Monthly Operating Rept for May 1996 for Grand Gulf Nuclear Station Unit 1
ML20112J188
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 05/31/1996
From: Hutchinson C, Lin S
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-96-00065, GNRO-96-65, NUDOCS 9606190317
Download: ML20112J188 (5)


Text

i i

I-Ent rgy Cperstirns,Inc.

=== ENTERGY no a> 7so Rr1 G own MS 39 F4 T+4 M1437 2800 C. R. Hutchinson w F,un:n

\\\\ t4]lY:' S GrstrJ GJ hs.hw U3fcn June 14. 1996 U.S. Nuclear Regulatory Commission Mall Station P1-137 Washington, D.C. 20555 Attention:

Document Cor, trol Desk

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF 29 Monthly Operating Report GNRO-96/00065 Gentlemen:

In accordance with the requirement of Technical Specification 5.6.4, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for May 1996.

- if you have any questions or require additional information, please contact this office.

Yours truly, j

g

[

CRH/CWG attachments:

1.

Operating Status 2.

Average Daily Power Level 3.

Unit Shutdown and Power Reductions cc:

(See Next Page) r 4> r) f,4 ei 200022 9606190317 960531

}

I PDR ADOCK 05000416 R-PDR

i 1

June 14, 1996 GNRO-96/00065 Page 2 of1 cc:

Mr. D. C. Hintz (w/a)

' Mr. R. B. McGehee (w/a) -

Mr. N. S. Reynolds (w/a)'

Mr. J. E. Tedrow (w/a)

Mr. H. L. Thomas (w/o)

Mr. Leonard J. Callan (w/a) -

)

Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011 4

Mr. Jack Donohew, Project Manager '

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mall Stop 13H3 Washington, D.C. 20555 r

4 4

Y i.

1

~

Attichm:nt 1 to GNRO-96/00065 i

DOCKET NO 50-416 DATE 06/13/96 COMPLETED BY S. D. Lin TELEPHONE (601) 437-6793 OPERATING STATUS 1.

Unit Name: GGNS UNIT 1 2.

Reporting Period: May 1996 3.

Licensed Thermal Power (MWt): 3833 MWT 4.

Nameplate Rating (Gross MWe): 1372.5 MWE 5.

Design Electrical Rating (Net MWe): 1250 MWE 6.

Maximum Dependable Capacity (Gross MWe): 1222 MWE 7.

Maximum Dependable Capacity (Net MWe): 1173 MWE 8.

If changes occur in Capacity Ratings (Items 3 through 7) Since Last Report. Give Reason:

9.

Power Level To Which Re,tricted, if Any (Net MWe):

N/A

10. Reasons For Restrictions, if Any:

N/A This Month Yr to Date Cumulative l

11. Hours in Reporting Period 744 3647 101.823
12. Number of Hours Reactor was Critical 744.0 3647.0 83.838.0
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 744.0 3647.0 81.545.5
15. Unit Reserve Shutdown Hours 0

0 0

l

10. Gross Thermal Energy Generated (MWH) 2.834.666 13.873.458 288.106.990
17. Gross Electrical Energy Generated (MWH) 937.203 4.639.866 92.309.057 l
18. Net Electrical Energy Generated (MWH) 900.548 4.459.342 88.458.987
19. Unit Service Factor 100.0 100.0 81.3
20. Unit Availability Factor 100.0 100.0 81.3 i
21. Unit Capacity Factor (Using MDC Net) 103.2 104.2 79.5
22. Unit Capacity Factor (Using DER Net) 96.8 97.8 72.4
23. Unit Forced Outage Rate 0.0 0.0 6.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refuelino Outaae # 8 beoinnino at 0000 hour0 days <br />0 hours <br />0 weeks <br />0 months <br /> on 10/19/96 for 30 days.

25. If Shut Down At End of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Op: ation):

Forecast Achieved INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY 10/20/84 COMMERCIAL OPERATION 07/01/85 a

1 i

f

Attichment 2 to GNRO-96/00065 l

DOCKET NO.

50-416 DATE 06/13/96 COMPLETED BY.

. S. D. Lin i

I TELEPHONE (601)437-6793 MONTH May 1996 DAY' AVERAGE DAILY POWER LEVEL

' DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1229 17 1207 2

1221 18 1207 s

3' 1216 19 1207 i

4 1210 20 1204~

5 1205 21 1207 i

i 6

1206 22 1211 i

.7 1208 23 1211 l

8 1208 24 1190 i

.L 9

1208 25 1207 10 1199 26 1209 r

11 1214 27 1205 12 1224 28 1206 l

3-13 1220 29 1219 14 1209 30 1222 15 1208 31 1220 t

16 1207 t

t t

O 0

Anrh at 3 to GNRO-96M0065 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-416 UNIT NAME GGNS Unit 1 DATE 06/13/96 COMPLETED BY S. D. Lin TELEPHONE (601)437-6793 -

REPORT MONTH May 1996 No.

Date Type (1)

Duration Reason Method Of Licensee Sptem Code Cv=.pc.c.t Cause & Correctist Action To Hours (2)

Shutting Event Report #

-(4)

Code Present Raouma (C&CA)

Domt Reactor (5)

(3) l None l

l l

l

'l-2 3

4 5

F: Forced Reason:

Method:

Exhibit G - Instructions for Preparation of Exlutit 1 - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensee Estnt B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG4161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Training &

5-Reduced load Licensing Examination 6-Other F-Administratist G-Operatiorial Error (Explain)

HOher (Explain) e.%,,.g,m.,

w.pg-<m p

--..,.~,,g-m e

%-we

,.--y-,--w

.y 3

m.

gg-

.-a m-~,

_q

..,we=y g

e-

..gr.,.

y

.W-e i.e,,

.c,-

y p,...m e-

,.p-

-