ML20149K062
| ML20149K062 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 06/30/1997 |
| From: | Hagan J, Lin S ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GNRO-97-00064, GNRO-97-64, NUDOCS 9707290228 | |
| Download: ML20149K062 (5) | |
Text
!
Entergy Oper;tions, Inc.
h[
Pat G bso MS 39150 Tel 601437 6408 Fax 601437 2795 Joseph J. Hagan July 9, 1997 ggom Grand Guit Nuclear Station U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C. 20555 Attention:
Document Control Desk
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-97/00064 Gentlemen:
In accordance with the requirement of Technical Specification 5.6.4, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit i for June 1997.
If you have any questions or require additional information, please contact this office.
Yours truly,
-(1
$J
/ cwt attac ents: 1.
Operating Status 2.
Average Daily Power Level GTg 3.
Unit Shutdown and Power Reductions cc:
(See Next Page) k
)
i 9707290228 97063G PDR ADOCK 05000416' R
PDR,
l
4 GNRO-97/00064 Page 2 of 3 cc:
Mr. D. C. Hintz (w/a)
Mr. N. S. Reynolds (w/a)
Mr. Jager Smith (w/a)
Mr. H. L. Thomas (w/o)
Ms. K. D. Weaver (w/a)
Mr. Leonard J. Callan (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011 Mr. Jack Donohew, Project Manager i
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555
l
' to GNRO-97/00064 DOCKET NO 50-416 DATE 07/03/97 COMPLETED BY S.D.Un TELEPHONE (C01) 437-6793 OPERATING STATUS 1,
Unit Name: GGNS UNIT 1 2.
Reporting Period: JUNE 1997 3.
Licenseo Thermal Power (MWt): 3833 MWT 4.
Nameplate Rating (Gross MWe): 1372.5 MWE 5.
Design Electrical Rating (Net MWe): 1250 MWE 6.
Maximum Dependable Capacity (Gross MWe): 1250 MWE 7.
Maximum Dependable Capacity (Net MWe):
1200 MWE 8.
If changes occur in Capacity Ratings (items 3 through 7) Since Last Report. Give Reason:
N/A 9.
Power Level To Which Restricted, if Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
N/A This Month Yr to Date Cumulative
- 11. Hours in Reporting Period 720 4.343 111.303
- 12. Number of Hours Reactor was Critical 720.0 4.343.0 92.322.0
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 720.0 4.343.0 89.219.9
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2.755.535 16.566.813 319.685.849
- 17. Gross Electrical Energy Generated (MWH) 921.021 5.632.149 102.904.080
- 18. Net Electrical Energy Generated (MWH) 835.689 5.419.182 98.643.527
- 19. Unit Service Factor 100.0 100.0 81.9
- 20. Unit Availability Factor 100.0 100.0 81.9
- 21. Unit Capacity Factor (Using MDC Net) 102.5 104.0 80.5
- 22. Unit Capacity Factor (Using DER Net) 98.4 99.8 73.6 23 Unit Forced Outage Rate 0.0_ __
0.0 6.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down At End of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/2C/84 COMMERCIAL OPERATION 07/01/85
..... - ~ -.
t l
' to GNRO-97/00064 DOCKET NO 50-416 DATE 07/03/97 COMPLETED BY S. D. Lin TELEPHONE (601) 437-6793 MONTH June 1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1248 17 1232 2
1245 18 1232 3
1244 19 1230 4
1241 20 1225 5
1241 21 1224 6
1240 22 1224 7
1239 23 1224 8
1238 24 1227 9
1234 25 1230 10 1234 26 1229 11 1233 27 1226 12 1234 28 1198 13 1228 29 1227 14 1205 30 1223 15 1227 31 N/A 16 1221 i
I
i i
- to GNRO-97/00064 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-416 UNITNAME GGNS Unit 1 l
DATE 07/03/97 COMPLETED BY S. D. Lin i
TELEPHONE (6011437-6793 4
REPORT MONTE June 1997 No.
Date Type (1)
Duration Reason Method Of Licensee Event System Code Component Cause & Correctin Action To Prevent Hours (2)
Shutting Down Report #
(4)
Code (5)
Recurrence (C&CA)
Reactor (3)
None 1
2 3
4 S-F: Forced Reason:
Metixxt:
Exhibit G - Instructions for Preparation of Exhibit 1 - Sarre Source S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG4161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction
-cContinued E-Operator Training &
5-Reduced load Licensing Examination 6-Other F-Administratin G-Operational Error (Explain)
H-Other (Explain) e b
e e
9
-~
,