ML20095F405
| ML20095F405 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 11/30/1995 |
| From: | Hutchinson C, Lin S ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GNRO-95-00135, GNRO-95-135, NUDOCS 9512190003 | |
| Download: ML20095F405 (6) | |
Text
.
8 NTERGY i
cr2 E E'IT I'"" " '"*'
Purt G tw n MS 39150
~d 60 t 437 2%0 C. R. Hu tchin son v:A or
'g
.r V.. a,
r b t! (*.
^
un r
c December 14, 1995 U.S. Nuclear Regulatory Commission Mail Station P1 137 Washington, D.C. 20555 Attention:
Document Control Desk
SUBJECT:
Grand Gulf Nuclear Station Unit 1
=
Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO 95/00135 Gentlemen:
In accordance with the requirement of Technical Specification 5.6.4,' Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for November 1995.
1 If you have any questions or require additionalinformation, please contact this office.
Yours truly kl$
CRH/TMC attachments:
1.
Operating Status 2.
Average Daily Power Level 3.
Unit Shutdown and Power Reductions cc:
(See Next Page) a eo-
.i v t 2.}
9512190003 951130 n'
R PDR j
/r'3 PDR ADOCK 05000416 I
g v
~
December 14,1995 GNRO 95/00135 Page 2 of 3 cc:
Mr. D. C. Hintz (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. J. E. Tedrow (w/a)
Mr. H. L. Thomas (w/o)
Mr. Leonard J, Callan (wla)
Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011 Mr. P. W. O'Connor, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 i
4
December 14,1995 GNRO 95/00135 Page 3 of 3 bec:
Ms. T. M. Carter (w/a)
Ms. C. W. Gunn (w/a)
Mr. B. C. Holifield (LPP 11D)(w/a)
Mr. L. King (GE) (w/a)
Mr. R. J. King (ANO)(w/a)
Mr. S. D. Lin (w/a)
File (LCTS)/(RPTS) (w/a)
File (NS&RA) (w/a)
File (Central) (w/a) (8)
INPO Records Center (w/a)
Mr. D. P. Galle 700 Galleria Parkway 162 Ruth Drive Atlanta, Georgia 30339 5957 Mokena, IL 60448 Mr. Marcus Ware (w/a)
Manager of Production South Mississippi Electric Power Association P.O. Box 15849 Hattiesburg, MS 39401 Mr. Fred Yost (w/a)
Director Research Services Utility Data institute 1700 K Street, N.W.
Suite 400 Washington, D.C. 20006 y.
ccmail:
Mr. P. W. Alberstadt (w/a)
Mr. D. G. Bost (w/a)
Mr. C. A. Bottomiller (w/a)
Mr. R. N. Buckley (w/a)
Mr. S. A. Burris (w/a)
Mr. L. F. Dale (w/a)
Mr. J. G. Dewease (w/a)
Mr. M. A. Dietrich (w/a)
Mr. J. L. Ensley (ESl) (w/a)
Mr. J. J. Fisicaro (RB) (w/a)
Mr. C. C. Hayes (w/a)
Mr. C. V. Hicks (w/a)
Mr. M. J. Meisner (w/o)
Mr. R. V. Moomaw (w/a) l Mr. D. L. Pace (w/a) i Mr. R. L. Patterson (w/a)
Mr. T. E. Reaves (w/a)
J Mr. D. W. Vinci (W3) (w/a) 1 Mr. R. G. West (w/a)
Mr. M. J. Wright (ECH/660)(w/a) i i
1
._ _ _ _ _ _._.__ _...-~ _. _ ---._. _ _. - _
- to GNRO 95/00135 DOCKET NO 50-416 DATE 12/05/95 COMPLETED BY S. D. Lin TELEPHONE (601) 437 6793 OPERATING STATUS 1.
Unit Name: GGNS UNIT 1 2.
Reporting Period: Eovember 1995 3.
Licensed Thermal Power (MWt): 3833 MWT 4.
Nameplate Rating (Gross MWe): 1372.5 MWE 5.
Design Electrical Rating (Net MWe): 1250 MWE I
6.
Maximum Dependable Capacity (Gross MWe): 1222 MWE 7.
Maximum Dependable Capacity (Net MWe): 1173 MWE 8.
If changes occur in Capacity Ratings (items 3 l
through 7) Since Last Report. Give Reason:
9.
Power Level To Which Res'tricted, If Any (Net MWe):
N/A _
- 10. Reasons For Restrictions, if Any:
N/A J
l I
This Month Yr to Date Cumulative 11 Hours in Reporting Period 720 8.016 97.432
- 12. Number of Hours Reector was Critical 720.0 6.295.9 79.447.0
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 720.0 6.088.0 76.434.5
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 2.759.536 22.557.682 271.401.177 17 Gross Electrical Energy Generated (MWH) 925.782,,
7.393.980 86.715.479
- 18. Not Electrical Energy Generated (MWH) 890.142 7.096.859.
83.083.000
- 19. Unit Service Factor 100.0 76.0 80.4
- 20. Unit Availability Factor 100.0 76.0 80.4
- 21. Unit Capacity Factor (Using MDC Net) 105.4 76.7 78.2
- 22. Unit Capacity Factor (Using DER Net) 98.9 70.8 71.2
- 23. Unit Forced Outage Rate 0.0 8.2_
6.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved j
INITIAL CRITICALITY 08/18/82 INITIAL ELECTRICITY
.10/20/84 COMMERCIAL OPERATION 07/01/85
AttachmGnt 2 to GNRO 95/00135 DOCKET NO 50 418 DATE 12/05/95 COMPLETED BY S. D. Lin TELEPHONE (601) 437-6793 MONTH November 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) 1 1218 17 1241 2
1213 18 1226 3
1246 19 1233 4
1249 20 1228 5
1247 21 1241 6
1225 22 1242 7
1218 23 1232 8
1244 24 1248 9
1241 25 1229 10 1224 26 1236
)
11 1226 27 1219 12 1249 28 1247 13 1237 29 1249 14 1246 30 1247 15 1242 31 N/A 16 1247
~
y-w-
- to GNRO-93/00135 UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-416 UNIT NAME GGNS Unit 1 DATE
_1_2/05/95 COMPLElliD BY E D. Lin TELEPIIONE (601M37-6793 REPORT MONTil November 1995 No.
Date Type (1)
Duration Reason Method Of Licensee Systera Code Component Cause & Corrective Action To llours (2)
Shutting Down Event Report #
(4)
Code Prevent Recurrence (C&CA)
Reactor (5)
(3) lMac l
i I
I l
l l
l l
l I
2 3
4 5
F: Forced Reason:
Method:
Exhibit G - Instructions for Preparation of Exhibit 1 - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual Data Entry Sheets for Licensee Event B-Maintenance or Test 2-Manual Scram Report (LER) File (NUREG-0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continued E-Operator Training &
5-Reduced load Licensing Examination 6-Other F-Administrative G-Operational Error (Explain)
II-Other(Explain)
-