank Foundation 7020-7155 10-77 7-78
Pcgm 2 of 4
' NRC SCHEDULE FOR MIDLAND UNIT 1 Status Date ACTIVITY I-J Numbers Start Complete _ i Ins' tall Diesel Generator and Tanks 7155-7445 7-78 6-79 Containment Purge Test 0-7690 2-81 6-81 Tendon Sheath Installation 7070-7130 A6-74 11-79 Tendon Installation and Tensioning 7130-7370 11-79 11-80 Containment Ccmpletion 7370-7595 11-80 4-81 Install RPV Internals 7305-7825 1-80 11-81 Install CRDM 7310-7455 1-80 2-81 Install Piping Hangers & Restraints 7205-7510 4-79 3-81
- Remobilize 0-7005 A3-73 AG 73
- Prepare Site 7005-7015 A6-73 A8-73
- Install Reactor Building Base Mat 7015-7050 A8-73 A7-74
- Install Containment Liner Plant and Concrete Walls 7050-7060 A7-74 A7-77 to Spring Line
- Install Polar Crane 7060-7150 A7-77 A7-77
- Set Dome and Complete Exterior Concrete 7150-7200 A7-77 2-79
- Install RPV 7200-730C 2-79 4-79
- Install Primary Pressure Boundary Piping and All 7300-7450 4-79 12-80 Piping Connected to Primary System Components
- Initial Flush of Reactor Coolant System 7450-7500 12-80 2-81
- Reactor Coolant System Cold Hydro Test 7500-7515 2-81 3-81
- Complete Base-Line Inspection 7515-7600 3-81 5-81
- Hot Functional Test 7600-7700 5-81 7-81
- Containment Integrity and Leak Rate Test 7700-7800 7-81 9-81
- Applicant Submits Program Test Results and 7800-7950 9-81 11-81 Evaluation
- Core Loading 7950-7990 11-81 3-82 Install RPV Pedestal 7163-7165 AS-76 1-79
{ "I
- Pega 3 cf 4 NRC SCHEDULE FOR MIDLAND UNIT 1 October 1977 Status Date ACTIVITY I-J Numbers S' tart Complete _
Integrated Safety Injection System Actuation and 0-7525 2-81 5-81 Flow Test Hot Functional Test MSIV 7628-7630 5-81 7-81 Install Major Component Shielding and Containment 7075-7095 A5-76 2-79 Cooling Install Primary Pumps 7210-7260 4-79 12-80 Integrated Residual Heat Removal System Actuation 0-7530 2-81 5-81 and Flow Test Main Feedwater Control' Test 7623-7625 5-81 7-81 l
Prefabricate Liner Plant and Install Containment 7-80-7170 A3-74 2-79 Penetrations Install 'ressurizer and System 7220-7270 2-79 4-79 P
Install Accumulator 7215-7265 4-79 12-80 Integrated Chemical and Volume Control System Test 0-7460 2-81 5-81 and Charging Pump Flow Test Pressurizer Performance Test 7638-7640 5-81 7-81 Install Containment Interior Concrete 7055-7085-A4-76 2-79 Install Steam Generator 7225-7275 2-79 4-79 Auxiliary Feedwater Control System Test 0-7535 10-79 5-81 Heat-up Rate Test 7643-7645 5-81 7-81 Containment Cooling and Spray 7090-7105 A3-77 3-81 Containment Cooling and Spray System Test 7105-7680 3-81 5-81 Cool-Down Rate Test (Capability) 7648-7650
.5-81 7-81 Install Main Steam Line between MSIV and Turbine 0-7360 5-78 12-80 t
Install Main Steam Line Between MSIV and Steam 0-7365 6-78 12-80 Generator Diesel Generator Test 0-7540 9-79 5-81 Main Coolant Pump Hot Flow Test 7658-7660 5-81 7-81 Install Feedwater Systes 0-7280 4-78 12-80