Text
_
+ -
4
& lI ?
4'
/
}o UNITED STATES o
NUCLEAR REGULATORY COMMISSION b
.E REGION lli
{
(j*
799 ROOSEVELT ROAD V
GLEN ELLYN,ILLINols 60137 September 3Q, 1983 m
MEMORANDUM FOR:
G. W. Roy, Assistant to the Administrator THRU:
J. J. Harrison, Chief, Midland Section FROM:
B.
L. Burgess, Resident Inspector, Midland Site
SUBJECT:
ALLEGED QUALITY ASSURANCE PROGRAMMATIC DEFICIENCIES AT MIDLAND On September 28, 1983, I was approached at the NRC trailers on site by a member of the Midland Plant Quality Assurance Department (MPQAD) to dis-cuss concerns with the identification, documentation, and verification of nonconformances. The individual stated that other members of Quality Assurance / Quality Control had documented nonconformances which they were not allowed by management to address through the use of an NCR.
The alleger could not provide names because either most of the individuals he had talked with wished to remain anonymous, or he had been informed second hand. He felt that QA/QC personnel with outstanding problems should be allowed to input their concerns into the NCR system. He also felt that management should direct QA/QC personnel to input their concerns using the applicable document in accordance with the plant Quality Assurance Manual, CPC-1A.
More recently, the alleger stated that he was told by a member of QA that a Consumers ' NCR associated with ASME requirements was dispositioned without allowing the ANI to implement a hold point as required by the code.
The MPQAD member stated he has been employed on site since May, 1983, and was attempting to inform his management of the lack of control associated with the Nonconformance system. He felt he could receive proper resolution from CPCo QA management by expressing his concerns to the NRC and then inform-ing his management that he had done so.
The alleger provided me with a Quality Action Request (QAR) issued by CPCo which is used to document programmatic nonconformances. Additionally, an in-ternal memo was issued on September 28, 1983, obligating anyone within the Quality Organization who has knowledge of nonconforming conditions to docu-ment such nonconforming conditions, or receive disciplinary actions. The 8502090599 840517 PDR FOIA PDR RICE 84-96
o
,O G. W.
Roy September 30, 1983 combination of adequate resolution to the QAR and the adherence 'to the memo should resolve all of the allegers concerns at the Midland Site.
u g.
i
)
h
'd #f B. L. Burgess Resident Inspector Midland Site
Enclosures:
CPCo memo to MPQAD Personner from RA Wells,~dtd 9/28/83 MPQAD QAR No. RA 50017 cc w/o ence R. Cook N
R. Gardner b
6
IQl-
\\
k EN 83-64 October 6, 1983
?
OFFICE OF INSPECTION AND ENFORCE' MENT NOTIFICATION OF SIGNITICANT ENFORCLMENT ACTION Consumers Power Company I
Midland Nuclear Power Plant, Units 1 and 2 Licensee :
Docket Nos. 50-329 and 50-330 Confirmatory Order for Modification of Construction Permits (Effective lainediately)
Subject :
finnatory Order for Modifications
,This is to infonn the Comission that a conof Construction Permits (
issued to Consumers Power Company this date.
under which construction activities halted by the licensee o to provide reasonable assurance that the facility can be completed in accor-may resume.
dance with regulatory requirements.
. Contact :
J. Stone, IE 29656 R. Heishman, IE 29644 Willste 9/ 7 MNB8 /l5'/
Phillips @Sf EW Distribution _
1 IE NMSS H St y m, lladino EDO NRR RES Chairman Pa 01 Com. Gilinsky DED/ROGR OIA Com. Roberts ELD AE00 Com Asselstine PA
- Com. Bernthal Air Rightsfoo ACRS SP SECY RM MAIL CA Regional Offices ADM: Doc. Mgt. Br.
PE RI
__RIV RIT RV RIIT
' 'I'^ '-
llfi$4
,u. e eVQ
.: