- f * ** "' M L *. i ll. L' e i L ;
NUCLEAR REGULATORY COMMISSION g
REGION lia 799 ROOSEVELT ROAD j
4 OLEN ELLYN, ILLINOIS 50137
%, *.. * /
Msy 17,1984 Carol M. Rice. Esq.
Kirkland & Ellis 200 East Randolph Drive Chicago. IL 60601
Dear Ms. Rice:
Enclosed as a partial response to FDIA-64-96 are records from the NRC Resident Inspectors' files at Midi,and.
In order to expedite delivery of these records the NRC's FOIA Branch has authorized Region III to provide these records directly to you. These records are your copies and 1
need not be returned to Region III.
We are continuing our search of the Resident Icspectors' files and the files of Dr. Landsman and Mr. Gardner. We will be in contact with you to establish procedures for your inspection of records froen those files that fall within the scope of your FOIA request.
Please continue to contact Stephen Lewis, Regional Counsel, with any questions you say have regarding Region III's response to FOIA-84-96.
Sincerely, Original signed by Gen W. Roy i
Gen W. Roy. Acting Director i
Division of Resource Managenent and Administration l
Enclosure:
As stated cc w/ enc 1: Linda Robinson FDIA Branch i
i i
t i
1 l
l kog2fg 02 e4o327 RICE 84-96 ppg
DOCUMENTS SUbMITIED F0k RELEASE 8/30/77 Memorandus Hayes to Cook et al - Reactor Project Assignments 3 pages 10/5/77 Letter Cooke to Keppler - transmitting copies of the NRC Schedule Activities Lists for October 4 pages 11/8/77 Memorandus Hayes to Henderson - ASLB requested data 2 pages 12/8/77 Letter Cooke to Keppler - transmitting copies of the NRC Schedule Activities Lists for December 9 pages 4/28/78 Memorandum Spessard to Reinmuth - Failure to Identify Certain Class IE System Components to be Covered by CP's QA Manual 1 page 5/3/78 Memorandum Spessard to Reinmuth - Apparent Noncompliance with 10 CFR 50.55a(h) (IEEE 279) - Identification of Components I page 9/27/78 Memorandun Hayes to Project Section Inspectors - Noncompliance History for Reactor Facilities Under Active Construction 29 pages 10/17/78 Meterandu: Hayes to Project Section Inspectors - Reactor Ir:jtet As signment s 3 pages 10/30/7E Me ;randur Hayes to Project Section Inspectors - Statistical Dart for Keactors Under Construction 56 pages 1/11/7c Mer:randu: Hayes to Hansen - Review and Evaluation Material Suiritted per ALAB 106 Condition 4 1 page S/6/79 Memorandu-Hayes to Fiore111 - Additional Inspection Effort Lccuired at Midland Units 1 and 2 2 pages 9/27/79 Merc randut Knop to Fiore111 - Midland Nonconformances and Le:atti Locuments I page 12/6/79 i: :c Case /Stello to Howell - transmitting Order Modifying c:.<:
etion Pertits 15 pages 4/6/80 Ftrt :: :tport - American Warming and Ventilating Inc 4 pages 4/30/80 Mor:rindu: Callagher to Fiore111 - CP's Answer to Notice of Heardn; 3 pages 8/8/80 Management Corrective Action Request / Report - re Part 21 Report 33 pages 9/16/80 Memorandum Hood to File - Summary of 8/25/80 meeting on licensing status of the Midland units 1 aci 2 6 pages 12/10/80 Letter Cook to Denton - concerning timely resumption of.
formal docket review 3 pages
e Appendix A, pace 2 FOIA REOUEST 84-96 1/7/81 New Announcement 81 NRC Staff Proposes $38,000 Fine 1 page 2/13/81 Letter Cook to Keppler - assigning numbers to 50.55(e) reports 6 pages 2/13/81 Memorandum Cook to Knop - Need for Increased Inspection Effort - Electrical Area 2 pages 5/8/81 Letter Selby to Denton - re concern about NRC's projected licensing schedule 2 pages 6/2/81 Routing and Transmittal slip Jones to Cook w/ letter 5/26/81 Stamiris to Keppler 7 pages 6/9/81 Letter Denton to Selby - re licensing schedule 4 pages 6/29/81 Letter unsigned Bechtel to Whom It May Concern - revision to Midland Plant Reference Drawings 22 pages 12/18/81 Budwani to Cook - re Case Load Forecast Panel w/ copy of 8 pages 2/9/82 response Cook to Budwani 1/25/82 Cook to Denton - responses to NRR questions 1 page 2/11/82 Letter Cook to Denton - information on licensee qualification 7 pages 3/26/82 Letter Gadler to Marshall - comments and questions on NRC Findings of Fact and Conclusions of Law prepared by Pryzina - copy of Marshall's 1tr 3/25/82 to ASLB attached 14 pages 3/30/*S, Letter Gadler to Marshall - re additional information on generic unresolved safety issues 7 pages 4/9/82 Memorandum Spessard to Eisenhut - Recommendation of Board Notification 1 page 4/12/82 Handwritten memo to file - re meeting with intervenors 4 pages 5/14/82 Letter Miller to Davis - identifying the current scope of the ASLB Memorandum and Order re remedial soils work 2 pages 5/29/82 Letter Stamiris to Okrent - statement re soils issues 7 pages 6/25/82 Letter Cook to Denton - transmitting Amendment 105 to application 3 pages 7/9/82 Memorandum Cook to Midland Site Files - Anonymous telephone call to J. G. Keppler - movement of records 6 pages 8/6/82 Memorandum Cock to Spessard - SALP III Evaluation Period 2 pages 8/10/82 Bechtel Stop Work Order - Soils and soils related work 2 pages
4 r
/:;;tn.>
FoiA Li s.
r
-v s.
i 9/17/82 Memorandum Cook to Foster - Request of B. Stamiris w/
18 pages i
request attached 11/3/82 LetterCook to Denton - re the concept of the independent safety engineering group 17 pages 11/4/82 Memorandum Weil to Foster - Contact w/ Congressional Administrative Assistant 1 page 12/3/82 CP News Release - re completion plan 2 pages 12/16/82 Memorandum Cook to Region III File - managment meeting with Bechtel Corporation w/o attachment 1 page 2/3/83 EN-83-07 Proposed Imposition of Civil Penaly $120,000 1 page 2/8/83 CP News Release - re Civil Penalty 1 page 3/28/83 Letter Millar to Rutgers - re Bechtel administrative guidelinea 1 page 6/6/83 Oral Communications Record Wells, Meisenheimer, Harrison, Gardner, Burgess, Cook'- US Testing Audit 1 page 7/7/83 Memorandum Peck to Miller - re meeting regarding BWCC hangers 2 pages 7/21/83 Memorandum Warnick to Eisenhut - Recommendation for Notification of Licensing Board 3 pages 7/27/83 Memorandum Peck to Miller - meeting to discuss recent observations by the NRC 2 pages 9/13/83 Memorandum nnd Order requiring further hearings on new management organization 3 pages 9/1/83 Daily Report - resignation of Miller, Midland site manager 1 page 9/6/83 Memorandum Balazer to Miler - meeting re HVAC inspection effort 6 pages 9/9/83 Daily Report - Part 21 report re inflatable personnel air lock seals 1 page 9/21/83 Letter Miller to Hierzer - directing Bechtel to stop work on OQKA-Fire Detection and Alarm 1 page 9/30/83 Memorandum Burgess to Roy - Alleged QA Progrr.mmatic Deficiencies at Midland 2 pages 10/6/83 Memorandum Burgess to Harrison - Documentation of Midland 2 pages concerns
6 r
Appendix A, page 4 Fo1A REQUEST 84-96 10/6/83 EN 83 Confirmatory Order for Modification of Construction Permits - Effective Immediately 1 page 10/7/83 Daily Report - re proposed enforcement conference and stop work order 1 page 10/7/83 CP News Release - comprehensive program to provide the planning and managment for completion of the Midland plant 2 pages 10/13/83 Between the Lines - Midland news 3 pages 10/22/83 Stop Work Order - All "Q" work to Bechtel dwgas and Spec's 3 pages 10/31/83 EN 83-69A - Modification to EN 83 notification that proposed civil penalty was not issued 1 page 11/9/83 CP News Release - re dalay in commercial operation at Midland Plant 2 pageu 11/30/83 CP Clipping Sheet - fm Saginaw News - Soils Work Under NRC Scrutiny 1 page 12/6/83 Letter Miller to Cook - re document distribution 2 pages 1/17/84 CP News Release - re order confirming agreement for an independent appraisal of the management of the Midland plant 1 page 1/18/84 Memorandum Norelius to DPRP Staff - Periodic Briefings.
2 pages on plant status 1/19/84 CP News Release - re lifting of part of the stop work order 1 page 2/13/84 Statement of Billie,Pirner Garde on the Midland Power Plant 22 pages 2/28/84 Letter Cook to Keppler - transmitting list of items reviewed by CO and ready for review and closure by NRC 16 pages 3/1/84 Memorandum Lewis to Keppler - Dow Litigation 2 pages 3/8/84 Between the Lines - Midland news 1 page 3/16/84 Between the Lines - Midland news 1 page 3/16/84 Daily Report - report of potential 50.55(e) re civil structural design inadequacies 1 page 3/27/84 Between the Lines - Midland news 1 page L
l
.; ; t ndi). A. Ten 5 1 c /. + *.
)
4/2/84 Daily Report - re termination of employees.
2 pages potential 50.55(e) re Foxboro Printed Circuit Modules and piston skirt castings 4/9/84 Letter Garde to Keppler/DeYoung - re independent management audit 3 pages 4/9/84 Between the Lines - Midland news 1 page 4/10/84 CP News Release - re completion of plant 1 page 4/12/84 Between the Lines - Midland news 2 pages 4/12/84 CP Clipping Sheet e Midland Daily News - N-Plant Audit Unacceptable to Regulators I page 4/12/84 CP News Release - re confusion regarding rework assumptions in the new project schedule 1 page 4/17/84 Daily Report - re meeting w/ Management representatives 1 paFe Undated Page 2 of Daily Staff Notes - re press release announcing rerfred schedule I paFe Undeted Notes - re audit progra=s "A"
9 pages Un6ctec' "oter - marked "B" 42 pages Undeted
/. rendix 35 - Compliance of Midland Plant Units I and 2 v/::PC Regulations of 10 CFR Parts 20, 50 and 100 23 pages 4 /18/E 2 tctter sineleir to Keppler re information regarding dc2ter 2 paper 2/17/64 Ecuting and Transmittal Slip - Lewis to Harrison /
Landstan/Gardner/ Cook w/ GAP's letter 2/10/84 Il pages
)
-