Text
.
Ll' g
= ENTERGY ETMf"'"~"*'
Port Gtson,MS 39150 l
.r Tel 601437 2800 l
C. R. Hutchinson voc Resoam C4mfatKA July 14, 1995 on once, sw,
i i
l U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C. 20555 Attention:
Document Centrol Desk
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-95/00082 Gentlemen:
In accordance with the requirement of Technical Specification 5.6.4, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for June 1995.
If you have any questions or require additio Iin mation, please contact this office.
Yours truly,
' /
I' CRH/TMC attachments:
1.
Operating Status 2.
Average Daily Power Level 3.
Unit Shutdown and Power Reductions cc:
(See Next Page)
OObU#,/
9507190346 950630 l'l PDR ADOCK 05000416 i
R PDR
4 1
July 14, 1995 GNRO-95/00082 Page 2 of 3 cc:
Mr. D. C. Hintz (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (wla)
Mr. J. E. Tedrow (w/a)
Mr. H. L. Thomas (w/o)
Mr. Stewart D. Ebneter (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region 11 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. P. W. O'Connor, Project Manager Office of Nuclear Reactor Regulation i
U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 i
i 6
l i
I i
,,..........=_,,.,_.~.-.--,,...-.....-....,..,....-,....-.-..~..m
...., _...... __. -.. -. _,...,...I
AttschmInt 1 to GNRO-95/00082 DOCKET NO 50-416 DATE 07/06/95 COMPLETED BY S. D. Lin TELEPHONE (601) 437-6793 OPERATING STATUS 1.
Unit Name: GGNS UNIT 1 2.
Reporting Period: June 1995 3.
Licensed Thermal Power (MWt): 3833 MWT 4.
Nameplate Rating (Gross MWe): 1372.5 MWE 5.
Design Electrical Rating (Net MWe): 1250 MWE 6.
Maximum Dependable Capacity (Gross MWe): 1190 MWE 7.
Maximum Dependable Capacity (Net MWe): 1143 MWE i
8.
If changes occur in Capacity Ratings (Items 3 through 7) Since Last Report. Give Reason:
N/A 9.
Power Level To Which Restricted, if Any (Net MWe):
N/A
- 10. Reasons For Restrictions, if Any:
N/A This Month Yr to Date Cumulative
- 11. Hours in Reporting Period 720 4.343 93.759
- 12. Number of Hours Reactor was Critical 368.5 2.839.1 75.990.1
- 13. Reactor Reserve Shutdown Hours O
O O
- 14. Hours Generator On-Line 254.8 2.712.4 73.058.9
- 15. Unit Reserve Shutdown Hours O
O O
- 16. Gross Thermal Energy Generated (MWH) 815.298 10.004.754 258.848.249
- 17. Gross Electrical Energy Generated (MWH) 263.233 3.255.116 82.576.615
- 18. Net Electrical Energy Generated (MWH) 251.795 3.123.138 79.109.279
- 19. Unit Service Factor 35.4 62.5 79.9
- 20. Unit Availability Factor 35.4 62.5 79.9
- 21. Unit Capacity Factor (Using MDC Net) 30.6 62.9 77.6
- 22. Unit Capacity Factor (Using DER Net) 28.0 57.5 70.5
- 23. Unit Forced Outage Rate 45.1 8.3 6.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation).
Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85
--~
e,--,
Attachm nt 2 to GNRO-95/00082 DOCKET NO 50-416 DATE 07/06/95 COMPLETED BY S. D. Lin TELEPHONE 1801) 437-6793 MONTH June 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 60 5
0 21 264 6
0 22 669 7
0 23 1148 8
0 24 1087 9
0 25 1208 t
10 0
26 1201 11 0
27 1212 12 0
28 1213 13 0
29 1214 14 0
30 1216 15 0
31 N/A 16 0
i
)
I e
3
., _,,.. ~. ~.. _
4
...__,.._4-.
... =
.,.,e...
,_,..m.
,,..,,,.......... _., _.. _ ~.
' to GNRO-95/00082 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-416 UNIT NAME GGNS Unit I
- DATE 07/06/95.
COMPLETED BY S.D.Lin TELEPHONE (601)437-6793 1
REPORT MONTil June 1995 No.
Date Type (1)
Duration Reason Method Of Licensee System Code Component Cause & Corrective Action To Hours (2)
Shutting Event Report #
(4)
Code Prevent Recurrence (C&CA)
Down Reactor (5)
(3)95-003 04/15/95 S
249.1 C
4 N/A N/A N/A Scheduled Refueling Outage #7 extended because of generator stator leak repairs.95-004 06/11/95 F
68.7 A
2 N/A N/A N/A Reactor scram to replace Reactor Recirculation Pump "A" #1 Seal.
1 I
95-005 06/14/95 F
140.7 A
2 N/A N/A N/A Reactor scram to replace Resctor i
Recirculation Pump "A" #1 Seal due to second failure.
1 95-006 06/20/95 S
68 Il 6
N/A N/A N/A Taken off grid for turbine oversped test.
t 1
2 3
4 5
l F: Forced Reason:
Method:
Exhibit G - Instructions for Preparation of Exhibit 1 - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensce Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG-0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Training &
5-Reduced load Licensing Examination 6-Other F-Administrative G-Operational Error (Explain) l H-Other (Explain) t 1
.